Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 28, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

LWSC LARGE LOCK CENTER GATE REPLACEMENT

Closed
W912DW22R0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Seattle, WA, 98107, USA

Set-Aside

NONE

Documents

1

Amendment_5_W912DW22R0014_for_LWSC_Large_Lock_Center_Gate_Replacement.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Apr 21, 2022 to Apr 29, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 29, 2022 to May 9, 2022. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
Contacts2 people available
OfficeSEATTLE, WA, 98134-2329, USA
Office AddressSEATTLE, WA, 98134-2329, USA
Contacts

Full Description

Show more
The U.S. Army Corps of Engineers (USACE), Northwest Division, Seattle District, requires replacement of the Lake Washington Ship Canal (LWSC) Large Lock Center Gates (LLCG) and incidental related work. The work involved in this project includes, but are not limited to, fabricating, testing, painting, delivering, and installing new miter gate assemblies, removing the existing decommissioned miter gates, disconnecting the existing gates from the operating machinery, reconnection of the operating machinery to the new miter gates, commissioning of the miter gates, and concrete work associated with the miter gate installation. The new miter gate assemblies are primarily a welded structure consisting of 2 leafs, measuring approximately 46 feet wide by 60 feet tall, with each leaf weighing approximately 180,000 pounds without silt/debris. The project will include replacement of the lock chamber appurtenances which affect the miter gate installation, which includes the concrete embedded wall quoin, concrete embedded pintle base, pintle ball/bushing, and anchorage bars. The commissioning of the miter gates will not only include the final installation of the miter gates, but also how the gate interfaces with the embedded wall quoin, miter seals, pintle assemblies, and existing operating machinery and sensors which control gate movement. The project will also include the installation of new concrete embedded connection castings and replacement of the HDPE seal located on the miter gate sill near the bottom of the lock chamber. The magnitude of construction is estimated to be between $10,000,000 and $15,000,000. The electronic version of the Solicitation can be access via PIEE Solicitation Module (link below) Amendment 01 issued on 31 March 2022 - see PIEE Solicitation Module for documents. Amendment 02 issued on 8 April 2022 - see PIEE Solicitation Module for documents. Amendment 03 issued on 15 April 2022 - see PIEE Solicitation Module for documents. Amendment 04 issued on 22 April 2022 - see PIEE Solicitation Module for documents. Amendment 05 issued on 28 April 2022 - see PIEE Solicitation Module for documents.

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 236220
New
Federal
JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON
Solicitation # W912DW27RA014
Solicitation W912DW27RA014 is a firm fixed price, total small business set-aside contract issued by the U.S. Army Corps of Engineers, Seattle District. The project involves the renovation and conversion of two 1950s-era barracks buildings, known as the Hammer Heads, totaling approximately 63,400 square feet at Joint Base Lewis-McChord, Washington. Building 3224 will be converted into a Brigade Support Battalion facility featuring a Battalion HQ and company operations spaces, while Building 3223 will become a combined administration, readiness, and troop aid facility. The scope of work includes comprehensive site preparation, demolition, utility construction, and specialized environmental remediation for asbestos and lead-based paint abatement. The contract has a mandatory performance period of 730 calendar days from the notice to proceed. Key technical requirements include the installation of outside plant telecommunications, adherence to ABA/ADA accessibility standards, and the use of specific Monaco fire alarm radio transceivers for network compatibility. Award will be determined via a Best Value Tradeoff process, where non-price factors, including past performance and project narrative, are significantly more important than price. Contractors must provide performance and payment bonds, comply with Davis-Bacon wage determinations, and adhere to strict military standards for packaging, marking, and the handling of controlled unclassified information.
Commercial and Institutional Building Construction

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID
Solicitation # W912DW27R1BWMSS
The U.S. Army Corps of Engineers, Seattle District, is conducting market research via a sources sought notice for the design and construction of an Air Traffic Control Tower at Mountain Home Air Force Base in Idaho. The project has a budgeted amount of 32 million dollars and an estimated period of performance of 730 calendar days. The facility must include a control cab accommodating at least six controller stations and five trainers, as well as support spaces such as a simulator room, offices, administrative areas, training and break rooms, and electronic equipment rooms. The government intends to utilize a Progressive Design Build approach with Other Transaction Authority, employing a qualifications-based selection process. This will involve an initial screening to shortlist three firms, followed by interactive pitch meetings to evaluate technical approaches and collaborative capabilities. The procurement will be split into two phases: Phase 1 focusing on the design agreement and Phase 2 focusing on final design and construction under a Guaranteed Maximum Price. Interested firms must submit a capabilities package of no more than 10 pages, including CAGE codes, UEI numbers, and bonding information, to the designated points of contact by the specified deadline.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
Federal
Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222
Solicitation # W912DW27RA017
The USACE Seattle District is conducting market research via a special notice and survey to determine the feasibility of a Project Labor Agreement for the conversion of two barracks buildings, known as the Hammer Heads, into operational facilities for three tier levels of command at Joint Base Lewis McChord, Washington. This project, identified as Buildings 3221-3222 for the Multi Domain Task Force, has an estimated construction magnitude between 40 million and 70 million dollars and an expected duration of 730 calendar days. The effort is currently a small business set-aside. The scope of work involves extensive demolition and renovation, including hazardous material and debris abatement in crawl spaces, the removal of approximately 75 percent of the exterior envelope and interior walls, and the removal of 90 percent of existing mechanical and electrical systems. Required new work includes the installation of a new exterior envelope, updated mechanical and electrical systems, a new Thermoplastic Polyolefin roof system, and exterior painting. The project will also require coordination of new utility connections and management of shared construction boundaries with adjacent projects. This current notice is for survey purposes only and does not constitute a formal solicitation for proposals.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS