Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lower Poplar Water Reclamation Facility Influent Pump Station Improvements

Closed
PE-33561-NONST-2024-000000010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional site requirements include the installation of stormwater facilities, fencing, a yard hydrant, and comprehensive grading and shaping. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE participation goals, which include EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Bidders must provide a performance bond and payment bond equal to the contract price, and insurance providers must maintain an A.M. Best rating of A-VII or better. Project administration is managed by Willis Engineers, and payments are processed via Applications for Payment, becoming due 30 days after presentation to the owner. All work must adhere to ANSI/AWWA and ASTM standards, with final acceptance contingent upon absolute compliance with the contract documents.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in about 11 hours
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as the installation of site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bidders must adhere to strict compliance standards, including the Davis-Bacon Act, American Iron and Steel requirements, and EEO regulations. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract amount and ensure all work meets VDOT 2020 Road and Bridge Specifications and City of Winchester Standards. Bids must be submitted electronically via the City's e-Procurement Portal by 2:00 pm on November 12, 2026.
WG Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in about 11 hours

AI Contract Overview

Show more

The Macon Water Authority is inviting sealed bids for the Lower Poplar Water Reclamation Facility Influent Pump Station Improvements project in Macon, Georgia. The project involves converting the existing wet well and dry pit pump station into a modern submersible pump station equipped with six variable speed pumps—four high-flow and two low-flow—to accommodate off-peak flow conditions. Key components include installing isolation valves on the force mains, adding magnetic flow meters within a concrete vault, demolishing the current electrical building, and constructing two prefabricated electrical buildings (eHouses) to house VFDs, electrical distribution, motor control equipment, and SCADA controls with climate control. Early procurement of critical equipment such as pumps, VFDs, flow meters, and eHouses has been initiated and will be included as allowances in the contract. Bidders must attend a mandatory pre-bid meeting and site visit, with all questions due by August 20, 2024, and bids due by August 27, 2024. The project size ranges from five to ten million dollars, and the owner reserves the right to reject or waive bids as deemed appropriate. Additional detailed bid information is available on the Macon Water Authority’s website.

Documents

1
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 33561 MACON PE-33561-NONST-2024-000000010 to PE-33561-NONST-2024-000000010.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Fanin County Water Authority
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
INVITATION TO BID: MACON WATER AUTHORITY, MACON, GA Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of Lower Poplar Water Reclamation Facility Influent Pump Station Improvements (the ¿Project¿) will be received by the Macon Water Authority (the ¿Owner¿), at 537 Hemlock Street, HR/Engineering Conference Room, Macon, GA 31201 until 2:00 P. M., local time, on August 27, 2024, and then at said office publicly opened and read aloud. All bidders must attend a mandatory pre-bid meeting in its entirety at the same location at 10:00 A.M. on August 6, 2024. A site visit will follow the Pre-Bid meeting. All bid questions must be submitted to the Owner by 10:00 A.M. on August 20, 2024. The Project consists of improvements to convert the existing wet well / dry pit pump station into a submersible pump station with six (6) new variable speed submersible wastewater pumps and appurtenances. Four of the pumps will be high-flow pumps, and two will be low-flow pumps to match off-peak duty flow conditions. Isolation valves will be installed on the two pump station effluent force mains. Two magnetic flow meters will be installed in a concrete vault on the force mains. The existing Electrical Building will be demolished, and two prefabricated electrical buildings (eHouses) will be provided to house the variable frequency drives (VFDs), electrical distribution, motor control equipment, and SCADA controls with temperature and humidity control. The Owner is proceeding with early procurement of the new pumps, VFDs, plug valves and actuators, flow meters, and eHouses, to be included in the Contract as Allowance items. The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive informalities and technicalities. Detailed Bid Information can be found at https://maconwater.org/bids/construction/ Macon Water Authority, Ron Shipman, Executive Director & President.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS