Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lift Tools and Handling Equipment

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332996
New
DIBBS
COUPLING BODY, TUBE
Solicitation # SPE7M3-26-T-8752
Solicitation SPE7M3-26-T-8752 is a total small business set-aside issued by the DLA Land and Maritime Fluid Handling Division for the procurement of 192 units of corrosion resistant steel tube coupling bodies, specifically 1/4 inch OD for aircraft applications. This critical application item, identified by NSN 4730-00-008-9866, must be manufactured using a forging process and meet all cited technical data and part-numbered requirements. The contract is designated as a commercial item procurement with a delivery period of 152 days, an original required delivery date of August 11, 2027, and a need ship date of May 14, 2025. Delivery is FOB Origin to DLA Distribution Jacksonville, Florida, with inspection and acceptance occurring at the destination. The procurement incorporates strict quality and safety standards, including the prohibition of mercury or mercury-containing compounds in the hardware and packaging. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow DLA requirement RP001. Offerors must submit quotes via the DIBBS portal and are ineligible for award if they propose additive manufacturing. The contract is subject to the Buy American Act and the Berry Amendment, and requires the use of the Wide Area WorkFlow system for invoicing. Key administrative requirements include compliance with DFARS cybersecurity standards and the submission of Safety Data Sheets for any hazardous materials.
FLUID HANDLING DIVISION

POSTED

about 24 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract is for the fabrication of specialized structural lift tools designed to ensure the safe handling of heavy components from the CH-53K helicopter during maintenance operations. These tools must meet stringent engineering and safety standards to support critical naval aviation maintenance tasks, with particular emphasis on reliability, load capacity, and operational durability under demanding conditions. The work is classified under NAICS code 332996, indicating it falls within the category of other fabricated metal product manufacturing, and is set aside entirely for small businesses under the SBA’s Total Small Business Set-Aside provisions, ensuring exclusive competition among qualified small entities. Performance of the contract will center at Lakehurst, where the tools will be tested and integrated into existing maintenance workflows. The opportunity was posted on May 1, 2026, with a rigid response deadline of May 13, 2026, at 5:00 PM local time, leaving a narrow window for qualified small businesses to submit proposals. As a subcontract under the Department of Defense, specifically managed by the Naval Air Warfare Center Aircraft Division, the project requires adherence to federal contract compliance standards, military specifications, and supply chain security protocols, despite the absence of detailed point of contact or geographic address information in the public posting.

General Info

Subcontract for small business to fabricate structural lift tools for CH-53K maintenance, DoD.

Agency

Department Of Defense → Navair Warfare Ctr Aircraft DivisionView Agency

NAICS

332996 - Fabricated Pipe and Pipe Fitting ManufacturingView NAICS

Place of Performance

Lakehurst, NJ, USA

Set-Aside

SBA

Documents

This scope was carved out of N68335-26-R-1052.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CH-53K: FY26 O-Level Peculiar Support Equipment Group G

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navair Warfare Ctr Aircraft Division
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navair Warfare Ctr Aircraft Division
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabrication of structural lift tools for safe handling of heavy CH-53K aircraft components during maintenance operations.

More opportunities from Department Of Defense → Navair Warfare Ctr Aircraft Division

Same awarding agency

NAICS: 332912
New
Federal
MQ-25 Oil Drain Attachment
Solicitation # N6833526Q1191
Solicitation N6833526Q1191 is a competitive procurement for Oil Drain Attachments (P/N: 4106AS0315-1, NSN: 4720-01-733-4712) to support the MQ-25 Stingray Unmanned Aircraft Systems Program. The effort is managed by the NAVAIR Warfare Center Aircraft Division and is structured as a single-award, three-year Indefinite Delivery/Indefinite Quantity (IDIQ) firm-fixed-price contract. The period of performance runs from August 31, 2026, to August 30, 2029. This requirement is a 100 percent total small business set-aside. The contract includes multiple CLINs across three ordering years, with a government minimum order of five units. Deliveries are generally preferred within six months of award and are shipped FOB Destination to Joint Base MDL, New Jersey. Key deliverables include the hardware and two Contract Data Requirements List items: a Certificate of Conformance and a Request for Variance. Award will be based on the Lowest Price Technically Acceptable (LPTA) offer, provided the offeror has neutral or acceptable past performance as verified via the Supplier Performance Risk System. Offerors must submit unclassified proposals through the Procurement Integrated Enterprise Environment (PIEE) by September 15, 2026. Required submission elements include a detailed technical description covering the manufacturing approach, a bill of materials, and a narrative demonstrating compliance with the Statement of Work and applicable drawings. Additionally, contractors must meet CMMC Level 2 (Self) cybersecurity requirements and adhere to strict packaging and marking standards, including MIL-STD-130 and MIL-STD-129. Invoicing and payment processing will be conducted electronically through the Wide Area WorkFlow (WAWF) system.
Fluid Power Valve and Hose Fitting Manufacturing

POSTED

2 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS