Lime Slaking System Equipment Supply
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Lime Slaking System Equipment Supply involves providing specialized mechanical equipment for water treatment plant projects managed by Hollywood Public Utilities in Florida. The scope of work requires the manufacture and delivery of lime slakers, slurry tanks, and associated pumps, all of which must be constructed using Type 316 stainless steel. In addition to the physical hardware, the supplier is responsible for delivering critical technical documentation, including dimensional drawings, shop drawings, and technical data sheets. The contractor must also provide factory test reports and anchor bolt calculations specifically designed to withstand seismic and wind loads. The response deadline for this opportunity is December 3, 2026.
General Info
Place of Performance
FL, USASet-Aside
Documents
This scope was carved out of IFB-440-26-JM.
The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.
Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Florida → Public Utilities
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
