Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Lower Alemany Area Stormwater Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City and County of San Francisco

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Alemany Boulevard and Gaven Street, San Francisco, CA, 94134

Set-Aside

NONE

Documents

(1)

2023-000654ENV Lower Alemany Area Stormwater Improvements Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts2 people available
OfficeN/A
Organization / Agency
California → City and County of San Francisco
Office AddressN/A
Contacts
Timothy JohnstonSenior Planner
Suzanne HuangProject Applicant

Full Description

Show more
The San Francisco Public Utilities Commission is proposing to implement the Lower Alemany Area Stormwater Improvements Project (project) to manage stormwater and to meet the SFPUC's Sewer System Improvement Program level of service goals in the Lower Alemany neighborhood. The project area sits in the Islais Creek watershed and historically floods during large storm events. During such events, flooding typically begins at the intersection of Alemany Boulevard and Ellsworth Street and continues beyond the U.S. 101 /Interstate 280 (I-280) interchange into Industrial Street and Bayshore Boulevard. The project is generally located along Alemany Boulevard and Gaven Street (south of I-280) and Boutwell Street and Industrial Street east of the U.S. 101 and I-280 interchange. The project includes constructing a new, approximately 1.4-mile-long, Alemany auxiliary sewer. The Alemany auxiliary sewer alignment primarily occurs along Alemany Boulevard and Gaven Street (south of I-280), beneath U.S. 101, and along Boutwell Street and Industrial Street east of the I-280/U.S.-101 interchange. The Alemany auxiliary sewer would connect upstream to the existing Alemany sewer and downstream to the existing Barneveld Industrial Connection Structure, which includes the Industrial sewer and the Islais Creek transport/storage sewer. The Project primarily includes construction of the following components: • Alemany Auxiliary Sewer – Tunnel and Shafts: approximately 6,350 linear feet of 10-foot-inside-diameter tunnel and three associated construction shafts and five permanent vent shafts. • Alemany Auxiliary Sewer – Box Sewer: approximately 1,000 linear feet of box • Upstream and downstream sewer connections

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS