Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Main Street WTP, Filter System Upgrade III

Closed
RFB-27-014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include site improvements, stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide bid security, evidence of authority to sign, and M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. The successful contractor is required to furnish performance and payment bonds equal to the contract price and maintain insurance from companies with an A.M. Best rating of A-VII or better. Project administration follows EJCDC standards, with payments processed monthly via applications for payment submitted to the Engineer, and final acceptance contingent upon the Engineer's written recommendation.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with strict adherence to OSHA and ADA requirements. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, submission of a bid guarantee, and the provision of performance and payment bonds equal to 100 percent of the contract amount. Additionally, the project is subject to Davis-Bacon wage determinations and requires compliance with various federal executive orders regarding non-discrimination and the use of American Iron and Steel.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Main Street WTP Filter System Upgrade III (CIP Project No: 0037-Water10) is a Design-Bid-Build construction project for the City of Yuma, Arizona. The scope of work involves the rehabilitation and upgrade of Filters 9, 10, 11, and 12 at the Main Street Water Treatment Plant. Key activities include the demolition of obsolete conduit, wiring, instrumentation, controls, process valves, flow meters, underdrains, and filter media. The contractor is responsible for installing a new underdrain system, specified media, electric process valves with actuators, turbidity meters, and a backwash blower with associated piping and foundations. Additionally, the project requires integrating PLC/HMI/SCADA systems, alarms, and interlocks while maintaining plant operations through filter-by-filter sequencing and temporary isolation. The contract will be awarded to the lowest responsive and responsible bidder based on a combination of lump sum and unit prices. Performance timelines require substantial completion within 270 calendar days and final completion within 300 calendar days from the Notice to Proceed. The contractor must provide a payment bond for the full contract price and a minimum one-year warranty on installed equipment. Compliance requirements include adherence to the Americans with Disabilities Act, the Drug Free Workplace Act of 1989, and the Immigration Reform and Control Act of 1986. Deliverables include the execution of QA/QC testing, commissioning, as-built drawings, O&M manuals, and staff training.

General Info

City of Yuma filter system upgrade project with 300-day completion and bidding requirements.

Documents

6
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first946 pages · specifications
High
PDF, High priority: read this first10 pages · contract-document
High
PDF, High priority: read this first69 pages · rfb
High
PDF, Low prioritybid-bond-form
Low
PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City Of Yuma
ContactsNo contacts available
OfficeAZ, USA
Organization / AgencyArizona → City Of Yuma
Office AddressAZ, USA
ContactsNo contact information available

Interested Companies (52)

11427725 CanadaToronto, Ontario
Arizona Builder's Exchange
ASR Construction

See All 52 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Phase III of the Main Street WTP Filter Rehabilitation & Upgrade includes select demolition of obsolete conduit and wiring, instrumentation and controls, process valves and flow meters, existing underdrain, and filter media; furnishing and installing a new underdrain system compatible with air/water distribution; placing specified media; installing new process valves with actuators, turbidity meters, and a backwash blower with associated piping, foundations, and miscellaneous civil/site repairs; replacing power/conduit and integrating PLC/HMI/SCADA, alarms, and interlocks; maintaining plant operations via filter-by-filter sequencing, temporary isolation, and startup-to-waste; executing QA/QC, testing, and commissioning (underdrain distribution, valve stroke, blower performance, turbidity calibration, and filter run/backwash verification); delivering submittals, as-builts, O&M manuals, and training; and complying with safety, environmental, and regulatory requirements, with a minimum one-year warranty on installed equipment.

More opportunities from Arizona → City Of Yuma

Same awarding agency

NAICS: 561790
New
SLED
Cooling Tower Chemical Treatment & Testing Services
Solicitation # RFB-27-158
The City of Yuma is soliciting a qualified contractor to provide comprehensive cooling tower chemical treatment, water testing, and maintenance services for five facilities: the Yuma Police Department, Yuma Civic Center, Yuma Art Center, Yuma Figueroa Plant, and the City Prosecutors Office. The primary goal of the contract is to prevent system fouling caused by scale formation, corrosion, and biological growth across chiller systems, hot water systems, and condenser loops. The scope of work includes scheduled monthly visits, the provision of all necessary non-chromate chemicals, operator training, and emergency availability. The contractor must ensure all chemicals comply with Waste Control Standards and local sanitary sewer regulations, and all transport equipment must meet Department of Transportation requirements for hazardous materials. This is a firm-fixed-price annual contract with an initial 12-month term and the possibility of four additional one-year renewals. Award will be granted to the lowest responsible and responsive bidder based on factors including conformity to specifications, past performance, and financial capability. The contractor is required to provide a one-year warranty on work performed and must name the City of Yuma as an additional insured on all insurance policies. Administrative requirements include submitting invoices to the City Finance Department for payment within 30 days and maintaining a notebook of material safety data sheets and product bulletins. Bids must be submitted electronically via the City's Bonfire Procurement Portal.
Other Services to Buildings and Dwellings

POSTED

5 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS