Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Lookout Slough Restoration Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Water Resources is planning geotechnical exploration activities as part of the Lookout Slough Restoration Project, involving the collection of one soil sample from each of four predetermined boring locations labeled S1 through S4 near the Shag Slough Bridge, which is scheduled for demolition. Borings S1 and S3 will be drilled to a depth of 10 feet below ground surface, while S2 and S4 will reach only 2 feet below ground surface, all using hand-held equipment specifically a 2.5-inch hand auger. These limited-depth borings are designed to gather subsurface soil data necessary for planning the bridge removal and surrounding restoration efforts without requiring heavy machinery or extensive excavation. The activities are being conducted under the broader Lookout Slough Restoration Project and are forecasted to proceed with the official posting date of July 17, 2026. Primary points of contact for inquiries are Emily Read, Senior Environmental Scientist, and Dan Riordan, Program Manager, both reachable through their respective email addresses and phone numbers. The place of performance is in California, though specific city and address details are not provided in the available data. No solicitation number or set-aside information has been assigned at this stage, indicating this is a preliminary forecast for future procurement rather than an active solicitation.

General Info

Geotechnical borings at four locations near Shag Slough Bridge to collect soil samples using hand augers for restoration planning.

Agency

California Water Resources, Department of

NAICS

541360 - Geophysical Surveying and Mapping ServicesView NAICS

Place of Performance

Shag Slough Bridge, CA

Set-Aside

NONE

Documents

(2)

Exhibit A DWR Shag Slough Bridge Soil Sampling Final

PDFother

Shag Slough Soil Sampling Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Emily ReadSr. Environmental Scientist (Specialist)
Dan RiordanProgram Manager

Full Description

Show more
The Department of Water Resources’ (DWR) Shag Slough Bridge Removal geotechnical exploration activities will consist of collecting one (1) discreet soil sample from each of four (4) predetermined boring locations (S1 through S4) on either side of the Shag Slough Bridge that is set to be demolished. Borings S1 and S3 will be advanced to 10 feet below ground surface (bgs) and Boring S2 and S4 will be advanced to 2 feet bgs. Each boring will be advanced using hand equipment consisting of a 2.5-inch hand auger.

Similar Contracts

Same NAICS industry code