Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on March 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maintenance of Traffic US 50 (Ocean Gateway)

Closed
MOTUS50State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

about 23 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Salem Twp- T-16 Culvert Washout Replacement
Solicitation # 49913
The Salem Township T-16 Culvert Washout Replacement project involves the emergency repair of a culvert washout on Duck Creek Road in Whipple, Ohio. The scope of work requires the contractor to provide all labor, equipment, and materials to replace the existing washout with a pre-cast concrete four-sided box culvert. The project is governed by the 2023 Ohio Department of Transportation Construction and Materials Specifications and the requirements of the Washington County Engineer. The estimated project cost is $91,527.00, and the contract will be awarded to the lowest and best bidder, provided the bid does not exceed the estimate by more than 10 percent. All work must be completed by April 1, 2027, with a one-year guarantee against defects following final payment. Contractors must adhere to strict regulatory requirements, including Ohio Prevailing Wage Laws, the Ohio Bureau of Worker’s Compensation Drug-Free Workplace Program, and Ohio preference for local products and labor. Required deliverables for the pre-construction meeting include a subcontractor list, a construction schedule, and road closure estimates. The contractor must provide a bid guaranty and, if necessary, a performance bond. Additionally, the project mandates compliance with various federal non-discrimination acts and requires the submission of certified payrolls and proof of Ohio workers' compensation coverage. The Township serves as the sole judge of the quality of materials and workmanship, and the pre-cast box culvert must be installed within a single day after coordinating with the county.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract involves providing maintenance of traffic (MOT) to manage vehicle flow at the intersection of Route 8 and Ocean Gateway, specifically redirecting traffic from the last entrance ramp onto Ocean Gateway westbound to earlier ramps. This effort aims to reduce congestion on US18 and facilitate smoother access onto the Chesapeake Bay Bridge. The contractor is responsible for deploying at least two crash attenuators, a pickup truck with amber lights, and maintaining a work crew of at least three personnel, including one certified Traffic Manager. The Maryland State Highway Administration (SHA) will supply additional traffic control equipment such as variable message signs, barrels, barricades, and cones. Work is scheduled primarily on weekends from 11 AM to 8 PM, with additional hours before and after to manage signage, totaling approximately eleven billable hours per day, with potential work on Mondays during holiday periods. Key tasks include placing traffic attenuators at specific lanes, closing certain turn lanes, setting up barricades, staffing a truck with amber lights at the on-ramp, and flipping signs to direct traffic flow. Billing will be hourly and may be adjusted based on traffic conditions, with the possibility of early dismissal or extension. Bids must be submitted via mail or delivery, with no electronic submissions accepted, and inquiries directed to the Maryland Department of Transportation District Office. The contract aims to improve traffic flow and safety at this critical intersection, supporting efficient transportation operations in Maryland.

General Info

Documents

1
PDF, High priority: read this first9 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland State Highway Administration - District 2 - Office
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kyle O'DONNELL

Full Description

Show more
            Provide maintenance of traffic (MOT) to redirect traffic from the last entrance ramp at the intersection of Route 8 onto Ocean Gateway westbound to earlier entrance ramps to alleviate traffic on US18 and improve flow onto the Chesapeake Bay Bridge.  The contractor will provide a minimum of (2) crash attenuators, one (1) pickup truck with amber lights.  Minimum work crew size is three (3).  One person shall be certified as a Traffic Manager.  The State Highway Administration (SHA) will supply variable message signs (VMS), barrels, barricades, and/or cones.            Billing will be on an hourly rate basis, subject to traffic conditions at the direction of MDOT SHA D2 Office and could result in early dismissal or an extension.  A typical workday will have maintenance of traffic in effect from 11 AM to 8 PM on Saturdays and Sundays.  Plus, one (1) hour before and one (1) hour after to open / close approximately fifty signs currently deployed leading up to the MOT site.  In this example, that would be eleven billable hours per day.  There is a possibility of maintenance of traffic on Mondays during 3-day holidays.            Specific tasks include placing traffic attenuators at the left turn lane on Route 8 north, closing the entire 445 feet right turn lane from Route 8 south, setting up barricades and a staffed truck with amber lights at the on-ramp onto Ocean Gateway, and flipping signs.            Please mail in or deliver your bids.  Do not email, upload, fax, or call in your bid.  If you have any questions, call the District Office at +1 (555) 000-0000, ask for John Lancaster, and reference the MOT of Bridge Traffic.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS