Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on September 27, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lower Deadfall Meadow/Eddy Creek/South Gate Meadow Trail Work

Closed
127EAW21Q0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 9 hours ago

DEADLINE

in about 21 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 14 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Weed, CA, USA

Set-Aside

SBA

Documents

5

South Gate Meadows Trail Restoration Project Plans

PDF, High priority: read this firstspecifications
High

A-6.0+127EAW21Q0015.pdf

PDF

A-6.1+Project+Plans+-+Lower+Deadfall+Mdw+%21+Eddy+Creek.pdf

PDF

A-7+127EAW21Q0015-0001.pdf

PDF

A-7+RFI+Version+1+-+06.23.21.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 23, 2021 to Jul 26, 2021. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The point of contact changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 6 Usda-Fs
Contacts2 people available
OfficeAlbuquerque, NM, 871023498, USA
Office AddressAlbuquerque, NM, 871023498, USA

Full Description

Show more
AMENDMENT NOTICE Amendment 0001 adding language for multiple awards has been posted. RFI NOTICE RFI Version 1 has been posted. SOLICITATION NOTICE Solicitation and associated attachments are now available. SYNOPSIS Requirement: Trail construction to complete the following: Lower Deadfall Meadows Trail (NSF Trail 6W05) - improve non-motorized trail access in conjunction with mitigating resource damage that is occurring through the wet meadow system. This work consists of constructing an elevated boardwalk with French/rock underdrains installed (~600 ft.) and complete general maintenance on the remaining trail up to the junction with the Pacific Crest Trail (~ 1 mile). All trail work will be required to follow NFS Trail Plan Standards and Specifications for non-motorized Class 3 pack & saddle designed use and managed use for hiking/mountain biking prescriptions; Eddy Creek Trail (NFS Trail 6W02) - Reconstruct ~3/4 miles of the Parks Eddy non-motorized trail by installing rolling dips, converting the first section of trail back to a 24 width, construct climbing turns, and physically restrict motorized access to the wet meadows. All trail work will be required to follow NFS Trail Plan Standards and Specifications for non-motorized Class 3 pack & saddle designed use and managed use for hiking/mountain biking prescriptions; South Gate Meadow Trail - to improve/repair trail tread conditions of two designated trails (approximately 1 mile total) in the South Gate Meadows - area to allow proper hydrological flow and user access without harming native vegetation or contributing to erosion along the streambanks. Additionally, one of the designated trails will continue to the spring headwaters and repairs/minor reroutes will need to be completed on this trail. All remaining user-created trails leading to the spring will be restored. This trail project is in the Mt. Shasta Wilderness and must follow non-mechanized equipment requirements. All trail work will be required to follow NFS Trail Plan Standards and Specifications for non-motorized Class 2 designed use and managed use for hiking prescriptions. Location: Lower Deadfall Meadows is accessible from CA I-5, heading north take exit 751 toward Edgewood/Gazelle. Turn left onto Edgewood and continue to Old Hwy 99. Turn right onto Stewart Springs Road, in ~1/2 miles turn left to stay on Stewart Springs Road. In ~4 miles turn right onto Forest Road 42N17 for ~10.5 miles. Eddy Creek Trail (Parks Creek Trailhead) is accessible from CA I-5, heading north take exit 751 (near Weed, CA) toward Edgewood/Gazelle. Turn left onto Edgewood and continue to Old Hwy 99. Turn right onto Stewart Springs Road, in ~1/2 miles turn left to stay on Stewart Springs Road. In ~4 miles turn right onto Forest Road 42N17 for ~9 miles. South Gate Meadow Trail is accessible from CA I-5, heading north take exit 738 to W Lake Street (County Rd A-10), turn right onto W Lake Street, continue straight onto E Lake St (E Lake St turns slightly left and becomes N Washington Dr). Continue on County Rd A-10 (Everitt Memorial Hwy) for ~14 miles. FAR 36.204 Disclosure of Magnitude (base and all options (if any)): (c) between $100,000 and $250,000 Contract Time: It is estimated the project will start in August/September and be completed by September/October 2022. Set Asides: This procurement is being solicited as a small business set-aside. The North American Industry Classification System (NAICS) Code is 237990. The related small business size standard is $39.5 million. Solicitation Info: Solicitation is being conducted under FAR Part 13. All responsible sources may submit a quote, which shall be considered. Site Visit/Pre-Quote Conference: It has not yet been determined if an organized site visit will be held. This information will be available in the solicitation when posted. Bonds: If quote is over $150,000.00 a bid guarantee is required to be submitted with quote. After award, there is a requirement for payment and/or performance protection. If quote is between $35,000 and $150,000, payment protection will be required after award for 100% of the award price and be submitted within 10 days after contract award. If quote is over $150,000 payment and performance protection will be required after award for 100% of the award price and be submitted within 10 days after contract award. Inquiries: Any prospective quoter desiring additional information about the solicitation, drawings, specifications, etc., must request it in writing, not later than 4 business days before the closing date, to allow a reply to reach all prospective quoters before submission of their quotes. Requests for information received after that time may not receive a response. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Requests for information about the solicitation, drawings, specifications, etc. should be submitted in writing by email to Tracy Marino at tracy.marino@usda.gov. Notifications: In accordance with FAR 5.102(d), the government is limiting the availability of the solicitation to electronic medium through this posting to SAM.gov. Notification of any postponements and any amendments to this solicitation will be posted on this website. It is the sole responsibility of the quoter to continually view this website for any amendments made to this solicitation. Solicitation documents are anticipated to be posted on or about 2 Jun 21. Award notifications will be made to this notice. Early notification will not be made to any quoter except Awarded Contractor.

More opportunities from Department Of Agriculture → Csa Southwest 6 Usda-Fs

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS