Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lift Station #5 Basin Improvements, City of Gig Harbor, WA #CIP-2313

Closed
CIP-2313State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The City of Gig Harbor, Washington, is soliciting bids for the Lift Station #5 Basin Improvements project, identified as CIP-2313. The scope of work involves the installation of a new dry pit lift station and a generator enclosure building equipped with a new generator, electrical panels, and control panels. Additionally, the project requires the installation of various utility lines, including sanitary sewer, conduits, drain lines, and intake and exhaust air systems. Infrastructure upgrades include the application of cured-in-place pipe liners for existing gravity sanitary sewer pipes, epoxy coating for existing manholes, and the construction of new concrete stairs and sidewalks, followed by full site restoration. All construction must be performed in accordance with the provided drawings and specifications. The project timeline allows for 240 working days for construction, with a total of 260 days allotted for physical completion. Interested parties may contact Project Manager Steven Demmer for further information regarding this local government solicitation.

General Info

Gig Harbor seeks bids for Lift Station 5 basin improvements and infrastructure upgrades.

Place of Performance

Gig Harbor, WA, 98335, USA

Set-Aside

NONE

Documents

765

Addendum #1 - Revised - Page 1.jpg

JPG

Addendum #1 - Revised - Page 2.jpg

JPG

Addendum #1 - Revised - Page 3.jpg

JPG

Addendum #1 - Revised - Page 4.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Invitation to Bidders - Page 1.jpg

JPG

Invitation to Bidders - Page 2.jpg

JPG

Plans - Page 10.jpg

JPG

Plans - Page 11.jpg

JPG

Plans - Page 12.jpg

JPG

Plans - Page 13.jpg

JPG

Plans - Page 14.jpg

JPG

Plans - Page 15.jpg

JPG

Plans - Page 16.jpg

JPG

Plans - Page 17.jpg

JPG

Plans - Page 18.jpg

JPG

Plans - Page 19.jpg

JPG

Plans - Page 1.jpg

JPG

Plans - Page 20.jpg

JPG

Plans - Page 21.jpg

JPG

Plans - Page 22.jpg

JPG

Plans - Page 23.jpg

JPG

Plans - Page 24.jpg

JPG

Plans - Page 25.jpg

JPG

Plans - Page 26.jpg

JPG

Plans - Page 27.jpg

JPG

Plans - Page 28.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 3.jpg

JPG

Plans - Page 4.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 6.jpg

JPG

Plans - Page 7.jpg

JPG

Plans - Page 8.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 113.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Gig Harbor
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Steven Demmer Project Manager

Interested Companies (17)

Spray GlassTumwater, WA
Northwest BarricadeEverett, WA
Northwest CascadePuyallup, WA

See All 17 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The installation of a new dry pit lift station, a new generator enclosure building with a new generator, new electrical and control panels, new utility lines including sanitary sewer, intake and exhaust air, conduits, and drain lines, the installation of cured-in-place pipe liners within existing gravity sanitary sewer pipes, epoxy coating existing sanitary sewer manholes, new concrete sidewalk and stairs, and site restoration. The project shall include all other Work, and shall be constructed in accordance with the applicable Drawings and Specifications, as described in the Contract Documents. Two hundred forty (240) working days are allotted for this construction with two hundred sixty (260) days for physical completion.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS