Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on August 4, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LONG LEAD TIME MATERIAL AND DETAIL DESIGN AND CONSTRUCTION OF LPD 33-35 AMPHIBIOUS TRANSPORT DOCK SHIP

Closed
N00024-23-R-2473Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Pascagoula, MS, 39567, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts1 person available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA
Contacts

Full Description

Show more
The Naval Sea Systems Command intends to issue solicitation to Huntington Ingalls Incorporated, acting through its Ingalls Shipbuilding division (HII), 1000 Access Road, Pascagoula, MS 39567 for Long Lead Time Material (LLTM) and Detail Design and Construction (DD&C) of the LPD 33-35 Amphibious Transport Dock Ships. The LX(R) requirement that was developed to replace the retiring LSD 41/49 Class amphibious ships will be fulfilled with a SAN ANTONIO Class Flight II. LPD 30 is designated as the lead ship and LPD 33-35 are follow-on Flight II ships. As the designer, builder, and life cycle engineering and support provider of the entire SAN ANTONIO Class Flight I and the lead Flight II ship, HII is the only source with the requisite knowledge and experience required to construct LPD 33-35. Pursuing an alternate source through competition would result in significant duplication of costs and unacceptable delays due to the loss of design expertise and production efficiencies achieved on the previous 16 ships that cannot be recovered on LPD 33-35. No other vendor possesses the requisite facilities and qualified cadre of engineers, designers, and a construction workforce that can design, plan, construct, test, and deliver current and future amphibious ships. The primary purposes of the notice are to improve small business access to acquisition information and enhance competition by identifying subcontracting opportunities. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302-1. This notice of intent is not a request for competitive proposals. However, all responsible sources may submit a capability statement, proposal, or quotation within fifteen days after date of publication of this synopsis, which shall be considered by the Government. The Government will not reimburse respondents for any questions submitted or information provided because of this notice. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 334511
New
Federal
AN/BYG-1 Applications Re-Architecture
Solicitation # N0002426R6222
Solicitation N0002426R6222, issued by the Naval Sea Systems Command (Navsea HQ), seeks a contractor for the AN/BYG-1 Applications Re-Architecture. This effort involves the re-architecting of applications associated with the AN/BYG-1 system. The solicitation was posted on October 7, 2026, with a response deadline of November 5, 2026. The primary point of contact for the effort is Michael Ravnitzky, with Matthew C. Hedrick serving as the Contracting Officer. Due to the sensitive nature of the work, strict security and data handling requirements are in place. Offerors must possess a SECRET security clearance and provide a verified DD Form 2345 Military Critical Technical Data Agreement and a signed Terms of Use Agreement to access Government Furnished Information, source code, and technical documents. All data must be handled in accordance with NISPOM standards, and the transmission of information to foreign nationals or outside the United States is prohibited without a valid export license. Furthermore, the use of public cloud repositories or external AI tools for processing technical data is strictly forbidden. Contractors are required to destroy all provided data within 180 days of the RFP closing and maintain destruction records for five years.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 334511
New
Federal
Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
Solicitation # N00025-26-R-5246
The U.S. Navy, through the Portfolio Acquisition Executive Mission Systems and PEO IWS 6.0, is soliciting proposals for the development, production, integration, testing, fielding, and lifecycle sustainment of the Electronic Chart Display and Information System (ECDIS) hardware and software. This effort supports navigation requirements for both surface and subsurface platforms, specifically focusing on the manufacture and assembly of AN/SYN-1 and Scalable Integrated Bridge System (S-IBS) hardware, alongside the maintenance and modification of software using Government Furnished Information. The anticipated contract structure consists of one base year and four one-year option periods beginning in FY27, with an award expected in Q4 FY27. The procurement will be awarded to the offeror representing the best value to the government based on a tradeoff process. Evaluation factors include technical approach, management approach, past performance, and total evaluated cost/price, with technical and management factors weighted more heavily than price. Mandatory requirements for offerors include Secret facility and personnel clearances and compliance with ANSI/ASQ/ISO9001:2015 quality standards. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal by January 13, 2027, and must include detailed pricing using a stepladder structure for hardware and level-of-effort tasks for software support.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier for the LHD ship class. The project is expected to begin in November 2027 and reach completion by October 30, 2029. Due to the complexity and magnitude of the requirements, the procurement is not set aside for small businesses. The government intends to make a single Firm Fixed-Price award in or before March 2027 based on a best-value trade-off source selection process. The scope of work encompasses extensive tasks including structural welding, cabling, piping, electrical and ventilation work, and overhauls of the propulsion and electric plants. Key deliverables include an integrated production schedule and participation in initial schedule model and work package execution reviews. Evaluation will prioritize non-price factors, specifically technical eligibility, physical resource capacity, manpower, and past performance, which are considered significantly more important than price. Proposals must be submitted via the PIEE Solicitation Module by November 9, 2026, divided into a Price Volume and a Technical Volume. The contract includes specific provisions for growth work, with estimated requirements of 211,989 direct labor hours and over 9.5 million dollars in materials, alongside a maximum incentive available of 15 million dollars.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research under solicitation N0002427R4452 to identify capable sources for the Shipboard Air Conditioning Plant System Sustainment Plan (SSP). This initiative aims to standardize and scale the sustainment of centrifugal, reciprocating, and rotary air conditioning plants for U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract or multiple-source arrangements, to improve materiel condition and operational availability across diverse ship classes and geographic locations. The contemplated scope of work encompasses six primary capability areas: executing Major AC Plant Pit Stops and overseeing Minor Pit Stops, both of which must be completed within a mandatory six-week window; providing embedded AC&R technical expertise at Shore Intermediate Maintenance Activities (SIMAs) for Sailor training and oversight; supplying OEM AC plant materiel and repair parts; managing a global warehouse and rotable pool for Overhaul Parts Packages (OPPs); providing configuration-specific engineering, technical data, and integrated product support; and delivering global unplanned and emergent field services. Interested respondents must submit a response by October 28, 2026, including a completed Capability Certification Matrix and supporting evidence of their ability to perform these requirements organically or through teaming arrangements.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS