Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on March 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lightweight Machine Gun-Assault (LMG-A) Call for White Papers

Closed
H9240325R00XX21Feb25LMG-AFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332994
New
Federal
W912CH-27-R-A027 for BUTTSTOCK ASSEMBLY; NSN: 1005-01-576-8901
Solicitation # RA027
Solicitation W912CH-27-R-A027 is a request for proposal for a single five-year, firm-fixed-price requirements contract for the procurement of Buttstock Assemblies, NSN 1005-01-576-8901, Part Number 13026046. This procurement is 100% set aside for small businesses under NAICS code 332994. The government will evaluate proposals based on two factors, with the delivery schedule being significantly more important than price. Specifically, the delivery schedule for CLINs 0011 through 0015 will be rated as outstanding, good, or acceptable based on how many days sooner than the solicited schedule the contractor can begin deliveries. Proposals exceeding the required schedule by more than 45 days will be considered deficient and unawardable. The contract includes rigorous technical and security requirements, including a Technical Data Package with distribution code D and adherence to the TACOM Operations Security Plan and guidelines for Controlled Unclassified Information. Contractors must comply with MIL-STD-2073-1 and MIL-STD-129 for packaging and marking, and are required to perform First Article Approval-Contractor Testing. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system. Proposals must be submitted in English and US dollars via email to the designated contract specialist and contracting officer by November 19, 2026, at 3:30 PM EST.
W6QK Acc- Dta

POSTED

about 23 hours ago

DEADLINE

in 29 days

General Info

NAICS

332994 - Small Arms, Ordnance, and Ordnance Accessories Manufacturing

Place of Performance

Tampa, FL, 33621, USA

Set-Aside

NONE

Documents

4

Attachment 1 - LMG-A Performance Specification (Request Copy)

PDF, High priority: read this firstspecifications
High

Attachment 4: Offeror Certifications and Disclosures

PDF, High priority: read this firstcertifications-and-disclosures
High

LMG-A ISOF Range Demonstration Criteria

PDF, High priority: read this firstspecifications
High

White Paper Submission Template (12Feb25)

PDF, High priority: read this firstwhite-paper-template
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Mar 21, 2025 to Apr 4, 2025. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Hq Ussocom
Contacts2 people available
OfficeTAMPA, FL, 33621-5323, USA
Office AddressTAMPA, FL, 33621-5323, USA

Full Description

Show more
This Call for White Papers is extended from 21 March 2025 to 4 April 2025. Performers shall respond to this notice with the required documentation NLT the deadline, to be considered for the Other Transaction for Prototypoing opportunity. This notice shall not be construed as a commitment by the Government. It does not obligate the Government to reimburse any cost associated with preparation and/or submission of a response, nor does this notice guarantee the Government will issue a Request for Prototype Proposal (RFPP) or award your company a contract to provide these prototypes. Respondents are advised that the Government will not pay for any information or administrative costs incurred in response to this information or these activities. OPPORTUNITY DESCRIPTION The United States Special Operations Command (USSOCOM), Directorate of Procurement, on behalf of USSOCOM Program Management Special Operations Forces (SOF) Lethality (PMSL), is considering the award of an Other Transaction Authority (OTA) Agreement for a Prototype Project for the Lightweight Machine Gun-Assault (LMG-A) in accordance with 10 U.S.C. - 4022. This is a prototype project that aims to streamline the development and fielding of a SOF peculiar weapon system for ground forces. This OTA Project will provide a prototype that meets the requirements in accordance with (IAW) Attachment 1, LMG-A Performance Specifications (P-Spec). Respondents must request a copy of Attachment 1, LMG-A P-Spec from Mr. David Tenenbaum at david.tenenbaum1@socom.mil. OVERALL OBJECTIVES The LMG-A Prototype Project shall be a lightweight, belt fed, fully and semi-automatic system, including a primary barrel, spare barrel, buttstock, receiver, sound/signature suppressor, operator manual, cleaning kit, operator tool kit, maintainer tool kit, spare parts kit, training munition kit, bipod, backup iron sights, and a Transportation Security Administration (TSA) approved locking hard carrying case. This case will be capable of storing a fully accessorized weapon. The prototype weapon system shall be designed to accept different calibers in the future as ammunition develops. The LMG-A is a life cycle replacement to the MK48 Light Machine Gun (LMG) chambered in 7.62 NATO, with the future intent to adopt other calibers such as 6.5mm Creedmoor, but not limited to, as a multi-caliber / intermediate caliber machine gun. PHASES The USSOCOM LMG-A OTA Agreement for Prototype Project will consist of the following five phases. Advancing from one phase to the next requires the demonstration of a prototype system to be evaluated against criteria established in the awarded agreements, to determine whether the prototype project is successful. The Government will downselect at the end of each of the following five phases. Phase 1: White Paper Submission White papers shall be submitted electronically using the template in Attachment 3, along with the Offeror Certifications and Disclosures found in Attachment 4. While not mandatory, Phase 1 offers an opportunity for performers to showcase functional prototypes at the 2025 International Special Operations Forces (ISOF) Range event, held at the Nevada Test and Training Range (NTTR) on 31 March 2025. Attachment 2 - LMG-A Assessment Procedures will be used as informational guidance and expectations for situational awareness for the ISOF 2025 Vendor Shoot event. White papers must demonstrate the performer's ability, using matured technology, to produce and deliver a functional prototype meeting the LMG-A P-Spec characteristics and capabilities outlined in Attachment 1. In addition, the prototypes must be delivered within the necessary timelines to be considered for advancement to Phase 2. A Request for Prototype Proposal (RFPP) will include the P-Spec and Military User Assessment (MUA) evaluation criteria. The P-Spec may be updated between now and the RFPP; in order to take into consideration performer feedback during the ISOF 2025 range event. White Paper submissions shall be submitted electronically via e-mail to the points of contact listed below no later than the date posted on this announcement. NOTE: All proprietary information contained in the submission shall be appropriately marked. Phase 2: Prototype Proposal and Selection Following the white paper review, the RFPP will be issued to performers deemed capable of delivering viable prototypes within the required timeframe and meeting the criteria in Attachment 1 (LMG-A P-Spec). The RFPP will contain the final evaluation criteria. USSOCOM may award none, one, or multiple prototype OTA agreements. At the conclusion of Phase 2, USSOCOM will host a vendor shoot, at a location to be determined, as part of a down-select event to take the top 3-5 performers with prototype systems into Phase 3. Phase 3: Safety Testing and MUA Performers advancing to phase 3 shall provide 4-5 LMG-A weapon systems and kits (specific quantities will be identified in the RFPP) for Limited Safety Testing. USSOCOM will brief selected performers on the test plans. Performers who successfully pass Limited Safety Testing can utilize an option Contract Line Item Number (CLIN) for prototype refurbishment. This CLIN covers reconditioning prototype weapons/make minor changes (i.e. optimization) for the MUA. This option CLIN will be solicited as part of the RFPP and made part of the OT agreements in Phase 2. The MUA serves as the final down-selection event. USSOCOM will down-select the top two performers from the MUA who meet all success criteria IAW Attachment 1 (LMG-A P-Spec) and the MUA Evaluation Criteria (to be included in the Phase 2 RFPP). These performers will advance to Phase 4 for qualification and fielding. NOTE: A Request for Proposal (RFP) for the follow-on production contract may be issued after Limited Safety Testing but prior to the MUA during Phase 3. This RFP may be Federal Acquisition Regulation (FAR) or non-FAR based. A successful prototype project designation does not guarantee a follow-on production contract. Evaluation factors for the production contract will be included in the RFP. Phase 4: Developmental & Operational Testing USSOCOM will procure up to 20 additional prototypes from the selected performers for Developmental Testing (DT) and Operational Testing (OT). USSOCM will brief the selected performers on the Testing Plans. Following successful completion of DT, USSOCOM may procure 1-10 additional prototypes for OT and weapon system qualification for fielding. The additional prototypes required for DT and OT will be solicited as part of the RFPP and awarded as option CLINs in the OTA agreements at Phase 2. Phase 5: Production Contract Award Upon successful completion of DT and OT in Phase 4, the Government may award a follow-on production contract to a single vendor. The contract may be structured as FAR or non-FAR based. In accordance with 10 U.S.C. - 4022(f), the OTA Agreement will include a provision for a potential follow-on production and sustainment contract, awarded without additional competition, to the selected vendor. Basic eligibility to receive a follow-on production contract will require the successful completion of the prototype project, as well as DT and OT. The follow-on production contract is expected to be either a FAR-based contract or a similarly structured OTA agreement under the authority of 10 U.S.C. - 4022(f). The Government contemplates a 10-year ordering period and a contract ceiling of $53,000,000.00 for the follow-on production contract (subject to change). The Government contemplates purchasing up to 2,533 LMG-A weapon system kits, spare parts/accessories, new equipment training, and associated sustainment support over the life of the LMG-A weapon system under the follow-on production contract.

More opportunities from Department Of Defense → Hq Ussocom

Same awarding agency

NAICS: 621340
New
Federal
RFP Preservation of the Force and Family POTFF III Support Contract H9240027RE001
Solicitation # H9240027RE001
The United States Special Operations Command (USSOCOM) is soliciting proposals for the Preservation of the Force and Family (POTFF) III Support Contract under solicitation H9240027RE001. This single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract focuses on optimizing Special Operations Forces operators and their family support systems to enhance readiness and lethality. The scope of work includes human performance labor, surge support, and a three-month initial phase-in period. The contract is structured with a five-year period of performance for primary labor and other services, with a potential six-month extension. Performance is governed by a Statement of Work and a Quality Assurance Surveillance Plan, with deliverables such as Monthly Status Reports and a Phase-Out transition plan required 18 months prior to completion. The government will award the contract based on best overall value, utilizing a tradeoff analysis where technical and past performance factors are significantly more important than price. Technical evaluation focuses on enterprise management, workforce operations, transition, and program management tools. Offerors must possess an active Top Secret Facility Clearance and maintain a minimum self-assessed Supplier Performance Risk System (SPRS) score of 110, with verification of CMMC Level 2 (Self) status. Proposals must be submitted electronically via the PIEE Solicitation Module by November 13, 2026, at 1700 Eastern Standard Time. Submissions must be organized into Technical, Past Performance, Price, and Administrative volumes, adhering to strict page limits for price narratives and personnel resumes.
Offices of Physical, Occupational and Speech Therapists, and Audiologists

POSTED

7 days ago

DEADLINE

in 23 days
View Details
NAICS: 541330
Federal
PMCP-SS_RFP
Solicitation # H9240226RE005
Solicitation H9240226RE005 is a Small Business Set Aside request for proposal issued by HQ USSOCOM to secure program and product management support for the Program Manager Counterproliferation (PMCP) Service Support contract. The scope of work includes technical and engineering support, development, training, and acquisition services for missions involving Counterproliferation, Counter RCIED, Explosive Ordinance Disposal, Multi-Mission Electron Countermeasures, Electromagnetic Warfare, and Counter Unmanned Systems. The contract is structured as an IDIQ with a period of performance from June 21, 2027, to June 20, 2032, utilizing a mix of Firm Fixed Price for CONUS labor and Cost Plus Fixed Fee for OCONUS labor, event support, and other direct costs. The government will employ a best-value performance-price tradeoff process for award. Technical Approach is a pass/fail threshold factor; only proposals rated Acceptable will proceed to a tradeoff between Past Performance and Price. To access restricted solicitation documents, interested vendors must submit a signed Non-Disclosure Agreement and verify a CMMC 2.0 Level 2 self-assessment score of 110 in the Supplier Performance Risk System. Proposals are due by November 6, 2026, and must be submitted electronically via the PIEE Solicitation Module. Performance will be monitored through a Quality Assurance Surveillance Plan focusing on workforce management, mission support, reporting, and government-furnished property management.
Engineering Services

POSTED

13 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS