Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mailbox Only - RFQ for Engineering Services for the Temperance Mill Ditch Pedestrian Bridge and Trail Project

Open
12700757State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno's Capital Projects Department is seeking professional civil engineering services for the Temperance Mill Ditch Pedestrian Bridge and Trail Project. The scope of work involves the design and construction of a Class I trail and the widening of the bridge crossing the Mill Ditch, including a new bridge approximately 92 feet long and 93 feet wide to provide safe pedestrian and bicycle access for students and connect existing trails. The selected consultant will be responsible for preparing plans, specifications, and cost estimates, coordinating utilities, managing right-of-way acquisitions, and providing structural and geotechnical engineering as needed. The project is funded via a Congestion Mitigation and Air Quality grant administered by Caltrans on behalf of the Federal Highway Administration. The anticipated period of performance runs from March 2027 through December 2030. Selection is based on a two-stage process consisting of an initial screening of Statements of Qualifications (SOQs) followed by interviews for a short-list of at least three consultants. To be considered responsive, consultants must submit five hard copies of their SOQ by December 9, 2026. Key contractual requirements include City Council approval for contracts exceeding $100,000 and specific provisions for any subcontracts over $25,000. There is no set-aside status for this solicitation.

General Info

Fresno seeks civil engineering services for a pedestrian bridge and trail project.

Place of Performance

747 R Street 2nd Floor Fresno, California 93721, CA, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High

Read all 2 documents

Due in 18 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 18 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects Department of City of Fresno
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: Services will include preparation of necessary plans, specifications, estimates, and conducting necessary utility coordination for the project. In general, the Consultant shall be qualified and able to provide the list of services:Participate in coordination meetings with City staff and with environmentalconsultant as needed.• Participate in key stakeholder’s meetings (City, FID, FMFCD, public, etc.).• Prepare utility notification letters to various utilities and agencies.• Preparation of Utility Communication Log to be completed and updated with everysubmittal, or upon request of City Project Management Team.• Lead the effort on utility relocations, including preparing and submitting requireddocuments to various agencies.• Prepare and provide pothole exhibit based on utility research and engineers’recommendations showing potential utility conflicts.• Conduct site investigation to prepare construction documents.• Process City provided topographic survey information.• Prepare and submit necessary documents to agencies for utility relocations.• Identify and prepare required right-of-way exhibits, deeds and mapsshowing required right-of-way acquisition.• Prepare appraisal maps detailing all permanent acquisitions and anyTemporary Construction Easements.• Provide geotechnical services if required.• Provide structural engineering services as required.• Prepare construction plans, technical specifications, and constructioncost estimates at each phase of work identified in the consultant agreement.• Submit construction documents to City office for stakeholder review.• Obtain final signatures on construction documents by City and stakeholders.• As part of the bidding phase, attend the pre-bid conference, prepare addendaand clarifications if necessary, and attend bid opening.• As part of the construction phase and general construction contractadministration, attend the pre-construction conference, review shop drawingsand other contractor submittals, provide clarification of construction documentsduring construction, review and provide technical information for constructioncontract change order requests if necessary, and perform as many as two sitevisits during construction.• Prepare record drawings documents using the as-built improvements.
Bid Bond: 0.00%

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
Buckinghamshire Highways Professional Services Open Framework - Framework 2 of the 3 Complementary Highways Frameworks
Solicitation # BC/0002081
The Buckinghamshire Highways Professional Services Open Framework is a procurement by Buckinghamshire Council to establish a collective of high-performing contractors and consultants dedicated to maintaining a safe, resilient, and carbon-neutral highway network. Conducted under Section 49 of the Procurement Act 2023, this open framework scheme has a maximum total duration of eight years. The scope is divided into three discrete lots: Lot A for Commercial, Project and Procurement Support (estimated £525,000); Lot B for Scheme Design and Technical Support (estimated £2,237,500); and Lot C for Flood Schemes (estimated £520,000). The total estimated value of the framework is £3,282,500 excluding VAT. The Council intends to appoint a maximum of four suppliers per lot. The award process is conducted in two stages, beginning with a Pre-Qualification Questionnaire (PSQ) to assess legal capacity and technical ability, followed by an Invitation to Tender (ITT) for shortlisted suppliers. The final selection is based on the most advantageous tender, evaluated through a weighted scoring system consisting of 50% price and 50% quality. Quality assessments focus on technical capability, service delivery, the NEC4 Delivery Model, innovation, social value, and environmental impact. Successful bidders must maintain specific insurance levels, including £20m for Employer’s and Public Liability and £5m for Professional Indemnity. Performance is monitored via five core Key Performance Indicators (KPIs) and additional call-off specific metrics. There is no set-aside status for this procurement.
Buckinghamshire Council

POSTED

about 16 hours ago

DEADLINE

N/A
View Details

More opportunities from California → Capital Projects Department of City of Fresno

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS