Main Terminal Improvement Program Emergency Power

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Seattle's Aviation Project Management Group is soliciting proposals for the Main Terminal Improvement Program (MTIP) Emergency Power project. The primary objective is to develop a 30-percent design bridging document to facilitate the future procurement of a design-build team. The scope involves providing emergency power loads compliant with National Electrical Code Articles 700, 701, and 702 for the Main Terminal, Parking Garages, and the C Concourse Expansion and South Concourse Evolution projects. The project focuses on medium voltage generation and distribution for 24/7/365 facilities and requires managing complex phasing within an active airport environment. To ensure a fair transition to the construction phase, the firm selected for this design work will be excluded from competing for the subsequent design-build portion of the project. The contract has an initial performance period of two years with a total value not to exceed 3,348,000 dollars. Work is authorized via Service Directives on either a firm fixed price or time and expense basis. Proposals are due by August 6, 2026, and will be evaluated based on specialized experience, technical competence, and interview performance. The Port has established an aspirational goal of 15 percent WMBE participation and requires a detailed Diversity in Contracting Inclusion Plan. Selected consultants must adhere to strict reporting requirements for subconsultant payments and maintain compliance with Washington State public disclosure laws and federal non-discrimination regulations.

General Info

Install emergency power systems at Port of Seattle terminal to ensure backup power for life safety and critical operations.

Agency

Port of Seattle → Aviation Project Management Group

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPort of Seattle → Aviation Project Management Group
Contacts2 people available
OfficeWA
Organization / Agency
Port of Seattle → Aviation Project Management Group
Office AddressWA
Contacts
Josephine WilsonPort Contact
Kris CasselmanProject Manager

Full Description

Show more
The Port of Seattle’s Main Terminal Improvement Program (MTIP) – Emergency Power project is to provide National Electrical Code (NEC) Articles 700, 701, and 702 emergency power loads to the to the Main Terminal, C Concourse Expansion, South Concourse Evolution, and Parking Garages. The C Concourse Expansion and South Concourse Evolution projects will tie into this Emergency Power. The outcome of this procurement is a 30-percent design document (aka “bridging document”) that will be used to procure a design-build team. The winning bidder on this procurement will be excluded from competing for the design-build portion of the project in all aspects.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS