Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lincoln Avenue Traffic Safety & Paving Phase 1 - California Boulevard to Soscol Avenue

Closed
33ST23PW03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes for asphalt repairs associated with the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. The scope of work includes asphalt pavement replacement and restoration, milling and removal, surface and binder course placement, pavement patching, trench restoration, and asphalt hauling, placement, and compaction. Interested contractors must provide itemized pricing, equipment and workforce availability, and relevant experience with municipal sewer, utility, and roadway restoration projects. Project plans and specifications are available upon request, and a quick payment agreement will be included. This opportunity is a set-aside for SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated Small Disadvantaged businesses. Proposals are due by November 27, 2026, and should be submitted to Shane Phillips at [email hidden]. Any subcontract award is contingent upon D.R. Phillips, LLC securing the prime contract for the project and the successful negotiation of a separate subcontract agreement.
D.R. Phillips, LLC

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 16 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 18 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract involves comprehensive safety and roadway improvements on Lincoln Avenue in Napa, California, focusing on reducing traffic lanes from four to three to enhance safety for vehicles, cyclists, and pedestrians. This reconfiguration includes one travel lane in each direction with a shared center turn lane, widened and buffered bike lanes to reduce vehicle-bicycle conflicts, and reconstructed curb ramps at intersections to improve pedestrian crossings by guiding foot traffic straight across side streets rather than diagonally. These improvements stem from the City's identification of Lincoln Avenue as part of a high injury network, emphasizing the project’s goal to reduce accidents and improve overall traffic safety. Administered by Napa’s Public Works Department, the contract is a public solicitation with a deadline for response set in March 2026. It requires responsible contractors to comply with all relevant California labor laws, including prevailing wage and DIR registration, and federal nondiscrimination statutes to ensure equitable treatment and access. The contractual framework includes performance, payment, and warranty bonds to protect the City's interests throughout construction and warranty periods, securing faithful project completion, payment to labor and suppliers, and assurance against workmanship defects for one year post-acceptance. The bid process involves detailed evaluation of contractor qualifications, safety records, and pricing, supported by established contract documents that govern project execution, timelines, liquidated damages, and nondiscrimination compliance. The project underscores the City's commitment to infrastructure safety improvements aligned with local and federal regulatory standards.

General Info

Lincoln Avenue safety improvements: reduce lanes, add bike lanes, upgrade crossings; comply with labor laws.

Documents

12
PDF, High priority: read this first3 pages · bidder-questionnaire
High
DOCX, High priority: read this first6 pages · contract-document
High
XLSX, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first2 pages · payment-bond
High
PDF, High priority: read this first2 pages · performance-bond
High
PDF, High priority: read this firstspecial-provisions
High
PDF, High priority: read this firsttechnical-specifications
High
PDF, Low priorityother
Low
PDF, Low priorityother
Low
PDF, Low priorityother
Low
PDF, Low priority2 pages · warranty-bond
Low

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Building 1916-T2 Stormwater Drainage Repair and Parking Lot Asphalt Re-sealing ProjectOpen now
  • 2027-TR-0018 - Asphalt replacement of DEA campusOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department
Contacts1 person available
OfficeNapa, CA, 94558, USA

Interested Companies (2)

BKF EngineersOakland, CA
Cyber IT SolutionsSacramento, CA

Full Description

Show more
Safety improvements are a priority goal of the project. Lincoln Avenue is cited in the City of Napa's Local Roadway Safety Plan as part of the high injury network. As a result, the City's Traffic Engineering Division determined that Lincoln Avenue should be reduced from four lanes (two travel lanes in each direction) to three lanes (one travel lane in each direction with a shared double direction turn lane in the center). The new configuration will improve safety for vehicles, bikes and pedestrians by reducing the number of lanes that need to be transversed when crossing the roadway or crossed when vehicles make a left turn. Bike lanes will be widened and separated from the vehicular travel lanes with buffers where feasible to reduce conflict between vehicles and bikes and to provide greater comfort for cyclists. Curb ramps will be reconstructed at nearly all of the intersections to direct pedestrians straight across the side streets feeding Lincoln Ave, rather than directing them diagonally into the intersection as they do currently.

More opportunities from California → Public Works Department

Same awarding agency

NAICS: 562920
New
SLED
MATERIAL RECOVERY PROCESSING FOR RESIDENTIAL & COMMERCIAL RECYCLING
Solicitation # 2026-RFP-0538
The City of Pasadena Public Works Department is soliciting proposals for material recovery processing of residential and commercial recycling. The selected contractor must operate a processing facility located within 30 road miles of the City of Pasadena City Yards, with the capacity to process an average of 50 tons of recyclable materials per day and maintain a minimum recycling efficiency of 75%. The contract term is five years from the date of execution, with no optional extension periods. Key deliverables include monthly tonnage reports, specialized reporting for city events, and a written contingency plan submitted within 30 days of the award. All operations must comply with federal, state, and local laws, including Cal-OSHA standards. Proposals must be submitted electronically via the City's eProcurement Portal by December 14, 2026, at 3:00 PM PT. Submissions must be divided into a Technical Proposal and a separate Price Proposal, with a combined page limit of 50 pages for the technical and qualification documents. Evaluation is based on total average points across scoring factors, utilizing a ratio method for cost and providing a 5-point preference for California-certified small or micro-businesses. Required documentation includes a Unique Entity Identifier (UEI) from SAM.gov, a Declaration of Non-Collusion, conflict of interest disclosures, and a Taxpayer Protection Amendment form. Invoicing is managed through the City's Vendor Invoice Portal, with checks issued on Tuesdays and Thursdays.
Materials Recovery Facilities

POSTED

3 days ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
Trower Avenue Paving (Linda Vista Avenue to Solano Avenue)
Solicitation # 2026-IFB - PC-057
The City of Napa is soliciting bids for the Trower Avenue Paving project (Project No. 33ST27PW03), located between Linda Vista Avenue and Solano Avenue. The scope of work includes grinding, paving, minor concrete work, tree removal, striping, and signage, with an estimated construction cost of $1,181,000. The project requires a contractor with a Class A license and involves the removal of pavement markers, adjustment of utility frames and boxes to grade, and the implementation of traffic control to maintain one lane in each direction. The contract will be awarded to the lowest responsible bidder, with the City potentially applying a local bidder preference per Napa Municipal Code Chapter 2.93. The project is expected to begin around April 5, 2027, with a completion timeline of 45 to 60 working days. Key requirements include the submission of a Quality Control Plan for HMA production and a tie-out plan for facility adjustments. The contractor must provide performance, payment, and warranty bonds, and comply with California Labor Code prevailing wage and DIR registration requirements. Liquidated damages for delays are set at $5,200 per day. Bids must be submitted electronically via OpenGov by December 10, 2026, and must include a bid security equal to ten percent of the maximum bid amount. There is no specific set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 19 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS