M & J Muni Forward Lines Phase 1 (a component of the Transit Effectiveness Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The M & J Muni Forward Lines Phase 1 Project is a transportation infrastructure initiative led by the City and County of San Francisco in collaboration with the California Transportation Commission, aimed at enhancing transit efficiency, accessibility, and pedestrian safety along San Jose Avenue and 19th Avenue in San Francisco. The project is composed of two primary components: the M Ocean View Transit and Safety Project and the J Church Safety and Accessibility Project. Key enhancements include the addition of bidirectional transit lanes on San Jose Avenue and 19th Avenue, the installation of five transit boarding islands—four of which are wheelchair-accessible—along with six transit bulbs, five pedestrian bulbs, two pedestrian refuge islands, and one sidewalk extension. Traffic signal upgrades with transit priority are planned for two intersections, along with new stop signs, spot-treatment signal improvements, and exhibition driving deterrents. The J Church segment includes three additional wheelchair-accessible boarding islands and one new transit island, while also integrating pedestrian safety measures such as rapid flashing beacons, daylighting, and traffic calming devices. Parking restoration is scheduled at Santa Ynez Avenue and Havelock Street on San Jose Avenue. All work must comply with ADA standards and has received environmental clearance under CEQA via a Mitigated Negative Declaration. The place of performance is exclusively within San Francisco, with inspection and acceptance responsibilities held by the City and County of San Francisco. No contract value, pricing data, or detailed payment terms are provided, and the procurement remains in a forecast stage with no solicitation number or formal contract type identified. The project's approval was finalized in mid-August 2025, with no defined period of performance or delivery schedule publicly disclosed. Contractual clauses, evaluation factors, packaging requirements, and offeror certifications were not included in the available documentation, indicating that this is a pre-award environmental and planning document rather than a fully executed contract. Point of contact for the project includes Sherie George, Senior Planner with the City of San Francisco, and Cherry Zamora from the California Transportation Commission.

General Info

San Francisco transit project enhances safety, accessibility with new lanes, bulbs, islands, and ADA-compliant upgrades on San Jose and 19th Avenues.

Agency

California → City and County of San Francisco

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Francisco, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for M & J Muni Forward Lines Phase 1 Project

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts2 people available
OfficeN/A
Organization / Agency
California → City and County of San Francisco
Office AddressN/A
Contacts
Cherry ZamoraAssociate Deputy Director
Sherie GeorgeSenior Planner

Full Description

Show more
The M & J Muni Forward Lines Phase 1 Project encompasses both the M Ocean View Transit and Safety Project and J Church Safety and Accessibility Project [San Jose Avenue project segment]. The M Ocean View Transit and Safety Project portion includes adding transit lanes in both directions on San Jose Avenue, bike lanes in both directions on 19th Avenue to accommodate existing bike facilities adjacent to the M train network, stop spacing changes on 19th Avenue and San Jose Avenue, five transit boarding islands, four wheelchair-accessible transit boarding islands, six transit bulbs, new traffic signals with transit priority at two intersections, new stop signs at two intersections, five pedestrian bulbs, two pedestrian refuge islands, one sidewalk extension, exhibition driving deterrent treatments, spot-treatment signal upgrades and other minor scope items as necessary. The J Church Safety and Accessibility Project (San Jose Avenue project segment) portion includes adding transit lanes in both directions on San Jose Avenue between Ocean Avenue and Cotter Street, three wheelchair-accessible transit boarding islands, and one new transit boarding island. This project portion also includes pedestrian safety improvements, such as pedestrian bulbs, traffic calming devices, rapid flashing beacons and daylighting. Parking spaces would be restored on San Jose Avenue at Santa Ynez Avenue and on San Jose Avenue at Havelock Street.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Sanibel Bridge Fender System Repairs
Solicitation # B260308JAK
Lee County, Florida, is inviting qualified contractors to submit sealed bids for the repair, rehabilitation, replacement, and restoration of the Sanibel Bridge fender system and associated marine components, including timber and composite fenders, prestressed concrete piles, pile head repairs, catwalks, navigation lighting, clearance gauges, handrails, and related structural elements. The scope of work must be fully understood and addressed according to the official specifications available exclusively on the County’s procurement portal at https://leegov.ionwave.net, and bidders are responsible for verifying all documents, addenda, and updates posted there, as submissions based on incomplete or incorrect information from other sources will not be accepted. All bids must be submitted electronically via Ion Wave or hand-delivered in a sealed envelope clearly labeled with the solicitation number B260308JAK, project title, bidder name, and contact details to the Procurement Management Division at 2115 Second Street, 1st Floor, Fort Myers, FL 33901 no later than September 9, 2026, at 7:30 PM, with electronic submissions strongly recommended to avoid technical failures. Bidders are required to complete and sign the Bid Invitation, accurately fill out all attributes and bid lines, and include all requested attachments, ensuring files are uncorrupted and fully accessible. Submissions that are incomplete, unreadable, or improperly formatted may be disqualified. All bids will be publicly opened at the same office on the deadline date and time, and selection will be based on compliance with the solicitation’s technical requirements and overall responsiveness. Questions about the solicitation must be submitted electronically through the official portal’s questions tab, and bidders are cautioned that the County bears no responsibility for internet outages or system failures, urging early submission to ensure timely receipt. The point of contact for inquiries is Jason Koza at jkoza@leegov.com or 239-533-8898, and the official posting site remains https://leegov.ionwave.net for all solicitation-related information.
Lee County

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to address per- and polyfluoroalkyl substances in the water supply. The project aims to enhance the plants' capacity to effectively remove these contaminants in compliance with evolving regulatory standards and public health priorities, requiring integrated engineering solutions across multiple disciplines. All work must be performed in California, with specific attention to local infrastructure constraints and environmental considerations. The solicitation, issued by Pyramid Building & Engineering, Inc. under number lacsd-surface-water-pfas-removal-project-no-251-ca, is open for responses until September 3, 2026, and is designated for Disadvantaged Business Enterprises as defined by the Department of Transportation. It is classified under NAICS code 237310 for water and wastewater treatment construction and seeks qualified contractors with expertise in complex treatment system implementations. Primary communication and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005, with all proposals expected to meet the required standards for DBE participation and technical delivery under the terms of the solicitation.
Pyramid Building & Engineering, Inc.

POSTED

about 12 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project, Specification No. PW 23-59
Solicitation # PW 23-59
The City of Oxnard is soliciting sealed bids for the 4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project under Specification No. PW 23-59, with bids due by 2:00 PM on September 9, 2026. The project encompasses a comprehensive range of infrastructure enhancements along 4th Street from C Street to Oxnard Boulevard, including new concrete sidewalks, curb and gutter, road and driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters, street furniture, bike lanes, landscaping, and an irrigation system, with striping improvements extending to Meta Street and the intersection with 6th Street. Additionally, approximately fifty downtown bus stops will be upgraded. Work will involve demolition of existing pavement, curbs, gutters, and sidewalks; removal and replacement of street lighting and trees; excavation and reconstruction of roadways; installation of storm drains and concrete structures; adjustment of utility covers to finished grade; placement of asphalt concrete; and final traffic striping. All work must comply with the 2018 edition of the Standard Specifications for Public Works Construction and all amendments through the 2021 edition, collectively referred to as the Greenbook. Bidders must obtain all contract documents exclusively through the City’s electronic bidding portal at Planet Bids, as the Public Purchase platform is not used for this solicitation. Questions regarding the project should not be posted on any public forum. The project is administered by the City of Oxnard’s Public Works Projects Department, and inquiries can be directed to pw-publicprojects@oxnard.org or (805) 385-8280. Bid submissions are required to be sealed and delivered by the stated deadline, and the work is to be performed entirely within the City of Oxnard, California. No set-aside designation is specified, and all prospective contractors are expected to meet the full scope of construction requirements as detailed in the contract documents.
City of Oxnard

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details