Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Main Jail – Medical Flooring Replacement (Floor 2)

Closed
41009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238340
New
SLED
Pool Plastering And Tile Replacement Services
Solicitation # 26-27-21
The City of Santa Clara is soliciting bids for pool plastering, tile replacement, and coping replacement services to support its Parks and Recreation Department. The scope of work includes providing all labor, materials, and equipment for the maintenance of two pools, including a smaller pool measuring approximately 40 by 30 feet with a 22,500-gallon capacity. Key deliverables involve pool draining, surface preparation, repairs, plastering, and curing, with all replacements using new materials of like kind. All work must adhere to the City of Santa Clara Standard Details and Specifications, the 2022 California Building Code Chapter 31B, and the National Plasterers Council Technical Manual. The contract will be awarded to the lowest responsive and responsible bidder. Minimum qualifications require a valid State of California Contractor’s License (Class A, B, or C-53), at least five years of industry experience evidenced by three customer references, and registration with the Department of Industrial Relations. As this is designated as a public work, contractors must pay prevailing wages per California Labor Code Section 1770. Additional requirements include a performance bond for projects exceeding $25,000, specific commercial general liability insurance limits, and the maintenance of a detailed on-site start-up log for final acceptance. Bids must be submitted electronically via BidNet Direct by November 19, 2026.
City of Santa Clara

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract pertains to the Main Jail Medical Flooring Replacement project on the second floor, requiring the provision of all necessary labor, materials, equipment, and related work to complete the project according to specified standards. The scope emphasizes strict adherence to detailed specifications, regulatory permits, and applicable laws to ensure satisfactory completion. Quantities of work and materials stated in the contract are approximate and serve primarily for bid comparison, with actual requirements subject to adjustment by the County. Issued by the Department of General Services – Capital Projects and Construction Services Division in California, the solicitation was posted on April 30, 2026, with a response deadline of June 4, 2026. The project will be performed within California, specifically under the oversight of Sacramento County authorities. Key contacts include Joseph Caldeira as primary and Lauren Clifford as secondary points of contact, facilitating communication and coordination related to the contract. The solicitation is accessible online for interested parties to review further details and submit their proposals.

General Info

Replace second-floor Main Jail medical flooring with required materials, labor, permits by June 2026.

Documents

3

41009_Special_Provisions.pdf

PDF

B-41009_Main_Jail_Flooring_Replacement.pdf

PDF

Main Jail _ Medical Flooring Replacement _Floor 2_.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → DGS: CAPSD - Construction
Contacts2 people available
OfficeSacramento, CA, 95827, USA
Office AddressSacramento, CA, 95827, USA
Contacts
Lauren CliffordSenior Contract Services Officer

Interested Companies (23)

ConstructConnectCincinnati, OH
ReliantPlacerville, CA
Better EnterprisesFresno, CA

See All 23 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.

More opportunities from California → DGS: CAPSD - Construction

Same awarding agency

NAICS: 561730
New
SLED
Hazel Avenue At U.S. 50 Interchange Segment 1 Tree Removal Project
Solicitation # 41022
The Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project, solicitation number 41022, is a CUPCCAA project issued by the County of Sacramento. The project involves providing all labor, materials, and equipment for tree removal in Rancho Cordova, California, with an estimated construction cost of $150,000.00. The scope of work includes traffic control, the installation of 954 linear feet of ESA fencing, and the removal of trees, with stumps left two feet above grade. All debris must be hauled away and legally disposed of. To avoid nesting season, trees must be cut down before January 31st; any removals after February 1st require engineer approval and an agency survey. The contractor is responsible for field marking all trees for verification by the engineer and must ensure no damage occurs to underground facilities or existing improvements. Bids are due electronically via SacCountyEbids by November 12, 2026, at 2:00 PM, and the award will be based on the base bid only. Eligible contractors must possess a C-49 or C-61/D-49 California contractor's license and provide Certificates of Reported Compliance regarding CARB Advanced Clean Fleets regulations. The project has a completion timeframe of twenty working days and must be finished before February 1, 2027. Liquidated damages for delays are set at $2,800.00 per day. Required security includes a bid bond, certified check, or cash for 10 percent of the aggregate bid, with the successful bidder required to provide performance and payment bonds for 100 percent of the contract price. The contractor must also comply with prevailing wage rates, ADA accessibility laws, and Caltrans encroachment permit requirements.
Landscaping Services

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238210
SLED
Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System
Solicitation # 41010
The County of Sacramento is soliciting bids for solicitation number 41010 to refurbish the non-functional Raychem Tracetek leak detection system for sanitary and pressure water lines at the Main Jail facility located at 651 I Street. The project involves replacing the leak detection panel in the basement and refurbishing water sensing cables, zone connectors, leader cables, and control monitoring modules within pipe chases. The system must be integrated with the facility building management system for alarm and fault monitoring. The estimated construction cost is 148,590.00 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. The work must be completed within 90 calendar days and requires a C-7 Low Voltage Systems Contractor license and technicians certified by the system manufacturer. Due to the secure nature of the correctional environment, the project is subject to strict security protocols. All personnel must pass background checks, be escorted while onsite, and coordinate activities with the Sacramento Sheriff Organization. Work on the second and third floors is restricted to the hours of 12pm to 4pm. Safety requirements include the use of N95 or P-100 respirators in designated pipe chases. Bidders must submit responses via the SacCountyEbids portal by November 5, 2026. The successful contractor is required to provide performance and payment bonds for 100 percent of the contract price and submit as-built drawings and test results for final acceptance.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

15 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS