Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Live Tooling Upgrade Supply (6000 RPM)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA4861 99 Cons LgcView Agency

NAICS

332721 - Precision Turned Product ManufacturingView NAICS

Place of Performance

Nellis AFB, NV, 89191, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4861 99 Cons Lgc
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA4861 99 Cons Lgc
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of a 6000 RPM live tooling upgrade to enable milling and drilling during turning operations on the HAAS CNC lathe.

Similar Contracts

Same NAICS industry code

NAICS: 332721
New
DIBBS
HARDWARE KIT, MECHANICThe contract is for the procurement of a Hardware Kit, Mechanic Equipment under solicitation SPE7L1-26-T-869Q, a Service-Disabled Veteran-Owned Small Business Set-Aside, with a required delivery of 5,828 units within 116 days of award. The item is identified by NSN 5340-01-313-9961 and is supplied by two approved vendors: General Dynamics Land Systems Force 1EFH8 and Indian Head Industries Inc. The contract incorporates technical and quality requirements referenced from the DLA Master List, and compliance with DLA packaging standards MIL-STD-2073-1E and marking requirements MIL-STD-129 is mandatory, with no special marking required. Item Unique Identification is not required per the service customer’s request, and the material has no shelf life limitation. Sampling must follow MIL-STD-1916 or ASQ H1331 with zero non-conformances accepted unless otherwise specified, with attributes assigned verification levels or AQLs as defined. Delivery is FOB origin to the DLA Distribution facility in New Cumberland, PA, with inspection and acceptance occurring at destination. The required ship date is July 15, 2026, and the original delivery date is April 12, 2027. The contract specifies a zero variance in quantity and includes transportation guidelines as per DLAD procedural notes. The solicitation was posted on July 23, 2026, with responses due by August 3, 2026, and is managed by the Department of Defense’s Land Supply Chain under NAICS code 332721.
LAND SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 332721
New
DIBBS
BOLT, MACHINEThe contract pertains to the procurement of machine bolts designated by NSN 5306002264834, with a total quantity of 1,349 units divided into two line items: 102 units under CLIN 0001 and 1,247 units under CLIN 0002. Delivery is required within 122 days of the contract award, with goods to be shipped FOB origin and no tolerance allowed for quantity variance. Inspection and acceptance occur at the destination point, and packaging must fully comply with MIL-STD-2073-1E, including specific preservation methods, unit and intermediate container specifications, and packing code U. Marking must adhere to MIL-STD-129, with no special marking required, and palletization must follow DLA’s RP001 packaging requirements. The use of mercury or mercury compounds in any aspect of preservation, packaging, or labeling is strictly prohibited. Two distinct delivery addresses are specified: one in Barstow, California for the first line item and another in New Cumberland, Pennsylvania for the second, each with corresponding parcel post and freight shipping instructions. The need ship dates differ between the two line items, with the earliest shipment required by July 23, 2026, and the original delivery deadline set for March 20, 2027. Transportation logistics are governed by DLA procedural notes C19 and C20. The solicitation number is SPE7M2-26-T-5720, issued under NAICS code 332721 by the Department of Defense’s Nuclear Reactor Program, and the contract was posted on July 23, 2026, with a response deadline of August 3, 2026.
NUCLEAR REACTOR PROGRAM

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 332721
New
DIBBS
BOLT, MACHINEThe solicitation SPE4A6-26-T-09GW is a total small business set-aside for the procurement of 1,122 machine bolts, with a delivery requirement of 121 days after award. Offerors must comply with strict domestic sourcing regulations including the Berry Amendment, Buy American Act, and related DFARS clauses, especially since the Berry Amendment threshold has been lowered to $150,000. Non-domestic materials require explicit disclosure in the quote or through written notification. Offerors are prohibited from supplying items produced via additive manufacturing unless prior approval is granted, and such proposals will be deemed noncompliant and ineligible for award. Fast Pay is not applicable, and vendors are strongly advised to submit quantity ranges instead of fixed quantities to accommodate fluctuating demand and reduce administrative burden during award decisions. All offerors must affirm they will not provide covered telecommunications equipment or services as defined under FAR 52.204-24 and DFARS 252.204-7016. Small business joint ventures must submit required representations for their status under specific programs including small business, service-disabled veteran-owned, WOSB, EDWOSB, or HUBZone. Access to the Vendor Shipment Module (VSM) will require registration through the new Account Management & Provisioning System (AMPS), which is not yet available but will be mandated within two months; contractors using VSM WebServices must update their internal schema by the April 23, 2025 deadline to maintain shipping capability. Offers must be submitted through DIBBS, and those unable to respond by the closing date must file a “No Bid” quote with an anticipated date or reason to avoid assumptions of non-responsiveness. The point of contact for inquiries is Marchello Fields, and additional guidance is available through APEX Accelerators at no cost to help businesses navigate government contracting requirements.
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Defense → FA4861 99 Cons Lgc

Same awarding agency

NAICS: 332312
New
Federal
EOU Sunshades Creech AFBThe Contract F4FANG6133A001 for the Experimental Operations Unit at Creech AFB requires the design, supply, and construction of four new shade structures with four aircraft parking bays each, to be installed on the south ramp west of existing structures on the airfield’s parking apron in Indian Springs, Nevada. Concurrently, four existing sunshades must be relocated and reoriented to align with the new structures, and a fifth sunshade must be demolished. Each new structure must incorporate LED lighting with a 12-hour battery backup powered by a photovoltaic array, along with conduit, copper wiring, service power outlets, a service panel, Una-strut support assembly, and a solar-powered obstruction light. All designs must adhere to specified aesthetic standards including tapered I-beam girders and Frazee Paint #213 Travatan finish, and comply with structural codes including UFC 3-301-01, IBC 2018, ASCE 7-16, and AISC standards to withstand 110 MPH sustained winds. The contractor must deliver progressive design drawings, redline construction documents, and stamped as-built AutoCAD and PDF record drawings, along with a comprehensive Operations and Maintenance Manual detailing materials, fasteners, and torque specs, and submit required FAA Form 7460-1 notifications. The project is subject to a 210-day performance period from notice to proceed, with 90 days allocated for design and 120 days for construction. The solicitation is a Firm Fixed Price (FFP) contract under a Total Small Business Set-Aside (NAICS 332312, size standard: 500 employees), requiring offerors to self-certify as a small business and provide their Unique Entity Identifier and CAGE code. Proposals must be submitted electronically via email to the designated point of contact by the deadline of August 7, 2026, at 5:00 PM PDT, with no submissions accepted through SAM.gov. Evaluation will be conducted on a Lowest-Priced, Technically Acceptable (LPTA) basis, requiring only a pass-fail technical assessment and full, accurate line-item pricing with no trade-offs between cost and non-cost factors. All work must occur at Creech AFB under strict security protocols, including mandatory security clearances for personnel, no weapons on base, no photography on the flight line, and FOD mitigation
Fabricated Structural Metal Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details
NAICS: 238220
New
Federal
26 WPS - WT15754265 - Mini Split UpgradeThe contract requires the contractor to construct and install two maintenance pads for condensing units using solid and vented concrete masonry units to ensure proper airflow, with screen block walls two rows higher than the units and matching the existing CMU color and style. Each pad must include a weatherproof 120V maintenance receptacle, and the contractor must core drill Building 119’s wall to install a 3-inch PVC pipe sealed with acoustical seal to meet ICD 705 compliance. All line sets entering the building require insulation, and electrical power must be sourced from Room 119’s EDH 1 3 panel rated at 480/277V and 800 amps, with all new HVAC systems tied to the existing generator for backup. Surface-mounted conduits are to be installed in Room 119 and the exterior HVAC yard, with underground conduits running to each maintenance pad and weatherproof disconnects provided for every condensing unit. New cassette-type HVAC systems must be installed in Rooms 112, 113, 114, and 132 using the existing ceiling grid with added support, including a 1-ton system with a separate controller for Room 112, 2-ton systems for Rooms 113 and 114, and a 4-ton system for Room 132, each with individual control units. All work must comply with the International Building Code, UFC standards, DOD directives, Nellis ID2, Clark County regulations, and federal codes, with the most stringent requirement applying unless otherwise directed. All design and construction must be completed within 160 days, and proposals will be evaluated based on lowest price, technically acceptable. A mandatory site visit is scheduled for August 4, 2026, at 0830 PDT at Building 119’s main entrance, and base access must be secured by submitting a base pass request no later than July 24, 2026, at 2:00 PM PDT. Proposals are due by August 18, 2026, at 2:00 PM PDT, with questions to be answered via solicitation amendment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 25 days
View Details