Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mallory Street Drainage Improvements

Closed
Construction Bid 17090-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Mallory Street Drainage Improvements project is a comprehensive infrastructure enhancement initiative undertaken by the City of Jacksonville, Florida. The scope of work includes cleaning and CCTV inspection of existing drainage inlets and pipe systems leading to the outlet on the St. Johns River. Additionally, the project involves milling and resurfacing Mallory Street to improve roadway conditions and the installation of porous pavement to enhance stormwater management and reduce runoff. The contract emphasizes the need for all necessary labor, materials, and equipment to complete these tasks efficiently, with a project timeline of 90 days from the notice to proceed. The solicitation, identified as Construction Bid 17090-25, was posted on September 26, 2025, with a response deadline of October 30, 2025. The project is estimated to be valued between $500,000 and $1,500,000 and is managed under the NAICS code 237310, which pertains to highway, street, and bridge construction. The primary point of contact is Benjamin Kemp, reachable via email at [email hidden] or by phone at [phone hidden]. The bidding process is formal, requiring sealed bids with specific submission instructions, insurance, and surety requirements. The project aims to improve drainage and roadway conditions within a tight timeframe, ensuring enhanced stormwater management and infrastructure resilience in the area.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first51 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Jacksonville
Contacts1 person available
OfficeN/A

Full Description

Show more
Work consists of furnishing all labor, materials, and equipment and performing all operations necessary to clean and perform CCTV of existing drainage inlets and pipe system to the outlet on the St. Johns River, Mill and Resurface Mallory Street, and furnish and install porous pavement. Project completion within 90 days from notice to proceed.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS