Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 12, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance Dredging of the Houston Ship Channel, Texas Redfish Reef to Beacon 78 Hopper Dredging in Chambers County, TX Hopper, Deep Draft

Awarded
W912HY19B0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 17 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This unrestricted, firm fixed price contract involves the maintenance dredging of the Houston Ship Channel from Redfish Reef to Beacon 78 in Chambers County, Texas. The project requires the hopper dredging of approximately 1.5 million cubic yards of material for placement into an Ocean Dredged Material Disposal Site, with an estimated production rate of 500,000 cubic yards per month. The estimated value of the effort ranges between 10 million and 25 million dollars, with a projected completion time of 180 calendar days. The procurement falls under NAICS code 237990, with a small business size standard of 27.5 million dollars. To qualify as a small business, firms must perform at least 40 percent of the dredging volume using their own equipment or equipment from another small dredging concern. Awarded contractors must provide performance and payment bonds within 10 days of the award and commence work within 10 days of the Notice to Proceed. Failure to meet the completion schedule will result in liquidated damages.

General Info

Contract Value

$31,298,995.96

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Chambers County, TX, USA

Set-Aside

NONE

Award Issued Date

Documents

6

AMEND-0002_W9126HY19B0018.pdf

PDF

Amendment_0001.pdf

PDF

Amendment_0002.pdf

PDF

C1_FINAL-SIGNED-ABSTRACT_W912HY19B0018.pdf

PDF

W912HY19B00018-Plans.pdf

PDF

W912HY19B0018_Specs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jun 19, 2019 to Jun 24, 2019.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
Contacts2 people available
OfficeGALVESTON, TX, 77550-1229, USA
Office AddressGALVESTON, TX, 77550-1229, USA
Contacts
Kirsten SneadContract Specialist
Curtis ColleContract Officer

Full Description

Show more
FULL DESCRIPTION OF THE PROJECT TO INCLUDE: 1. Dredging - Maintenance Dredging of HSC Redfish Reef to Beacon 78 Hopper dredging of approximately 1.5 MCY of maintenance material with placement into Ocean Dredged Material Disposal Site (ODMDS). 2. Options Turtle trawling options are concurrent. 3. Estimated production rate: 500,000 Cubic Yards/month 4. Estimated magnitude for this effort is estimated between $10,000,000.00 and $25,000,000.00. 5. NAICS Code 237990, Other Heavy and Civil Engineering Construction, Dredging 6. SB Size Standard, $27.5M for dredging. To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern. 7. PSC Code - Z2KF 8. Bonding Requirements - The Contractor will be required to provide the Performance and Payment Bonds within (10) calendar days after award. The contractor shall begin work within (10) calendar days after acknowledgement of the Notice to Proceed. 9. Furnish pre-award documents within 5 working day after Bid Opening. 10. Completion Time for Schedule No. 1 for this project is estimated at 180 calendar days. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in an amount to be determined for each calendar day of delay until the work is completed or accepted. Prior Government contract work is not required for submitting a response under this sources sought synopsis. The Solicitation issued will be Firm Fixed Price. This solicitation is subject to the availability of funds. The Solicitation is an UNRESTRICTED Procurement. The Solicitation will be issued on or about 20 May 2019. Response date on or about 19 June 2019. ATTENTION TO OFFEROR(s): On July 14, 2014, Small Business Administration (SBA) increased the monetary-based industry size standards to account for inflation. You must update you Representations (Reps) and Certifications (Certs) for the impacted North American Industry Classification System (NAICS) codes identified with an exclamation point "!"next to the "Small Business" value in the System for Award Management (SAM). Please log into SAM, review, and resubmit your registration to apply the new size standard. The North American Industrial Classification System (NAICS) Code applicable to this project is 237990. The Small Business Size Standard is $27.5 Million. NAICS code 237990 - Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern. All offerors are encouraged to visit the Army's Single Face to Industry Website at Federal Business Opportunities at https://www.fbo.gov to view and download the plans, specification and or any amendments for this procurement. Plans and specifications will not be available in paper format or on compact disc. To register as an "Interested Vendor", visit https://www.fbo.gov. Offerors must be registered with the SAM, Systems for Award Management, in order to receive a Government contract award. To register, the SAM address is: https://www.sam.gov/portal/public/SAM/ . The Contract Specialist for this solicitation will be Kirsten Snead, at email contact@example.gov or phone +1 (555) 000-0000 between the hours of 8:00 AM to 4:00 PM, Monday through Friday, excluding Federal Holidays. Email is preferred. Subcontracting goals for the Galveston District are: 41.5% - Small Business; 23.5% - Small Disadvantaged Business; 7.5% - Woman-Owned Small Business; 7.92% - HubZone Small Business; 5.18% - Veteran-Owned Small Business and Service Disabled Veteran-Owned Small Business; Historically Black College or University/Minority Institution - 2%.

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Solicitation # W912HY26BA019
Solicitation W912HY26BA019 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Galveston District, for maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway, including the channel to Port Bolivar, in Texas. The project focuses on addressing shoaling within tributary channels across Chambers, Galveston, and Brazoria Counties. The scope is divided into a primary schedule involving approximately 959,000 cubic yards of dredging, with five optional work items including the Galveston Alternate Route, Offatts Bayou Channel, Bolivar Ferry Channel, and beneficial use placement at Joycelyn Nungaray. All dredged material is to be disposed of in designated nearby placement areas. The contract requires performance of the primary schedule within 165 to 270 calendar days following the Notice to Proceed. Bidders must provide a bid guarantee of 20 percent of the offer or 3 million dollars, whichever is less, and furnish 100 percent performance and payment bonds upon award. Award will be based on the responsible bidder offering the most advantageous price and price-related factors. Contractors are required to utilize the Resident Management System Contractor Mode and the Construction Management Platform for administration and reporting, and must submit all payment requests electronically via Wide Area WorkFlow. Compliance with the Buy American Act, prevailing wage requirements, and specific subcontracting goals for VOSB and SDVOSB entities is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
FY27 Texas City Ship Channel Main Channel and Turning Basin
Solicitation # W912HY27X1CT1
The U.S. Army Corps of Engineers, Galveston District, is conducting a sources sought synopsis for the FY27 Texas City Ship Channel Main Channel and Turning Basin maintenance dredging project. This preliminary planning effort seeks to identify capable and qualified industry partners, including various small business categories such as 8(a), HUB-Zone, SDVOSB, and WOSB. The scope of work involves performing maintenance dredging using a pipeline, hopper, or mechanical dredge, with an estimated construction price range between 10 million and 25 million dollars. The project is expected to have a completion timeframe of 240 calendar days, with an anticipated award date in August 2027. Interested firms must be registered in SAM.gov and provide their UEI and CAGE codes. Responses are due by November 7, 2026, and must include evidence of technical competence, such as three examples of comparable projects completed within the last five years and proof of bonding capacity, including a 20 percent bid bond and 100 percent performance and payment bonds. All work must comply with the USACE Safety and Health Requirements Manual EM 385-1-1 and applicable federal, state, and local regulations. The procurement falls under NAICS code 237990 and is subject to FAR 52.219-14 limitations on subcontracting.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou
Solicitation # W912HY27RA001
The Houston Ship Channel Expansion Channel Improvement Project 11, Package 9, Segment 4 is a construction effort managed by the US Army Engineer District Galveston to widen and deepen the main channel from Boggy Bayou to Sims Bayou in Harris County, Texas. The scope of work includes widening the channel to approximately 530 feet and deepening it from -41 feet to -46.5 feet. Key activities involve the conveyance and placement of dredged material into the Beltway 8, East Clinton, and West Clinton areas, the removal of abandoned pipelines and a steel bulkhead, and the installation and removal of temporary discharge pipelines. The project is estimated to be valued between 100 million and 250 million dollars. This is an unrestricted Firm-Fixed-Price contract awarded via the Lowest Price Technically Acceptable procedure. The base contract must be completed within 477 calendar days of the Notice to Proceed, with a total potential duration of 603 days if all five options are exercised. Options include additional dredging, pipeline management, and site improvements such as hydroseeding and aggregate surfacing at the Beltway 8 placement area. Proposals are evaluated based on technical approach, schedule, and past performance, with a requirement for a bid bond of 20 percent or 3 million dollars, whichever is less. Performance is subject to the Davis-Bacon Act, Buy American requirements, and strict quality control through a three-phase management process.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Solicitation # W912HY26BA018
The FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging project is an unrestricted sealed bid solicitation issued by the US Army Engineer District Galveston. The project involves maintenance dredging of the Houston Ship Channel adjacent to the Bayport Flare and the Bayport Flare adjacent to the Bayport Ship Channel across Galveston, Harris, and Chambers Counties, Texas. Dredged materials are to be transported to and disposed of in Ocean Dredged Material Disposal Site zones D and F. The estimated price range for the project is between $25,000,000 and $100,000,000, with a performance period requiring work to commence within 10 calendar days of the notice to proceed and reach completion within 85 calendar days. Key technical requirements include the use of hopper dredging and adherence to the USACE National Dredging Quality Management Program. Contractors must implement an Endangered Species Protection Plan, specifically regarding sea turtle protection and relocation, which are listed as option line items. Contract administration will be managed through the Resident Management System and the Construction Management Platform for handling Controlled Unclassified Information. Bidders are evaluated based on total price and qualifications, with a 10 percent price evaluation preference granted to HUBZone small business concerns. Payments are processed electronically via the Wide Area WorkFlow system under fixed-price construction terms.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS