Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Long-Lead Procurement Management

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract titled Long-Lead Procurement Management is a subcontract issued by the Department of Defense through W2SD Endist Europe, focusing on the strategic planning and execution of procurement for materials and equipment with extended lead times. It requires comprehensive management of international logistics and full compliance with regulatory and operational standards, ensuring timely delivery of mission-critical assets. The procurement effort is centered on Wiesbaden as the primary place of performance, reflecting its operational relevance within Europe. The solicitation was posted on July 2, 2026, with a response deadline of July 9, 2026, indicating a tight timeline for potential contractors to submit proposals. The North American Industry Classification System code 423330 applies, specifying wholesale trade in machinery, equipment, and supplies. The contract does not specify a set-aside type or organization type, and while the office address details are incomplete, the emphasis remains on global supply chain coordination. Contractors must be equipped to navigate cross-border regulations, manage complex logistics networks, and align with Department of Defense requirements for secure and reliable material flow.

General Info

Long-lead procurement management for DoD in Wiesbaden with global logistics and strict regulatory compliance.

Agency

Department Of Defense → W2SD Endist EuropeView Agency

NAICS

423330 - Roofing, Siding, and Insulation Material Merchant WholesalersView NAICS

Place of Performance

Wiesbaden, DE-HE, DEU

Set-Aside

NONE

Documents

This scope was carved out of W912GB27Z1C2F.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Market Survey – Industry Capabilities and Experience with Alternate Design and Delivery Methodologies (ADDM) for USACE Europe District

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Europe
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W2SD Endist Europe
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Strategic planning and execution of procurement for materials and equipment requiring extended lead times, including international logistics and compliance.

More opportunities from Department Of Defense → W2SD Endist Europe

Same awarding agency

NAICS: 237110
New
Federal
Water Supply Storage System Bazum Village, Armenia (Design-Build Construction)
Solicitation # W912GB26RA030
Solicitation W912GB26RA030 is a full and open competition for a firm-fixed-price, design-build construction contract to establish a sustainable water supply and storage system for the Bazum community in northern Armenia. The project scope encompasses site preparation, the construction of water tanks, a chlorination system, and associated buildings. A critical component of the project is a hydraulic study of the watershed, which will determine whether the water source will be obtained via a river intake with a stilling basin (Option 1) or a groundwater well estimated at 150 meters deep (Option 2). The estimated magnitude of the project is between $350,000 and $800,000 USD, with a performance period of 600 calendar days starting October 14, 2026. The government will award the contract to the responsible offeror with the highest technical rating, provided the price is determined to be fair and reasonable. Evaluation factors include host nation operations, work breakdown and self-performance plans, VAT management, and schedule realism, alongside a confidence rating for past performance. Proposals must be submitted electronically via the PIEE Solicitation module by September 17, 2026, at 1000 hours UTC+2. Required documentation includes SAM registration, a bank letter of assurance for 10% of the proposed price, and detailed technical and price volumes. All work must comply with host nation standards, European Norms, or the International Building Code where local codes are unavailable.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
Federal
PRE-SOLICITATION NOTICE_Water Supply System Bazum, Armenia
Solicitation # PANNAD26P0000028505
A pre-solicitation notice has been issued for the design and construction of a sustainable water supply and storage system in Bazum Village, Armenia, under the NAICS code 236220. The project is being managed by the Department of Defense through W2SD Endist Europe, with the primary point of contact being Kelsey Lahue at the U.S. Army Corps of Engineers office in APO, AE. This notice is intended to inform potential vendors of an upcoming formal solicitation and includes preliminary versions of the Statement of Work, which outline the intent to develop a comprehensive water collection, distribution, and storage infrastructure tailored to the needs of the Bazum community. All technical specifications, performance requirements, and submission guidelines referenced in the draft documents are subject to change and will be finalized in the official solicitation. The contract will follow a Design-Build delivery method, requiring vendors to integrate both design and construction services into a single coordinated effort. Although the notice does not specify place of performance details beyond the village location, the project aims to deliver long-term, sustainable water solutions in a remote area, emphasizing reliability, environmental consideration, and community resilience. Vendors with experience in international infrastructure projects, particularly in water systems and off-grid settings, are encouraged to review the preliminary materials to prepare for the formal procurement process. The solicitation number is PANNAD26P0000028505, and the notice was posted on June 8, 2026, with no set-aside or small business preferences indicated at this time.
Commercial and Institutional Building Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS