This Solicitation opportunity from Florida was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Lump Sum Bid Package - Haines Creek, Astatula & Ferndale Substations

Closed
seco-energy-2026-44-2026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 1 hour ago

DEADLINE

in about 4 hours
NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. The scope of work encompasses a comprehensive range of services including demolition, site and soil preparation, irrigation, planting, concrete work, lighting, and low-voltage electrical work. The project must be completed within 45 working days and adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and specific guidelines for tree preservation and Caltrans thermoplastic specifications for pavement markings. The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal, and the submission must include a bid security of at least 10 percent of the bid amount. Successful bidders are required to provide performance and payment bonds within ten business days of the award. Compliance with the California Department of Industrial Relations for prevailing wages, the City's Living Wage Ordinance, and Equal Employment Opportunity regulations is mandatory. The City offers local business preferences, including a 2 percent preference for businesses with a local office and an additional 4 percent for those with at least 50 percent local ownership within Santa Cruz County.
Economic Development and Housing

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 561730
New
SLED
Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF
Solicitation # PD 25-26.118
Solicitation PD 25-26.118 is an Invitation to Bid issued by Escambia County for the Dune Matrix Enhancement project at Pensacola Beach, Florida. Funded by the National Fish and Wildlife Foundation National Coastal Resiliency Fund, the project aims to improve coastal resiliency and biodiversity through the installation of approximately 78,710 units of native vegetation, including sea oats, panic grass, and diversity groundcover. The scope of work also includes the installation of sand fencing, post-and-rope fencing, and signage, as well as the removal of asphalt debris across approximately 24,004 square yards. All planting must utilize a super absorbent polymer pre-hydrating gel and adhere to specific root ball and depth requirements. The contract requires substantial completion within 150 consecutive calendar days from the Notice to Proceed, with total completion due within 180 days, excluding documented weather delays. Bids are evaluated based on responsiveness, responsibility, and price, with the County reserving the right to award on an all-or-none or lot-by-lot basis. Because of the federal funding source, the project must comply with the Davis-Bacon Act for prevailing wages, the Copeland Anti-Kickback Act, and Build America, Buy America requirements for iron, steel, and construction materials. Contractors must provide performance and payment bonds, maintain general liability insurance, and ensure all work complies with OSHA standards and the Americans with Disabilities Act.
Purchasing

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 561730
New
Federal
Snow Removal + Hauling BPA
Solicitation # FA460027Q0001
Solicitation FA460027Q0001 is a Total Small Business Set-Aside for a Blanket Purchase Agreement to provide mission-essential snow clearing, relocation, and hauling services at Offutt Air Force Base, Nebraska. The contractor is responsible for maintaining operational capability during winter weather events by clearing a combined footprint of 1,014,497 square feet, covering the B1000 Complex and Capehart Off-Base parking lots. Requirements include providing CDL licensed operators and tandem-axle dump trucks with at least a 10 cubic yard capacity. The scope of work involves tiered clearing based on snowfall accumulation, base-wide hauling to designated dump sites, and a 24/7 meteorological watch and standby capability. The ordering period runs from November 1, 2026, to April 30, 2028, with a strict performance start time of two hours following a call order notification. Award will be based on the lowest Total Evaluated Price among technically acceptable offers, with a pass/fail evaluation of the required Mission Essential Services Plan. Invoicing is processed electronically via the Wide Area WorkFlow system and paid by a GPC holder. Contractors must comply with Department of the Air Force Occupational Safety and Health standards and provide necessary documentation, including valid licenses and insurance, to obtain base access. Offers are due by November 2, 2026, and must include a price list, a technical plan not exceeding 15 pages, and the mission essential services plan.
FA4600 55 Cons Pkp

POSTED

about 8 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

Solicitation 2026-44 is a fixed-price lump sum contract issued by Seco Energy for complete vegetation clearance and herbicide treatment across approximately 104 miles of right-of-way serving the Haines Creek, Astatula, and Ferndale substations. The scope of work requires the contractor to perform natural tree trimming and removal in accordance with ISA Best Management Practices and ANSI A300 Standards, maintaining minimum clearances of ten feet from distribution conductors and thirty feet from transmission conductors. The project is scheduled to commence no later than August 10, 2026, with a mandatory completion date of December 18, 2026. To qualify, bidders must submit comprehensive proposals via Vendor Link, including pricing for each substation individually or as a combined package, relevant certifications, and references from comparable projects. A critical requirement is the submission of safety performance metrics from the past three years, specifically the Experience Modification Rate and OSHA Days Away, Restricted, or Transferred Rate. The contract mandates a 100% performance bond before work begins and stipulates liquidated damages of 200 dollars per day for delays. Additional services, such as storm or outage response, must be pre-approved in writing and are billed at submitted hourly personnel and equipment rates.

General Info

Seco Energy fixed-price contract for vegetation clearance on 104 miles by December 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

21

AS4 Location Distance Table

PDF, High priority: read this firstspecifications
High

HC2 Location and Substation Data

PDF, High priority: read this firstspecifications
High

Lump Sum Bid - Haines Creek, Astatula, & Ferndale Substations

PPTX, High priority: read this first12 pages · rfp
High

SECO Energy Line Clearance Trimming Specifications

PDF, High priority: read this firstspecifications
High

SECO RFP 2026-44: Vegetation Clearance Lump Sum Contract

PDF, High priority: read this firstrfp
High

Astatula - AS1 Feeder 1 Map

PDF, Low priorityspecifications
Low

Astatula - AS2 Feeder 2 (OH Lines) Map

PDF, Low priorityspecifications
Low

Astatula - AS3 Feeder 3 Map

PDF, Low priorityspecifications
Low

Award Letter - Bid # 2026-44 (Haines Creek, Astatula & Ferndale Substations)

DOCX, Low priority1 page · award
Low

Contractor Safety Metrics Submission Form

DOCX, Low priority2 pages · supporting-document
Low

FD2 - Location Data

PDF, Low priorityother
Low

Ferndale - FD4

PDF, Low priorityother
Low

Ferndale - FD Feeders Map

PDF, Low priorityother
Low

Haines Creek - HC1 Map/Location Data

PDF, Low priorityspecifications
Low

Haines Creek - HC4 Feeder 4 Map Data

PDF, Low priorityspecifications
Low

Haines Creek - HC Map/Diagram

PDF, Low priorityspecifications
Low

HC3.pdf

PDF, Low priorityother
Low

Location List - Snell Law Group LLC

PDF, Low priorityother
Low

Pre-Bid Meeting - Solicitation 2026-44 Vegetation Clearance Contract

PDF, Low priorityindustry-day
Low

SECO Services Agreement Sample

DOCX, Low priority9 pages · contract-document
Low

Summer Electric Cooperative - Astatla AS Map

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Seco Energy — Purchasing
Contacts2 people available
OfficeFL
Office AddressFL
Contacts
Vernon Matthews
Contracts Team

Full Description

Show more
This Agreement is for the complete vegetation clearance and herbicide treatment within the SECO-designated right-of-way, as described in Exhibit 1 – Scope of Work (the “Work”). The Contractor shall perform all Work in strict accordance with Exhibit 2 – Line Clearance Trimming Specifications (the “Specifications”). This bid package for the following three substations: Haines Creek, Astatula, and Ferndale. Bids may be submitted either for each substation individually or as a combined lump-sum proposal covering all three substations, totaling approximately 104 miles. The Contractor shall employ appropriate equipment and qualified personnel to perform natural tree trimming and removal in accordance with the ISA Best Management Practices and ANSI A300 Standards, maintaining a minimum clearance of ten (10) feet from all distribution conductors and thirty (30) feet from all transmission conductors and associated facilities within the designated right-of-way (ROW) under this Contract. SECO shall provide reasonable assistance as necessary to facilitate access for vegetation clearance in accordance with the Scope of Work. The Contractor shall submit its safety performance metrics for the past three (3) years as part of the contract documentation. Required metrics include: • Experience Modification Rate (EMR) • Occupational Safety and Health Administration (OSHA) Days Away, Restricted, or Transferred (DART) Rate The Contractor shall provide supporting documentation, including OSHA Form 300A or equivalent records for each of the most recent three reporting years, upon request. Failure to provide accurate safety performance information may result in disqualification or termination of the agreement. The Contractor is responsible for establishing and enforcing safe work practices, rules, and regulations appropriate to the scope of the Work. All operations shall follow SECO’s established This Agreement shall commence no later than August 10,2026 and shall be completed by December 18, 2026. ***** No work shall commence under this solicitation until SECO Energy has received formal notification of the vendor’s performance bond. ***** ***All questions and proposals must be submitted on Vendor Link. PLEASE NO PHONE CALLS OR EMAILS*** ***The following requirements must be met, in order to submit your bid on Vendor Link*** Bidders must submit a complete proposal that includes the following: • Pricing covering the Scope of Work Must enter the lump sum or sum bid package for the following three substations: Haines Creek, Astatula, and Ferndale. Bids may be submitted either for each substation individually or as a combined lump-sum proposal covering all three substations, totaling approximately 104 miles in the Quote/Bid Information section in Vendorlink. • Documentation of relevant qualifications and certifications related to vegetation trimming and removal in utility environments. • References from comparable vegetation management contracts or projects. • The Contractor shall submit its safety performance metrics for the past three (3) years as part of the contract documentation. Required metrics include: 1Experience Modification Rate (EMR) 2.Occupational Safety and Health Administration (OSHA) Days Away, Restricted, or Transferred (DART) Rate • Hourly personnel and equipment rates for additional services—such as, but not limited to, storm or outage response—that fall outside the Scope of Services. These services shall be requested and approved in writing by SECO prior to commencement. • Must upload your proposal, choosing `Proposal` as your file type.

More opportunities from Florida → Seco Energy — Purchasing

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS