Los Coches Pump Station Electrical Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Helix Water District is soliciting bids for the Los Coches Pump Station Electrical Improvements (CIP26003) in Lakeside, California. The project focuses on upgrading a 65 million gallon per day transmission pump station by replacing end-of-life variable frequency drives (VFDs) for five 450 horsepower pumps and motors. The scope of work includes replacing aged electrical components, such as the automatic transfer switch, and integrating a new electrical distribution switchboard and panel to improve the station's reliability, maintainability, and operability. The contract is governed by the Public Contract Code of the State of California, as well as specific General and Special Conditions. The project must be completed within 260 working days from the Notice to Proceed, which includes 40 days for submittal review, 80 days for equipment procurement, and 140 days for the primary scope of work. Award will be granted to the lowest responsive and responsible bidder. Bidders must submit several required documents, including a bid bond, noncollusion declaration, and certifications for the Iran Contracting Act and public works contractor registration. Because the facility is classified as critical infrastructure by the Department of Homeland Security, the contractor must adhere to strict security protocols and ensure compliance with the Americans with Disabilities Act. Technical requirements include adherence to NFPA 70 and NETA Acceptance Testing Specifications, with specific mandates for electrical labeling, color-coding of phases, and the use of laser-etched stainless steel conduit tags.
General Info
Place of Performance
Set-Aside
Documents
2Read all 2 documents
Due in 51 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 2 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → Helix Water District
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
