Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintain Exterior Finishes

Closed
A063822Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a firm-fixed price construction contract issued by the Department of Veterans Affairs Network Contracting Office 4 for the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11 at the Wilmington VA Healthcare System in Delaware. The project has an estimated magnitude between $250,000 and $500,000 and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes demolition of existing roofing and insulation, installation of 60 Mil Elevate RubberGard EPDM LS-FR white low-slope fire retardant roofing material or equivalent, and the repair of roof drains. The completed installation must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. Award will be granted to the responsive and responsible bidder offering the lowest price. Eligible bidders must be registered in SAM, VETCERT, and the VETS-4212 database. The contractor is required to provide performance and payment bonds and adhere to Davis-Bacon Act Wage Determination DE20260008. Strict safety standards are mandated, including the presence of an OSHA-certified competent person on-site and 10-hour OSHA certification for all employees. Performance must begin within 10 calendar days of award and be completed within 30 calendar days, with work performed Monday through Friday from 7:00 AM to 5:00 PM. Following multiple amendments, the final bid opening was rescheduled for October 21, 2026.
244-NETWORK Contract Office 4 (36C244)

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 8 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract pertains to exterior improvements at Malmstrom Air Force Base in Montana under the solicitation number A063822, issued as a sources-sought notice under a Small Business Set-Aside for total small business participation, with the NAICS code 236220 for building construction. It operates under an IDIQ (Indefinite-Delivery, Indefinite-Quantity) contract vehicle and calls for comprehensive maintenance, repair, and replacement of exterior building components across Structures 400 and 1448. Work includes window and door replacement, masonry and parapet wall repair, siding and EIFS fixes, soffit and fascia maintenance, and overhead door installations, all requiring strict adherence to Unified Facilities Criteria (UFC) for general requirements, security, and environmental protection, along with compliance with OSHA, the International Building Code, and Air Force security directives. Performance must be completed within 45 days of delivery order issuance, following a mandatory two-week processing period for the AF Form 103 Work Clearance Request, which remains valid for up to 90 days. Contractors must comply with stringent security and anti-terrorism protocols, including mandatory Level I AT Awareness Training within 30 days of base access and adherence to Force Protection Conditions. All personnel require government-issued badges and must be included in an Entry Authority List submitted 14 days in advance. Photography or documentation of government property is prohibited without written consent, and no visual records may be retained. Pre-construction assessments for asbestos and lead paint are required, triggering contract modifications if abatement is necessary. Daily site cleanup and debris removal are mandatory, with all removed materials becoming the contractor’s property unless designated for government salvage. The contractor must submit a DD Form 1354 Property Inventory Checklist 10 days prior to final inspection and obtain government approval before ordering materials, ensuring compatibility with existing finishes. Payment and invoicing methods are not specified, and while the 341st Contracting Squadron oversees the contract, no named COR, COTR, or PCO is identified. The award methodology is inferred to be Low Price Technically Acceptable due to the nature of the scope and set-aside designation, though not explicitly confirmed. All submissions must be in Microsoft Word format and delivered through SAM.gov or an Air Force procurement portal by the deadline of June 17, 2026.

General Info

Exterior improvements at Malmstrom AFB including repairs, painting, door replacements; small business set-aside.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

0, MT, 59402, USA

Set-Aside

SBA

Documents

4

NZAS 210053A Exterior Improvements IDIQ Statement of Work

PDF, High priority: read this firstsow
High

As-built details

PDF, Low priorityother
Low

BLDG 400

PDF, Low priorityother
Low

BLDG+1448.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Jun 17, 2026 to Aug 14, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4626 341 Cons Lgc
Contacts2 people available
OfficeMALMSTROM AFB, MT, 59402-6863, USA
Office AddressMALMSTROM AFB, MT, 59402-6863, USA

Full Description

Show more

Project titled “Exterior Improvements Seed Project” includes constructing, maintaining and repairing the exterior of buildings and structures around Malmstrom Air Force Base.


Work may include window replacement/installation, exterior painting, masonry repair, soffit and fascia repair, parapet wall repair, siding repair, exterior insulation and finish system (EIFS) repair, overhead door replacement, exterior man doors replacement and other work associated with maintenance and repair on the exterior of buildings and structures.

More opportunities from Department Of Defense → FA4626 341 Cons Lgc

Same awarding agency

NAICS: 562111
New
Federal
FY27 Base Refuse
Solicitation # MALMSTROM_BASE_REFUSE
The 341st Contracting Squadron at Malmstrom Air Force Base, Montana, is conducting market research via a Sources Sought notice to identify capable commercial vendors for base-wide integrated solid waste management collection and recycling services. This requirements contract, categorized under NAICS code 562111, involves the weekly collection and disposal of municipal solid waste and recycling, the provision of 10-yard containers for concrete and asphalt debris, and the management of waste containers for special events. The government is specifically seeking to determine if the acquisition can be set aside for small businesses, with a strong emphasis on 8(a), HUBZone, SDVOSB, and WOSB concerns. The contractor will be responsible for providing all necessary personnel, equipment, and supervision, and must obtain a Class D motor carrier certificate per Montana state law. Key performance requirements include responding to unscheduled pickups within one business day and adhering to strict safety and regulatory standards, including OSHA and FAR 52.222-50 regarding combating trafficking in persons. Performance will be monitored by the Contracting Officer or Representative through task validation, report reviews, and customer complaint investigations. Interested vendors must submit a capability statement outlining their business size status and operational experience by October 26, 2026.
Solid Waste Collection

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 236220
Federal
Vertical Construction Multiple Award Contract (MAC)
Solicitation # FA4626-26-R-0007
The Vertical Construction Multiple Award Contract (MAC) is an indefinite-delivery indefinite-quantity (IDIQ) vehicle established by the 341st Contracting Squadron to provide design-bid-build and design-build services for military renovation and construction projects. The scope primarily supports Malmstrom Air Force Base, including its Launch Facilities, Missile Alert Facilities, and Weapons Storage Area in Montana. Work includes the repair, renovation, alteration, and demolition of vertical structures and critical building systems such as HVAC, plumbing, electrical, and fire suppression. The contract is a total small business set-aside under NAICS code 236220, with an estimated overall ceiling of 99,999,999.99 and an aggregate capacity not exceeding 50,000,000. The government intends to award approximately eight contracts with individual task order values ranging from 2,000 to 3,000,000. The contract structure consists of a five-year initial ordering period with a two-year option, allowing for a total potential duration of seven years. An initial seed project is planned for the DSN/CSN Repair Bldg. 1082 HVAC project at Malmstrom AFB, which involves developing conceptual courses of action for backup cooling and humidification, progressing to a 100 percent Type B design. The seed project has a performance period of 242 calendar days from the notice to proceed, with construction beginning after the acceptance of the 65 percent design. Inspection and acceptance will be conducted by the government at the destination sites within Montana.
Commercial and Institutional Building Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS