Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lower Farmington Creek Trail

Closed
FarmingtonLFCTState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

Farmington City is soliciting bids for the construction of the Lower Farmington Creek Trail Project, which involves significant upgrades to the existing trail infrastructure. The scope includes new trail construction, restoration of unsustainably designed sections, and the implementation of technical features such as switchbacks, rock steps, rock stairways, retaining walls, bench cuts, culverts with rock headwalls, stair sets, and bridge construction. All work is intended to improve trail durability, safety, and long-term usability while minimizing environmental impact. Bids must be submitted as sealed proposals and received by 2:00 p.m. local time on July 16, 2026, at Farmington City Hall, 160 S Main Street, Farmington, Utah, where they will be publicly opened. No mandatory pre-bid meeting is scheduled. Bidding documents are accessible starting June 23, 2026, on the Utah Bonfire U3P website, and all inquiries must be submitted through the same portal no later than July 10, 2026. For assistance, contact Russell Coons at [phone hidden] or [email hidden].

General Info

Farmington City seeks bids for Lower Farmington Creek Trail upgrades with structural features, due July 16, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

2

Lower Farmington Creek Trail Construction Bid Document

PDF, High priority: read this firstifb
High

Lower Farmington Creek Trail Construction Bid Set

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts
Russell Coons

Full Description

Show more
Farmington City is requesting proposals for the construction of the Lower Farmington Creek Trail Project. This trail construction project consists of improvements to the existing Farmington Creek Trail, as well as reroutes to the existing trail which are unsustainable. The project includes new trail construction, trail restoration, trail switchbacks, rock steps, rock stairways, rock retaining walls, bench cuts, fill material, standard culverts with rock headwalls, stair set, bridge construction, etc.
Separate sealed Bids for the construction of the project will be received by Farmington City at Farmington City Hall, located at 160 S Main Street, Farmington, Utah no later than 2:00 pm local time, on July 16, 2026 where they will be publicly opened and read aloud in the conference room.
A mandatory pre-bid meeting will not be held for this project.
BIDDING DOCUMENTS will be available on Tuesday June 23, 2026 on the Utah Bonfire U3P website. All questions shall be submitted via Bonfire by July 10, 2026. For questions regarding this project, please contact Russell Coons at +1 (555) 000-0000 or email contact@example.gov.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS