Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on August 5, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lower Snake River XJ0 Breaker Replacement

Closed
W912EF-16-R-SS47Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for agency staff on inspection tools, and develop comprehensive standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel availability, fee structure, and a proven track record of performing similar projects for utilities or industrial facilities. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as non-collusion and workers compensation. The resulting contract will feature fixed pricing for an initial term with potential one-year extensions. Awardees must comply with California Labor Code prevailing wage requirements and maintain strict confidentiality regarding all agency reports and data.
Inland Empire Utilities Agency

POSTED

about 12 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including the cafeteria, recreation building, and dormitories. Key tasks include performing functional tests by simulating utility outages, replacing failed ballasts with LED-compatible versions, and applying durable labels to fixtures for future tracking. The contractor must ensure full compliance with NFPA 101 (2024 Edition) and NFPA 70 standards, integrate recurring maintenance into the center's Computerized Maintenance Management System, and provide certificates of disposal for hazardous materials. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must include a detailed cost breakout and a mandatory physical site visit. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This solicitation is set aside for small businesses and various SBA-certified categories. Award decisions will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act, Federal Contractor Minimum Wage, and FAR regulations regarding work hours, safety standards, and the Buy American Act.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The US Army Corps of Engineers, Walla Walla District, is seeking small business sources for a firm-fixed-price construction contract to replace aging 13.8 kV circuit breakers at the Ice Harbor, Lower Monumental, Little Goose, and Lower Granite Dams in Washington. The project involves the demolition and removal of existing circuit breakers, switchgear enclosures, and control conductors, followed by the installation of new equipment and the provision of spare breakers. The estimated construction value is between 1 million and 5 million dollars, with an expected period of performance of 650 days. Qualified contractors must have specific experience with medium voltage switchgear and circuit breakers and must adhere to strict safety and quality control standards, including EM 385-1-1 requirements. Key personnel requirements include a competent project superintendent, a certified Site Safety and Health Officer, a Fall Protection Competent Person, and a dedicated CQC System Manager. This sources-sought announcement is used to identify capable firms; interested small businesses under NAICS code 238210 must submit their technical experience, business size, bonding capacity, and company identifiers by August 16, 2016.

General Info

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Ice Harbor Dam, (HLD) in Pasco, WA Little Goose Dam, (LGA) in Dayton, WA Lower Monumental Dam, (LMO) in Kahlotus, WA Lower Gran, WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts1 person available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more
The US Army Corps of Engineers, Walla Walla District is seeking small business sources for a construction contract titled: Lower Snake River XJ0 Breaker Replacement. The work will be done at the following Location: Ice Harbor Dam, (HLD) in Pasco, WA Little Goose Dam, (LGA) in Dayton, WA Lower Monumental Dam, (LMO) in Kahlotus, WA Lower Granite Dam, (LLA) in Pomeroy, WA This will be a firm-fixed-price construction contract. The North American Industry Classification System (NAICS) code for this project is 238210 Electrical Contractors and Other Wiring Installation Contractors and the associated small business size standard is $15.0M. Magnitude of Construction is estimated to be between $1,000,000 and $5,000,000. Estimated period of performance 650 days. This sources-sought announcement is a tool to identify businesses with the capability and technical experience to accomplish the work. This is not a solicitation. Only those firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement. A.) A list of current or past projects demonstrating technical experience with work of a similar nature to that listed in the Summary Scope of Work. For each project submitted, provide a brief narrative statement of the work involved, your firm's role in the project, the dollar value and the completion date. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel. B.) A reference list for each of the projects submitted in A) above. Include the name, title, current phone number and email address. C.) Provide a statement of your firm's business size (HUBZone, Service Disabled Veteran Owned, 8(a), small disadvantaged, or woman-owned) with regards to the NAICS code listed above. D.) Provide a statement that your firm intends to submit an offer on the project when it is advertised. E.) Provide a statement of your firm's bonding capacity. A statement from your surety is NOT required. F.) Cage Code and DUNS number. Submit this information to cristina.a.vega@usace.army.mil, Contract Specialist, via email. Your response to this notice must be received on or before 2:00 PM Pacific Daylight Time on Tuesday, August 16, 2016. Summary of Scope of Work: This project is to replace the existing 13.8 kV circuit breakers that feed the Station Service switchgear at Ice Harbor, Lower Monumental, Little Goose and Lower Granite. The circuit breakers are original equipment and are nearing end of life. Due to the critical nature of these breakers, the indication of degradation leading to end of life conditions or decreased reliability, are sufficient cause to consider replacement. The Station Service feeder breakers are a key element of the Station Service power system at each of the projects. The circuit breakers are the upstream Over Current Protection Device (OCPD) for the Station Service Switchgear. The station service switchgear provides power to all the critical loads of the Dams from two separate busses. A long-term failure of either feeder breaker will cause an elevation of risk and increase the potential for flooding of the dam. For the 4 Dams listed above, the following electrical work is required to complete the XJ0 Breaker replacement. Ice Harbor Lock and Dam a) Complete demolition and removal of the existing XJO circuit breaker, switchgear enclosure, and control conductors as indicated in the contract documents. b) Complete installation of XJO circuit breaker, switchgear enclosure and control conductors as indicated in the contract documents. c) Reorient the switchgear provided in this contract, 90 degrees counterclockwise from exiting location. Switchgear shall be facing as indicated in contract drawings. d) Disconnect the existing ISO-Phase line side and load side bus from the existing switchgear and reconnect to switchgear provided in this contract. e) Provide capability to Rack-In/Rack-Out and to Open/Close the circuit breaker from a pendant mounted, handheld device with a minimum of 25' of clearance. f) Provide a spare circuit breaker. g) Perform all testing as specified and submit test report for review prior to energizing switchgear. Lower Monumental Lock and Dam a) Complete demolition and removal of the existing XJO1 and XJ02 circuit breakers, switchgear enclosures, and control conductors as indicated in the contract documents. b) Complete installation of XJO1 and XJ02 circuit breakers, switchgear enclosures and control conductors as indicated in the contract documents. c) Disconnect the existing ISO-Phase line side and load side bus from both of the existing switchgears and reconnect to switchgears provided in this contract. d) Provide capability to Rack-in/Rack-out and to Open/Close the circuit breaker from a pendant mounted, handheld device with a minimum of 25' of clearance. e) Provide a spare circuit breaker. f) Perform all testing as specified Little Goose Lock and Dam a) Complete demolition and removal of the existing XJO1, XJ02, and XJ7 circuit breakers, switchgear enclosures, and control conductors as indicated in the contract documents. b) Complete installation of XJO1, XJ02, and XJ07 circuit breakers, switchgear enclosures and control conductors as indicated in the contract documents. c) Disconnect the existing ISO-Phase line side bus and the load side conductors from the existing switchgears and reconnect to switchgears provided in this contract. Provide new termination kit for each power conductor to switchgear to be reconnected to switchgear. d) Provide capability to Rack-in/Rack-out and to Open/Close the circuit breaker from a pendant mounted, handheld device that connects directly into the switchgear face with a minimum of 25' of clearance. e) Provide and Install protective relaying for XJ7. f) Provide a spare circuit breaker. g) Perform all testing as specified and submit test report for review prior to energizing switchgear. Lower Granite Lock and Dam a) Complete demolition and removal of the existing XJO1 and XJ02 circuit breakers, switchgear enclosures, and control conductors as indicated in the contract documents. b) Complete installation of XJO1 and XJ02 circuit breakers, switchgear enclosures and control conductors as indicated in the contract documents. c) Disconnect the existing ISO-Phase line side bus from the existing switchgears and reconnect to switchgears provided in this contract. d) Provide new power conductors from XJO1 to TO1 and from XJO2 to TO2. Provide new termination kits for each power conductor to be connected to switchgear. e) Provide capability to Rack-in/Rack-out and to Open/Close the circuit breaker from a pendant mounted, handheld device that connects directly into the switchgear face with a minimum of 25' of clearance. f) Removal of existing equipment pad for XJ02. g) Provide a spare circuit breaker. h) Perform all testing as specified The contractor must have experience in medium voltage switchgear and circuit breakers (defined by IEEE as 601V-69kV) projects. All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). Establish and manage an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. PROJECT SUPERINTENDENT At all times during performance of this contract and until the work is completed and accepted, the Contractor shall assign and have on the worksite a competent superintendent as per FAR Clause 52.236-6 "Superintendence by the Contractor". A Site Safety and Health Officer (SSHO) employed by the prime contractor is required for the contractor's on-site operations. The SSHO shall possess a minimum of 5-years' experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5 years, and shall have 8 hours of safety training each year for the past 5 years. The Site Safety and Health Officer (SSHO) may be assigned as the fall protection competent person. Provide a qualified Fall Protection Competent Person for the contractor's on-site operations that involves work that exposes workers to fall hazards. The Fall Protection Competent Person shall possess a minimum 2-years supervisory experience overseeing the use of fall protection equipment and systems. Within the last two (2) years, they must have successfully completed at least one fall protection competent training course that includes both classroom instruction and hands-on practical training. Furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1. Furnish construction equipment to support elevated working positions such as scaffolding, scissor-lifts, boom-lifts, and aerial lift equipment. Establish and manage an effective Contractor Quality Control Program that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor is required to be on-site for each shift of the Contractor's operations and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC System Manager shall be assigned no other duties. The CQC System Manager must possess a minimum of 5 years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled "Construction Quality Management for Contractors" within the last 5 years. The project involves the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract. Miscellaneous work within the project includes the delivery of As-Built Drawings.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA002
The US Army Corps of Engineers, Walla Walla District, is soliciting a firm fixed price contract for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project requires the contractor to provide all personnel, materials, equipment, and supervision necessary for the pickup, dry-blast cleaning to white metal, weld repair, and new coating application of the bulkheads. The work must be performed in accordance with strict industry standards, including AWS D1.1 for welding and SSPC SP 5 / NACE No. 1 for surface preparation. Deliverables are scheduled across multiple units, with specific return dates such as January 23, 2027, for Unit 4 and April 19, 2027, for Unit 5. The contractor must be a certified SSPC QP 3 painting contractor or hold an AISC Complex Coatings endorsement and provide a third-party certified coatings inspector at the SSPC-PCI Level 2 or NACE CIP Level 2. Quality assurance is paramount, requiring detailed inspection reports for each bulkhead and the use of magnetic flux thickness gages per ASTM D7091. The government reserves the right to conduct quality assurance inspections at the contractor's facility. Proposals are due by October 30, 2026, and will be evaluated based on price and other factors to determine the most advantageous offer. All shipping is required to be FOB destination to the Dworshak Project Office in Ahsahka, Idaho.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

5 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS