Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Maria Ygnacio Bike Path Storm Repairs

Closed
20260803016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 14 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The County of Santa Barbara Department of Public Works Transportation Division is soliciting bids for the Maria Ygnacio Bike Path Storm Repairs project, located in the 2nd Supervisorial District in Eastern Goleta Valley, California. The scope of work involves the total removal and reconstruction of a 50-foot section of the bike path, retaining wall, and channel lining between stations 164+65 and 165+15. Key deliverables include the construction of a concrete pipe path, channel bank lining, a retaining wall, and the installation of Class VIII and Class III rock slope protection, a wood two-rail split fence, and a concrete cutter for drainage. The project also requires the application of compost and Type B rolled erosion control product netting on all disturbed areas. Work must be performed in accordance with Caltrans Standard Specifications and the County's Engineering Design and Quality Assurance standards. The contract will be awarded to the lowest responsible bidder, with bids due by 2:00 PM on August 18, 2026, via the PlanetBids portal. The successful contractor must complete the work within 20 working days and start site activities within five days of approval. Required security includes a bidder's security of at least 10 percent of the bid, and the winner must provide payment and performance bonds each equal to 100 percent of the total bid. Compliance requirements include adherence to Davis-Bacon labor standards, 49 CFR Part 40 drug and alcohol policies, and a 30 percent self-performance requirement for the original contract price. Comprehensive insurance coverage is required, including Commercial General Liability with limits of 5 million per occurrence and 10 million aggregate.

General Info

County of Santa Barbara awards $18 repair contract for Maria Ygnacio Bike Path storm damage in Goleta.

Documents

3

25STM3-2N04 Maria Ygnacio Bike Path Storm Repairs Special Provisions

PDF, High priority: read this first51 pages · special-provisions
High

Maria Ygnacio Bike Path Storm Repair Construction Plans 25STM3-2N04

PDF, High priority: read this firstplans
High

Asbuilt Plans for Bike Path - Paving and Construction Summary

PDF, Low priorityasbuilt-plans
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Santa Barbara Department of Public Works Transportation Division
Contacts4 people available
OfficeN/A
Office AddressN/A
Contacts
Alma D Garcia (Project Manager
Brent Clavin (Construction Manager

Full Description

Show more
Bid #25STM3-2N04: $18

More opportunities from California → County of Santa Barbara Department of Public Works Transportation Division

Same awarding agency

NAICS: 237310
SLED
25STM3-3N15 Storm Damage Repairs Arch Culvert Preventive Measures Calle Real At Canada Del Corral In The 3rd Supervisorial District
Solicitation # 25STM3-3N15
Solicitation 25STM3-3N15 is a project issued by the County of Santa Barbara Department of Public Works Transportation Division for storm damage repairs and preventive measures to an arch culvert located at Calle Real and Canada del Corral in the 3rd Supervisorial District. The scope of work includes temporary water diversion, shotcrete application, drilling and bonding, culvert slurry-cement backfill, and the installation of epoxy-coated bar reinforcing steel and welded wire reinforcement. Additional requirements involve traffic control, water pollution control, clearing and grubbing, and the relocation of concrete barriers. The estimated cost of the project is 175,500 dollars, and the contract will be awarded to the lowest responsible bidder. Bids are due by 2:00 PM on October 29, 2026. Qualified contractors must hold a Class A license or a combination of Class C licenses, including C-8, and be registered to perform public work per Labor Code Section 1725.5. Key deliverables include a Temporary Construction Diversion System Plan and a rain event contingency plan to maintain a 12-inch freeboard. The contractor must provide performance and payment bonds equal to 100 percent of the total bid, and a bid bond of at least 10 percent if additives are included. Work must commence within five days of contract approval, with a 24-hour notice required before starting site activities. The project adheres to the County's August 2024 Quality Assurance Program and requires compliance with prevailing wage rates determined by the California Department of Industrial Relations.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS