Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on March 16, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LIMITED SCOPE & TENANT BACKFILL PROJECT GSA Design Excellence Solicitation for Lead Design Architect and Engineer

Closed
47PJ0020R0066Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 12 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$52,706,693.7

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Lakewood, CO, 80225, USA

Set-Aside

SBA

Award Issued Date

Documents

12

47PJ0020R0066+Amendment+001+RFI+001.pdf

PDF

47PJ0020R0066+Amendment+002+RFI+002.pdf

PDF

47PJ0020R0066+Amendment+003+RFI+003.pdf

PDF

47PJ0020R0066+Amendment+004.pdf

PDF

47PJ0020R0066+PPQ+Attachment+6.docx

DOCX

47PJ0020R0066+Solicitation+001.pdf

PDF

47PJ0020R0066+Solicitation+002.pdf

PDF

47PJ0020R0066+Solicitation.pdf

PDF

47PJ0020R0066+SOW+Attachment+4.pdf

PDF

Attachment+3+Sample+Agreement.pdf

PDF

Building+48+Program+Development+Study+Attachment+5.pdf

PDF

Building+48+SF330.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R8 Acquisition Management Division
Contacts2 people available
OfficeLAKEWOOD, CO, 80225, USA
Office AddressLAKEWOOD, CO, 80225, USA
Contacts
John A KelleyContracting Officer
Len WilsonContract Specialist

Full Description

Show more
This is a Request for Qualifications (RFQ) for a Design and Construction opportunity in Design and Construction Excellence for a Design Build (DB) contract for the existing Building 48 on the Denver Federal Center. This acquisition encompasses the design and construction needed to convert an existing vacant warehouse building into the offices and related space as required by GSA and the relocation of federal employess from leased space into Building 48. The design build scope of work includes all labor, materials, design, engineering, construction, commissioning, and other related services necessary to support the modernization of Building 48 and conversion to modern office space. The Small Business Size Standard is $39.5M. The total space of the building consists of approximately 154,000 gross square feet, all of which is currently vacant. The estimated total design/buildcost is between $35,000,000 and $50,000,000. The scope of the modernization project will consist of the installation or replacement of all major systems, such as mechanical, electrical, plumbing, and communications, as well as structural enhancements and roofing replacement as identified in the program development study. The project will maximize opportunities for natural daylight into the resulting space, utilizing existing and introducing new building penetrations. The tenant finish will support an open office layout, incorporating elements of the existing warehouse into the architectural design. The main entry of the building will be relocated and modernized. Additionally, exterior to the building is roughly 200,000 square feet of ware yard, including four small satellite buildings which as a part of this acquisition will be cleared and replaced with a new parking lot. Outdoor spaces will be designed and constructed at the building exterior to enhance the landscape architecture and for use by the tenant agency. GSA intends to award a firm fixed price design build contract pursuant to the Federal Acquisition Regulation (FAR) two phase design build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively. The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the - shortlisted Offerors to submit Phase 2 proposals. Maximum Number of - Short Listed Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 - shortlist on beta.SAM.gov. Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15. In accordance with FAR Part 15.101-1(b)(2), the non-price/technical evaluation factors, when combined, are significantly more important than cost or price. At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services pursuant to Federal Acquisition Regulation (FAR) Best Value Design-Build Selection Procedures (FAR Subpart 15.3). GSA envisions a highly collaborative design build delivery approach for this project where the Design Build contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient building. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards. During the development period from initial concept to final design the DB team will work in close consultation with GSA, the stakeholders and the Construction Management Advisor (CMa) to ensure that all of the goals are addressed and that best value practices are utilized. This procurement will set aside to small business firms certified in beta.SAM.gov.

More opportunities from General Services Administration → Pbs R8 Acquisition Management Division

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS