Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on August 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Manufacture of Heavy-Duty Equipment Weather Covers

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract opportunity with the Department of Defense involves the manufacture of 13 custom-sized, weather-resistant covers for heavy-duty equipment, specifically M832 Mobilizers, Mobilizers with Flat Beds, and 5-Ton M1089A1P2 Wrecker Cranes. The selected provider must utilize industrial sewing or welding equipment for heavy-duty textiles to meet specific dimensional requirements. This is a total Small Business Set Aside under NAICS code 314999. Eligible contractors must possess a valid CAGE code and UEI, and all deliverables must comply with the Buy American Act. The response deadline for this requirement is September 14, 2026.

General Info

DoD small business contract for 13 custom heavy-duty equipment covers by September 14, 2026.

NAICS

314999 - All Other Miscellaneous Textile Product Mills

Place of Performance

KS, 67221, USA

Set-Aside

SBA

Documents

This scope was carved out of W50S7X26QA007.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Equipment Weather Covers

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7M9 Uspfo Activity Ksang 184
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies custom-sized, weather-resistant covers for prime contractors on Department of Defense equipment projects. Fabricates covers for M832 Mobilizers, Mobilizers with Flat Beds, and 5-Ton M1089A1P2 Wrecker Cranes to specific dimensional requirements using industrial sewing or welding equipment for heavy-duty textiles. Requires CAGE code, UEI, and Buy American Act compliance. Delivers 13 finished weather covers.

More opportunities from Department Of Defense → W7M9 Uspfo Activity Ksang 184

Same awarding agency

NAICS: 335311
New
Federal
Switchgear Transformer Replacement
Solicitation # W50S7X27Q0001
Solicitation W50S7X-27-Q-0001 is a 100 percent Small Business Set-Aside under NAICS 335311 for the 184 Kansas Air National Guard at McConnell AFB, Kansas. The requirement is for the procurement and installation of one 112.5 kVA dry-type control power transformer and three 20 Amp current-limiting power fuses to replace existing equipment in the Building 16 indoor switchgear. The contractor is responsible for the full scope of work, including removal, rigging, reconnection, coordination of electrical shutdowns, and final NETA acceptance testing. The equipment must meet or exceed the specifications of the existing GE ITI transformer and GE Type EJ-0-1C fuses, with specific enclosure dimensions of 33 inches wide by 90 inches high by 54 inches deep and a preferred stubs up termination configuration. The government will award a single firm-fixed price contract to the lowest price responsible offeror that meets the technical requirements. Evaluation is based equally on price reasonableness and a technical capability statement, which is limited to two pages. Delivery and installation are desired within 180 days after receipt of order at Building 42, McConnell AFB. Quotes must be submitted electronically to the contracting office by November 23, 2026, and must include the offeror's CAGE code, Unique Entity ID, and a quote acceptance period of at least 60 days. All offerors must be registered in the System for Award Management and comply with applicable FAR and DFARS clauses, including prohibitions on covered defense telecommunications equipment.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS