Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on October 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LT-234.270 (RFx 7*801) - (ADV) - Lincoln Tunnel - Galvin Plaza Bridge Deck Replacement Via Work Order

Closed
State & Local
Submission Closed
Solicitation #
LT-234.270

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
Transportation and Economic Corridors - Invitation to Bid - TND0025216 - Cold Milling, Asphalt Concrete Pavement and Other Work, 697:02 Hwy 35 - 18 Km E of Hwy 35 selective
Solicitation # TND0025216
Transportation and Economic Corridors is soliciting bids for project TND0025216, involving cold milling, asphalt concrete pavement, and related construction work on Hwy 35 in the Peace Region, specifically from kilometre 0.000 to 16.740. The scope of work includes the installation of 43,900 tonnes of asphalt concrete pavement (EPS Mix Type M1), 74,050 square metres of cold milling, 31 kilometres of milled rumble strips, and various culvert works including grouting and the installation of smooth wall steel pipe and culvert liners. The contract completion date is October 15, 2027. The contract will be awarded to the lowest priced compliant bidder. Bidders must possess a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or Certificate of Recognition Equivalency Letter (COREL) as a precondition for the award; a Small Employer Certificate of Recognition (SECOR) is not acceptable. Tenders must be submitted in an unprotected PDF format via email to [email hidden] by January 13, 2027, at 2:01:00 p.m. Each submission must include a digital bid bond equal to 10% of the tender amount. Payment is processed through Proper Invoices with a 28-day payment timeline and a 5% holdback. The contractor is required to implement a Quality Control Inspection Program (QCIP) and provide a one-year warranty for workmanship and a minimum two-year manufacturer's warranty for materials. There is no set-aside status for this solicitation.
Transportation and Economic Corridors

POSTED

about 13 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Port Authority of New York and New Jersey is soliciting bids for solicitation LT-234.270, a Net Cost Work Order for the replacement of the Galvin Plaza bridge deck at the Lincoln Tunnel in New York, New York. The project scope includes reinforcing the existing steel structure, installing a concrete deck, and providing protection shielding over the Amtrak rail line located beneath the bridge. Additional requirements involve the installation of expansion joints, wearing courses, painting, pavement markings, traffic attenuators, and signage, as well as the removal of asbestos and lead paint, maintenance of traffic, and work area protection. The estimated value of the contract ranges from 80 million to 90 million dollars, with a three-year term of performance and a required bid bond of 8.1 million dollars. To be considered responsive, bidders must demonstrate they have completed at least two projects of similar size and type within the last five years and at least one project on or near a railroad involving strict safety and access coordination, with a preference for recent Amtrak experience. The contract mandates compliance with prevailing wage rates and establishes supplier selection goals of 20 percent for Minority Business Enterprises, 10 percent for Women Business Enterprises, and 3 percent for Service-Disabled Veteran-Owned Businesses. Bids must be submitted digitally via the Bonfire platform by 2:30 PM EST on October 29, 2026. Payments will be made via electronic funds transfer within fifteen days of receiving a monthly certificate, subject to a retainage of 5 percent of the net cost or 100,000 dollars, whichever is less.

General Info

Bids for the $80-90 million Galvin Plaza bridge deck replacement in New York.

Documents

7
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first255 pages · rfb
High
PDF, High priority: read this first2 pages · ifb
High
PDF, High priority: read this first2 pages · special-notice
High
PDF, Low priorityq-and-a
Low
PDF, Low priorityq-and-a
Low
PDF, Low priorityq-and-a
Low

Read all 7 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

40 mandatory

40 requirements in 10 areas

  • Eligibility11 · 11 must
    006

    Certification of Legal and Regulatory Standing

  • Compliance8 · 8 must
    021

    Indemnification for Construction Equipment Lessors

  • Submission5 · 5 must
    001

    Proposal Submission Deadline

  • 37 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 40 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 4 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 19 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 29, 2026 to Nov 5, 2026.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Port Authority Of Ny & Nj
Contacts1 person available
OfficeNY, USA

Interested Companies (75)

AdminLoginCore
AEIS
Aggregate TechnologiesHouston, Texas

See All 75 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Summary Description of Work: replacement of bridge deck including protection shielding over existing Amtrak rail line below the bridge deck, reinforcing of existing steel structure, concrete deck, expansion joints, wearing course, painting, pavement markings, traffic attenuators, signage, asbestos and lead paint removals, maintenance of traffic and work area protection, and related Work at the Galvin Plaza bridge and vicinity thereof, at the Lincoln Tunnel, New York, New York, all as directed by the Engineer and in accordance with Work Order(s) issued by the Engineer
This Contract contains the following Prerequisites:
A. The bidder must demonstrate the following:
1.) That the bidder has worked on at least two projects of similar size and type in the past five years.
2.) That the bidder has worked on at least one project on or near a railroad where access requirements, rail safety requirements and close coordination with the rail line were required and preference will be given to contractors with recent experience with Amtrak.

More opportunities from New York → Port Authority Of Ny & Nj

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS