Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lowboy Haul Trailer

Closed
W911S226U3131Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
Federal
Electric 5k–6k Draw Bar Pull (DBP) Burden Carrier TractorThe United States Coast Guard Aviation Logistics Center is conducting market research through a Request for Information (RFI) to identify sources capable of providing or manufacturing an electric burden carrier tractor with a draw bar pull force ranging from 5,000 to 6,000 pounds. This conventional tow tractor must meet specified dimensional, performance, and operational requirements including a maximum length of 150 inches with hitches, a height no taller than 90 inches with cab and beacon, and a gross vehicle weight between 7,000 and 10,000 pounds. The tractor must be electrically powered by a lithium-ion battery with at least a 10kW capacity, have onboard and optional external charging systems compatible with specified voltage inputs, and be capable of multiple operating speeds with features such as hydrostatic and power steering, emergency steering, and a robust braking system that complies with industry safety standards. The cab must be enclosed, climate-controlled with heating and optional air conditioning, and designed for maximum visibility and operator safety, including seatbelts and safety switches. Additional design and operational criteria include corrosion resistance through specialized coatings and rustproofing, structural provisions for transportability and secure tie-downs, operator controls with clear markings, and mandated safety equipment such as an audible backup alarm, fire extinguisher, and lighting systems meeting road traffic regulations. The first unit is to be delivered 120 to 160 days after order receipt, with an estimated total of 116 production units. Respondents are requested to provide detailed capability and business information, including company size, certifications, government experience, warranty terms, delivery schedules, training offerings, and pricing estimates for shipping to Elizabeth City, North Carolina. Responses to this RFI are for informational purposes only and do not constitute a contract or commitment; no proposals or quotations are being solicited at this time. The government intends to issue a formal Request for Quotes later based on the information collected, and submissions are due by early July 2026.
Aviation Logistics Center (ALC)(00038)

POSTED

2 days ago

DEADLINE

in 21 days
NAICS: 333924
New
Federal
3930--EQUIPMENT - HEAVY-DUTY FORKLIFT BRAND NAME OR EQUALThe Department of Veterans Affairs is conducting a Sources Sought Announcement to identify qualified businesses capable of supplying a heavy-duty forklift for the Northport VA Medical Center Grounds Department. This announcement is for market research purposes only and does not constitute a solicitation or request for proposals. The forklift sought is a 6,000-pound capacity, 4-wheel, diesel-powered forklift with specific features such as a Sellick SLP 60K4e-4PS model or equivalent. Key specifications include a Kohler 2.5L Tier 4 turbocharged diesel engine, fully automatic powershift transmission, 4WD axles, enclosed cab with heater, block heater, and various safety and operational features. The equipment must be hydraulically operated with pneumatic tires, meet rigorous performance and safety standards, and be maintainable by a local factory-certified repair facility. Interested respondents must provide detailed capability statements along with company information including socio-economic status, contact details, SAM UEI number, Cage Code, and Tax ID. The contractor will be responsible for delivery, installation, and transportation of the forklift to the Northport VA Medical Center. The Government expects responses by June 18, 2026, 3:00 PM EST, and no costs related to this inquiry will be reimbursed. Offers of brand name or equal products must meet all physical, functional, and performance requirements outlined, and any deviations must be clearly detailed. The procurement falls under NAICS code 333924 with a size standard of 900 employees, and there is no set-aside for this acquisition.
242-NETWORK Contract Office 02 (36C242)

POSTED

2 days ago

DEADLINE

in 2 days

General Info

Agency

Department Of Defense → W6QM Micc-Ft Drum

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing View NAICS

Place of Performance

Fort Hood TX, NY, 76544

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Drum
Contacts1 person available
OfficeFORT DRUM, NY, 13602-5220, USA
Organization / Agency
Department Of Defense → W6QM Micc-Ft Drum
Office AddressFORT DRUM, NY, 13602-5220, USA

Full Description

Show more
New unit 2026 or newer 55 ton lowboy haul trailer. GOOSENECK DESIGN - HRG (Hydraulic Removable Gooseneck); LOADED 5thWHEEL HT - 50in; SWING RADIUS - no more than 110in with alternate at 98in;SUPPORT CYLINDER - Hydraulically operated; POWER PACKAGE and PTO - Honda(or equivalent) gas engine mounted in base section with controls on side of gooseneck with additional connections for PTO; Pony motor engine cover; GOOSENECK LOCKS - at least four pair for at least 2in below road clearance without shim and additional 0in, 2in,4in, 6in with shim; ELECTRICAL CONNECTION - Seven (7) pin style connector; DECK- Four beam design with at least 26ft (25.5ft clear) in length, 8.5ft max width, minimum 8in loaded road clearance, loaded deck height 24in; FLOORING - apitong, secured with deck screws, no lumber between main beams; OUTRIGGERS - 12in swing and removable with double hook; GOOSENECK/DECKCONNECTION - Horizontal pin and plate with remote lock; DECK and REAR BRIDGE CONNECTION - Fixed/welded; RAMPS - Heavy duty, front folding, 42in maximum, and must have traction bars; SLOPE FRONT OF DECKTOP DOWN - Smooth plate with traction bars; REAR BRIDGE - Max Ht 42in; REARBRIDGE CENTER SECTION - Boom well with cross members recessed and bucket pan; WIDE CENTER BOLSTER - With flag holder and chain slots; AXLES - Three (3) with 25,000lb capacity each and must have air lift on third axle; SUSPENSION - Air suspension; BRAKES - Air actuated with spring brakes on at least one axle; WHEELS - Ten (10) stud steel disc hub piloted system with oil seals; TIRES- Twelve (12) each 255/70R22.5; FENDERS - 1/4in floor plate over tires only; LIGHTS and WIRING - 12VLED including mid-turn lights, license plate light, two (2) strobe at rear with switch; battery pack with switch in order to flash strobes and lights when gooseneck is disconnected; PAINT - Black; LASH RINGS/SECURING - At least 8 bent-style rings each side of deck and 1 each side of rear bridge main beams; ADDITIONAL - At least one (1) pair of 3/4in ID flag holders at front of deck and rear of axle 3; 55 ton capacity in 16ft section; Tool box built-in; 2-Position removable king pin; Single wheel removable covers.