Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Manufacture of Precision Thread Plug Gages (SBG-622, SBG-623)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract involves the manufacture of precision thread plug gages, specifically models SBG-622 and SBG-623, for prime contractors supporting Army Contracting Command - Rock Island projects. The work requires the production of GO thread plug gages using high-grade tool or gage steel, strictly adhering to Drawing 12576070 and Drawing 11636260RIA. The manufacturer must utilize precision CNC machining and calibration equipment to ensure all products meet strict dimensional tolerances before delivery to the Rock Island Arsenal. This project falls under NAICS code 332999 and is managed by the Department of Defense.

General Info

Manufacture precision thread plug gages SBG-622 and SBG-623 for Army Contracting Command.

Agency

Department Of Defense → W6QK Acc-RiView Agency

NAICS

332999 - All Other Miscellaneous Fabricated Metal Product ManufacturingView NAICS

Place of Performance

Rock Island, IL, 61299, USA

Set-Aside

NONE

Documents

This scope was carved out of W519TC-26-Q-A195.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BASE OPS - M178/M127/M182 GAGES SBG-622, SBG-623

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Ri
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W6QK Acc-Ri
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manufactures precision thread plug gages for prime contractors on Army Contracting Command - Rock Island projects. Machines GO thread plug gages strictly following Drawing 12576070 and Drawing 11636260RIA using high-grade tool or gage steel. Utilizes precision CNC machining and calibration equipment to meet strict dimensional tolerances. Delivers finished, calibrated SBG-622 and SBG-623 gages to the Rock Island Arsenal.

More opportunities from Department Of Defense → W6QK Acc-Ri

Same awarding agency

NAICS: 333517
New
Federal
Cincinnati Lathe MO Retrofit
Solicitation # W519TC-26-Q-A181
The Army Contracting Command-Rock Island is soliciting a firm fixed price purchase order for the electrical retrofit of a Cincinnati Lathe MO 530U18-88-013 located at the Rock Island Arsenal Joint Manufacturing and Technology Center in Illinois. This total small business set-aside requires the contractor to engineer, procure, manufacture, install, and debug an electrical retrofit package featuring a FANUC Oi-TF Plus Control series with a 15 inch LCD color display, updated servo and spindle motors, and new wiring and enclosures. The contractor is also responsible for PLC programming, providing operator training, and ensuring all components meet NEMA labeling standards. The overall period of performance shall not exceed 34 weeks after contract award, with a general delivery date of November 1, 2026. Award will be granted to the lowest priced, responsive, and responsible vendor following a technical review for acceptability. Key performance requirements for final acceptance include the ability to execute cuts exceeding six feet in length with a dimensional tolerance of plus or minus 0.0005 inches. Contractors must provide a Certificate of Conformance for all items and adhere to OSHA safety standards for arc flash and lockout/tagout. Payment will be processed electronically via Wide Area Workflow, with invoices submitted within 30 business days of work completion. Quotes are due by 6 PM on September 17, 2026, and must include shipping to the Rock Island Arsenal.
Machine Tool Manufacturing

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Federal
Install Utilities - RV Campground Site - Rock Island Arsenal (Amendment 0003)
Solicitation # W519TC-26-R-A072
The Army Contracting Command - Rock Island is soliciting proposals for a commercial firm-fixed-price construction contract to install utilities for a new RV campground site at the Rock Island Arsenal in Illinois. This 100% small business set-aside project involves the installation of an 8-inch HDPE water main with a fire hydrant, a 1-inch gas main with a meter, and a 13.8 KV overhead electrical service leading to a 750 KVA transformer. The work must adhere to the 2026 Iowa State Urban Design and Specifications Program (SUDAS) and USACE EM 385-1-1 (2024) safety standards. The contractor is required to complete the project within 180 working days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per calendar day of delay. Proposals are due by September 15, 2026, and must include a total firm-fixed-price bid, a high-level project schedule, resumes for a Quality Control Manager and Site Safety and Health Officer, and evidence of past performance on similar utility projects. The government will award the contract based on the best overall value, conducting a comparative analysis of price, schedule, personnel, and past performance. Required responsibility documents include a bid bond of 20 percent of the bid price or 3 million dollars, whichever is less, and proof of current contractor licensing. Payment will be processed electronically through the Wide Area WorkFlow system.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS