Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Lookout Slough Restoration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources is conducting geotechnical exploration activities for the Lookout Slough Restoration Project, specifically focusing on the Shag Slough Bridge Removal Soil Sampling in Solano County. The scope of work involves collecting one discrete soil sample from four predetermined boring locations, S1 through S4, situated on either side of the bridge scheduled for demolition. Using a 2.5-inch hand auger, borings S1 and S3 will be advanced to 10 feet below ground surface, while borings S2 and S4 will be advanced to 2 feet. Samples are to be collected at the terminus of each boring or at the point of drilling refusal and transferred directly into laboratory supplied containers. This project is classified as a forecast under NAICS code 541360 and is managed by the Division of Integrated Science and Engineering's Tidal Habitat Restoration Section. A Notice of Exemption was issued on July 16, 2026, claiming an exemption under Class 6, Section 15306 for information collection, as no significant environmental impact is anticipated. Primary points of contact for the project include Senior Environmental Scientist Emily Read and Program Manager Dan Riordan. The project location is specifically identified by coordinates 38.306586, -121.693500.

General Info

Geotechnical borings at four locations near Shag Slough Bridge to collect soil samples using hand augers for restoration planning.

Agency

California Water Resources, Department of

Place of Performance

Shag Slough Bridge, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Emily ReadSr. Environmental Scientist (Specialist)
Dan RiordanProgram Manager

Full Description

Show more
The Department of Water Resources’ (DWR) Shag Slough Bridge Removal geotechnical exploration activities will consist of collecting one (1) discreet soil sample from each of four (4) predetermined boring locations (S1 through S4) on either side of the Shag Slough Bridge that is set to be demolished. Borings S1 and S3 will be advanced to 10 feet below ground surface (bgs) and Boring S2 and S4 will be advanced to 2 feet bgs. Each boring will be advanced using hand equipment consisting of a 2.5-inch hand auger.

Similar Contracts

Same NAICS industry code

NAICS: 541360
New
SLED
City of Norco 2050 General Plan Update Project
Solicitation # 2024110840
The City of Norco is undertaking the 2050 General Plan Update Project to establish a long-term vision for land use, development patterns, infrastructure planning, and resource conservation within the city's incorporated limits. The project focuses on preserving the rural, equestrian-oriented atmosphere of residential agricultural neighborhoods, supporting local businesses, and creating a prominent downtown identity. To comply with State Planning and Zoning Law, the update includes six mandatory elements: Land Use and Community Character, Circulation, Infrastructure and Facilities, Open Space and Conservation, Safety, and Noise. The plan incorporates goals and policies developed through community outreach to enhance public facilities, parks, and transportation safety. The project is managed by the Community Development Director, Colby Cataldi, with support from Meridian Consultants. A Program Environmental Impact Report has been developed to ensure compliance with CEQA guidelines, identifying a significant environmental impact regarding paleontological resources that requires specific mitigation. The project also mandates adherence to the Americans with Disabilities Act for pedestrian infrastructure and requires strict confidentiality regarding tribal cultural resources. Additionally, any construction activities involving soil disturbance must comply with NPDES General Permit requirements, including the development of a Stormwater Pollution Prevention Plan. The public review period for the draft environmental documents was scheduled from August 14, 2026, to September 28, 2026.
City of Norco

POSTED

6 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS