Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Little Miami Wastewater Treatment Plant High-Rate Treatment (LMWWTP HRT) Facility Progressive Design-Build Project

Closed
RFQ 275X901192State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure deliverables include a new wet well, valve vault, and associated appurtenances, as well as the installation of pumps, a generator, and odor control equipment. The project also requires the demolition of existing pumps and piping, the installation of new gravity sewers and manholes, and the execution of by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the submission of required MWBE documentation, including a Good Faith Efforts Form and Table A. Bidders must provide performance and payment bonds, as well as proof of insurance from companies with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, and payments are processed monthly via applications for payment submitted to the Engineer, becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and AMCA 500-L for louvers.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The City of Cincinnati, for the Metropolitan Sewer District of Greater Cincinnati, is seeking a Design-Builder for the Little Miami Wastewater Treatment Plant High-Rate Treatment (LMWWTP HRT) Facility project. This Progressive Design-Build effort aims to increase peak wet-weather treatment capacity by 115 mgd to reach a total of 215 mgd. The scope of work includes the construction of a new HRT facility using cloth media filtration as the baseline solution, upgrades to the Four Mile and Little Miami Pump Stations, the installation of a new flow-splitting headbox, upgraded disinfection facilities, and a new maintenance facility. The project also requires the demolition of existing incineration, dewatering, and maintenance facilities to accommodate the new infrastructure. The procurement is a two-phase best-value process starting with a Request for Qualifications to shortlist firms, followed by a Request for Proposals. Phase 1 focuses on analysis and 100 percent design, leading to the preparation of a Guaranteed Maximum Price (GMP). Phase 2 covers construction, startup, commissioning, and formal Acceptance Testing. The total project estimate is approximately 300 million dollars, and respondents must demonstrate a bonding capacity of at least 400 million dollars. The contract award is planned for June 2027, with final project completion expected no later than 2035. Additionally, the project mandates a 5.4 percent Disadvantaged Business Enterprise (DBE) participation goal.

General Info

Cincinnati seeks a Design-Builder for a 300 million dollar wastewater treatment plant expansion.

Documents

8
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
DOCX, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 27, 2026 to Nov 10, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → City Of Cincinnati
Contacts1 person available
OfficeOH, USA
Organization / AgencyOhio → City Of Cincinnati
Office AddressOH, USA
Contacts
Joshua Tucker

Full Description

Show more
This procurement is to select Design-Builder to complete the Little Miami WWTP HRT Facility. This includes a new proposed HRT facility, disinfection facilities, and pump station upgrades. This procurement will be a two-phase process, with a RFQ followed by an RFP for firms that were shortlisted by the selection committee. The selected Design-Builder will provide all analysis to prepare a design (Phase 1) for the proposed Little Miam HRT, Disinfection, and pump station upgrades. After Design (Phase 1) is completed, they will perform bidding services to prepare a Guaranteed Maximum Price (GMP). They will then manage the construction (Phase 2) and potentially self-perform individual pieces of the work.

More opportunities from Ohio → City Of Cincinnati

Same awarding agency

NAICS: 541310
SLED
BuildReady
Solicitation # RFP275X901201
The City of Cincinnati, through the Office of Strategic Growth, is soliciting proposals under RFP275X901201 for the BuildReady initiative. The project requires a licensed Ohio architect to design six complete, construction-level, permit-ready plan sets for middle housing, specifically consisting of two duplexes, two triplexes, and two fourplexes. These designs must be pre-approved by the Department of Buildings and Inspections to expedite development within Connected Communities corridors. The scope of work includes visiting construction sites, writing professional reports, collaborating with city staff and developers, and reviewing bid and site plans. All designs must adhere to current Ohio building standards, zoning laws, Universal Design principles, and HUD Minimum Property Standards and Housing Quality Standards. Proposals will be evaluated based on cost and budget, innovativeness and creativity, the contractor's understanding of the seven project objectives, and any qualifying entries into the BuildReady Design Competition. Required submissions include a detailed cost breakdown, a comprehensive delivery schedule, and specific corporate and accuracy affidavits. The project is funded via federal grant programs subject to HUD Title IV-A Program approval. Awarded contractors must be taxpayers in good standing with the City of Cincinnati and comply with Municipal Code Chapter 325 regarding Equal Employment Opportunity. All submissions must be uploaded via the designated Bonfire hub portal by the specified deadline, as hard copy or email submissions are not accepted.
Architectural Services

POSTED

27 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS