Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Manufacturing Readiness Assessment (MRA) and Production Support

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332996
New
DIBBS
COUPLING ASSEMBLY, QUIC
Solicitation # SPE7M3-26-T-8776
Solicitation SPE7M3-26-T-8776, issued by the Department of Defense DLA Land and Maritime Fluid Handling Division, seeks quotes for five aluminum quick disconnect coupling assemblies under NSN 4730-00-145-7362. The procurement is subject to a delivery timeframe of 157 days after the order, with a designated need ship date of February 16, 2027, and a final required delivery date of November 11, 2027. Delivery and acceptance are set for destination at DLA Distribution San Diego. The government may utilize an automated award process, and a price evaluation preference is available for certified HUBZone small business concerns. Offers utilizing additive manufacturing are ineligible for award without prior approval. The contract is governed by strict technical and regulatory standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Due to the nature of the technical data, the requirement is subject to export controls under ITAR and EAR, requiring contractors to have approved US/Canada Joint Certification Program certification and specific DLA training. Compliance with the Buy American Act and Berry Amendment is required, and any use of non-domestic materials must be disclosed. Invoicing must be processed through the Wide Area WorkFlow system. Security requirements include DFARS 252.204-7012 for safeguarding covered defense information and adherence to CMMC Level 2 standards.
FLUID HANDLING DIVISION

POSTED

about 19 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract entails comprehensive manufacturing readiness support for Small Unmanned Aerial Systems (SUAS), focusing on advancing workforce training, process maturity, quality assurance, and production scalability. The effort is designed to ensure that manufacturing capabilities are fully prepared for sustained, high-volume production with rigorous standards, aligning with Department of Defense requirements. Key activities include conducting Manufacturing Readiness Assessments (MRA) to identify gaps and implement corrective actions, developing scalable production workflows, and establishing robust quality control systems to maintain consistency and reliability across all SUAS units produced. The work is performed at Redstone Arsenal, Alabama, with a deadline for responses set for May 15, 2026, and is structured as a subcontract under the NAICS code 332996 for Other Miscellaneous Electrical Equipment and Component Manufacturing. The contracting activity is attributed to W6QK Acc-rsa, under the broader authority of the Department of Defense. Though no set-aside provisions are specified, the scope emphasizes transition from development to full-rate production, requiring proven expertise in defense manufacturing systems and the ability to rapidly integrate training and process improvements into an existing industrial base.

General Info

Provide workforce training and production support to enhance SUAS manufacturing readiness by May 2026.

Agency

Department Of Defense → W6QK Acc-rsaView Agency

NAICS

332996 - Fabricated Pipe and Pipe Fitting ManufacturingView NAICS

Place of Performance

Redstone Arsenal, AL, 35898, USA

Set-Aside

NONE

Documents

This scope was carved out of W58RGZ-26-S-C001-0002.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Platoon Level Small Uncrewed Aircraft System (SUAS)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-rsa
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W6QK Acc-rsa
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Support for manufacturing readiness including workforce training, process maturity, quality assurance, and production scalability for SUAS systems.

More opportunities from Department Of Defense → W6QK Acc-rsa

Same awarding agency

NAICS: 336411
New
Federal
FIRE CONTROL RADAR (FCR)
Solicitation # W58RGZ-26-R-0004
Solicitation W58RGZ-26-R-0004 is a request for proposal issued by the Department of Defense, specifically the Army Contracting Command-Redstone, for Performance Based Goals Life Cycle Contractor Support for the Apache AH-64 Fire Control Radar. The contract structure consists of a one-year base period starting in January 2027, with four one-year options and a six-month extension option. It utilizes a combination of Firm Fixed Price and Cost-Plus Fixed Fee structures to manage supply support, manpower reporting, and various technical deliverables. The scope of work involves comprehensive logistics and maintenance support, including the management of contractor reparables, wholesale inventory, and the procurement of replenishment spares. Key requirements include the identification and management of Critical Safety Items such as the Mast Mounted Assembly and its associated components. The contractor is responsible for adhering to strict reporting standards, including Cost and Software Data Reporting, Material Release Order and Backorder reports with a target service availability goal of 85 percent, and the submission of obsolescence alert notices. Technical and security compliance is mandatory, requiring a Secret level Facility Security Clearance and adherence to the DD Form 254. Additionally, the contractor must follow specific procedures to gain access to the Logistics Modernization Program's Total Asset Visibility Contractor portal. The solicitation includes detailed pricing menus and reporting templates for depot repair costs, non-standard repairs, and actual cost and hours history to ensure transparent financial and performance tracking.
Aircraft Manufacturing

POSTED

2 days ago

DEADLINE

in 3 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS