Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on June 3, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Long Lead Parts for GPS Block IIIA Space Vehicles (SV) 5 and SV 6

Closed
11-49Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336414
New
Federal
Commercial Low Earth Orbit (LEO) Destination Contract (CLDC) Request for Proposal
Solicitation # 80JSC027R0004
The National Aeronautics and Space Administration Johnson Space Center is soliciting proposals under solicitation 80JSC027R0004 for the Commercial Low Earth Orbit Destination Contract. This effort seeks a Multi-Award Indefinite Delivery/Indefinite Quantity contract, utilizing a Firm-Fixed-Price structure, for the design, development, manufacture, launch, and operation of a Commercial LEO Destination System to succeed the International Space Station. The system comprises three primary components: the Crew Transportation System, the Commercial LEO Destination, and the Cargo Transportation System. Performance is measured across three capability categories ranging from one-month crew tended missions to six-month standard service missions. The contract includes a base ordering period from April 2027 through April 2035, with two subsequent option periods extending the potential performance through April 2042. Proposals are due by December 8, 2026, at 1:00 p.m. Central Time, with Volume III regarding past performance requested early on November 24, 2026. Award decisions will be based on best value, evaluating Mission Suitability, Price, and Past Performance, with Mission Suitability being the most significant technical factor. The scope of work involves rigorous certification and safety standards, including compliance with AS9100 and specific human space flight requirements. Key contractual obligations include the submission of an Organizational Conflicts of Interest plan, adherence to the Outer Space Treaty, and the procurement of specific property damage insurance for certain launch vehicle categories. All submissions must be delivered electronically via NASA's EFISS Box in Microsoft Office formats.
NASA Johnson Space Center

POSTED

5 days ago

DEADLINE

in about 2 months

General Info

NAICS

336414 - Guided Missile and Space Vehicle Manufacturing

Place of Performance

Lockheed Martin Corporation, Space Systems Company 100 Campus Drive, NEWTOWN, PA, 18940-1784, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8823 Sustainment Mcpnt Ssc/pkl
Contacts2 people available
OfficePETERSON AFB, CO, 80914-2900, USA
Office AddressPETERSON AFB, CO, 80914-2900, USA
Contacts

Full Description

Show more
The U.S. Air Force, Space and Missile Systems Center (SMC), Global Positioning (GP) Systems Directorate intends to modify the Global Positioning Satellite (GPS) III contract, FA8807-08-C-0010, to reinstate Option CLIN 0012 Long Lead Items (SV5 & SV6). These parts include, but are not limited to, attitude control system assemblies, UHF receive cylinders, pyro cartridges, relays, battery cells, solar array yokes/booms, circuit card assemblies, transistors, transformers, plexers, crystal oscillators, atomic frequency standards, feed support panel, UHF beamforming network, cable cutters, diodes, solar array cells, propulsion tanks, inductors, single board computers, amplifiers, oscillators, antenna elements, hinges, solar array drive assemblies, capacitors, solar array substrates, transducers, on-board computer, integrated circuits, hybrids, filters and field programmable gate arrays. These parts must satisfy all requirements in the existing GPS III contract, including all compliance documents (e.g., Technical Operating Reports 4430/4432) and source control drawings (developed as part of the contract referenced above). In addition, once those parts are incorporated into SV5 & SV6, the contract's on-orbit performance incentive plan will apply to those parts (i.e., if those parts fail such that the SV must be declared non-operational, the Government will be entitled to repayment consistent with the terms and conditions of that plan). These Long Lead parts shall be delivered to the Directorate not later than 8 May 2016 (SV5) and 6 Aug 2016 (SV6). The GP Directorate intends to award this option as a sole-source contract modification to Lockheed Martin Space Systems Company, 100 Campus Drive, Newtown, PA 18940, as the only source that can satisfy the Government's requirements without the Government incurring a substantial duplication of cost that is not expected to be recovered through competition and/or unacceptable delays in fulfilling the Air Force's requirements (10 U.S.C. - 2304(c)(1)). While this notice of intent is for informational purposes only, and is not a request for competitive proposals, interested parties may identify their interest and technical capability and submit information that shall be considered by the Government. The North American Industry Classification System (NAICS) code for this action is 336414. The small business size standard is 1,000. Statement of Capabilities All responsible sources capable of meeting the Government's requirements detailed in this notice must submit a Statement of Capabilities and Qualifications Statement to the technical and contracting POCs listed below by 1700 PST on 18 June 2011. Responses are limited to five (5) 8.5" x 11" pages with 1" margins and 12 point font (Arial or Times New Roman) with numbered pages. The capability and qualifications statement will be evaluated solely for the purpose of determining the offeror's ability to meet the Government's needs described above. Consequently, the Government is primarily interested in responsible sources providing specific technical details indicating how that source can meet the Government's needs. Oral communications are not acceptable in response to this notice. Responses from small business and small, disadvantaged business firms are encouraged. Firms responding should indicate if they are a small business, a socially and economically disadvantaged business, 8(a) firm, historically black colleges or universities, or a minority institution. A determination not to compete this proposed effort on a full and open competition basis based upon responses to this notice is solely within the discretion of the Government. Submit Statement of Capabilities electronically to technical POC: brian.knight@losangeles.af.mil, and contracting POCs: kimberlene.butler@losangeles.af.mil and elizabeth.chirdon@losangeles.af.mil, or Statements of Capabilities may be mailed to SMC/GPK, Attn: Kimberlene Butler and Beth Chirdon, 483 N. Aviation Blvd., El Segundo, CA 90245-2808. An ombudsman has been appointed to hear concerns from potential offerors. The purpose of the ombudsman is to receive and communicate concerns from potential offerors when an offeror prefers not to use established channels to communicate its concern during the proposal development phase of this acquisition. The ombudsman will communicate certain offeror issues, disagreements, and recommendations on this acquisition to the proper channels. The ombudsman's role is not to diminish the authority of the program director or the contracting officer, but to advocate an offeror's concern on a non-attribution basis. The ombudsman will maintain strict confidentiality as to the source of the concern when requested by the offeror. The ombudsman is Mr. James Gill (310) 653-1789. Questions pertaining to this announcement shall be directed to the Contracting Officer, Beth Chirdon, SMC/PK at (310) 653-3397 or by email at elizabeth.chirdon@losangeles.af.mil.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS