Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Marici Batter Energy Storage System Facility

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Industry

NAICS

236115 - New Single-Family Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Gale Avenue and Hinnen Avenue, Industry, CA, 91745

Set-Aside

NONE

Documents

(22)

Revised Geotechnical Engineering Report for City of Industry BESS and Substation

PDFgeotechnical-report

Appendix O Emergency Air Toxics Analysis for Marici BESS Facility

PDFtechnical-memorandum

Marici Gen-Tie Line EMF Study Report August 14, 2025

PDFemf-study-report

Phase I Environmental Site Assessment - 16207 and 16209 Gale Avenue

PDFphase-i-esa

Appendix P Hydrology Study and Stormwater Quality Management Plan

PDFstudy-report

Marici BESS Facility Notice of Completion and Environmental Document Transmittal

PDFnotice-of-completion

Appendix L Hazardous Materials and Safety Memorandum Marici Project

PDFsow

Appendix C Biological Resources Assessment Marici BESS Project

PDFbiological-resources-assessment

Marici Battery Energy Storage System Facility Initial Study / Mitigated Negative Declaration

PDFinitial-study-mnd

Appendix D Geotechnical Engineering Report for ABI Properties BESS

PDFgeotechnical-report

Appendix J Limited Site Investigation 16233 and 16235 Gale Avenue

PDFlimited-site-investigation

Limited Site Investigation Report - 16207 and 16209 Gale Avenue

PDFlimited-site-investigation

Appendix M Plume Study for Marici Battery Energy Storage System

PDFstudy-report

Appendix K Revised Soil and Groundwater Management Plan for Marici Project LLC

PDFsoil-groundwater-management-plan

Marici Battery Energy Storage System Facility Project - Notice of Availability and Intent to Adopt IS/MND

PDFnotice-of-availability

Marici Battery Energy Storage Facility Environmental Summary

PDFenvironmental-summary

Appendix Q_Sount Impact Assessment_OPT

PDF

Appendix B Construction Health Risk Assessment for Marici Project LLC

PDFhealth-risk-assessment

Appendix A Air Quality and Greenhouse Gas Emissions Report for Marici Energy Storage Project

PDFreport

Appendix R Transportation Study for City of Industry Battery Storage Facility

PDFtransportation-study

Phase I Environmental Site Assessment - 16233 and 16235 Gale Avenue

PDFphase-i-esa

Phase I Environmental Site Assessment - 16253 and 16293 Gale Avenue

PDFphase-i-esa

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Industry
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Industry
Office AddressN/A
Contacts
Eduardo ManriquezContract Senior Planner
Jorge EstradaSenior Associate
Eduardo ManriquezContract Senior Planner

Interested Companies (1)

Show more
PlaceWorks
Santa Ana, CA

Full Description

Show more
The Marici Battery Energy Storage System Facility Project (Proposed Project) is located at 16233, 16207, and 16253 Gale Avenue (project site) in the City of Industry (City) and includes redevelopment of a 9.2-acre site and minor improvements to SCE Walnut Substation that abuts the project site. The Proposed Project includes the construction and operation of an approximately 400-megawatt battery energy storage system (BESS) facility and associated site and infrastructure improvements on the project site. Development of the BESS facility requires demolition of all existing buildings, structures, hardscapes, and minimal landscaping on-site. The minor improvements to the SCE Walnut Substation would help interconnect and transfer power between the proposed BESS facility and SCE Walnut Substation. At the end of the Proposed Project’s operational term, which is anticipated to be 35 years, the project applicant may determine that the BESS facility could be decommissioned and deconstructed, or it may seek an extension of its use permit. The Proposed Project would utilize lithium-ion batteries and ancillary equipment to store energy received from the regional electric grid to then be returned to the grid when needed. The containers or enclosures would have battery storage racks, with relay and communications systems for automated monitoring and management of the batteries to ensure design performance. A battery management system would be provided to control the charging/discharging of the batteries, along with temperature monitoring and control of the individual battery cell temperature with an integrated cooling system. Batteries operate with direct current (DC) electricity, which must be converted to alternating current (AC) for compatibility with the existing electric grid. Power inverters to convert between AC and DC, along with transformers to step up the voltage, would also be included. Project battery modules would be housed in purpose-built enclosures. Inverters and transformers will convert between low-voltage direct current (DC) conveyed in and out of the batteries and the regional electric grid's high-voltage alternating current (AC). The rapid response batteries can be utilized to stabilize rapid changes in electric power demand, which reinforces grid stability. The Proposed Project will include an onsite substation and an overhead 220 kV electric line across the eastern site boundary into the adjacent Southern California Edison (SCE) Walnut Substation. Additional ancillary features include auxiliary equipment pads with transformers and control equipment, paved access and Fire Lane, fire hydrant system, stormwater drainage controls, a 10-foot-high perimeter wall designed to City and fire department requirements, landscaping, and a storage building and containers for spare parts and equipment. Development of the BESS facility requires demolition of all existing buildings, structures, hardscapes, and minimal landscaping on-site. Also, SCE identified a need for various modifications and improvements to the Walnut Substation to accommodate and support the Proposed Project’s interconnection. The Project would require the following permits and approvals: CEQA Approval, adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program, approval of a Zone Code text amendment to allow the use with a Conditional Use Permit (CUP), approval of a CUP, approval of Development Plan Application – Long Form, and approval of a Development/Community Benefit Agreement. Additional permits and approvals will include National Pollutant Discharge Elimination System (NPDES) Construction General Permit would be required from the Los Angeles Regional Water Quality Control Board, General Construction Stormwater Permit, Demolition Permit, and Subsequent Approvals including issuance of applicable grading and building permits.

Similar Contracts

Same NAICS industry code

NAICS: 236115
New
SLED
BIA Replacement home
Solicitation # 161258
The Choctaw Nation Housing Authority is soliciting itemized quotes for the complete setup of a 16 by 50 foot modular home, built in 2026, located at 1201 W Canfield Rd in Idabel, Oklahoma. This project is funded through a BIA Over Income Program for a disabled veteran. The scope of work includes comprehensive site improvements such as preparing and leveling the building pad, pouring 18 by 18 inch concrete footings with number 4 rebar, and restoring the surrounding yard to mowing condition with Bermuda grass seed. The contractor is responsible for installing underground electrical in schedule 40 conduit, connecting water and sewer utilities using PEX and PVC piping, and installing a septic tank system. Additional requirements include installing 29 gauge metal underpinning, performing necessary tree trimming and fence restoration, and constructing covered front and back porches equipped with ADA-compliant ramps and handrails. All work must meet or exceed 2019 IRC standards and applicable local and state electrical and plumbing codes. The contractor is responsible for all measurements, material counts, permits, and line locates, ensuring the home is cleaned and move-in ready upon completion. Prospective bidders must visit the project site before submitting a quote, as change orders for identifiable site conditions will not be approved. Bids must be submitted exclusively through the Housing Bid Board by September 28, 2026, and must include itemized pricing and a price validity date. This solicitation applies Davis-Bacon wage requirements and provides preference to Indian organizations and Indian-owned economic enterprises. Project oversight is managed by Case Manager Jeannine Davis and Inspector Corey James.
Choctaw Nation Housing Authority

POSTED

4 days ago

DEADLINE

in 6 days
View Details
NAICS: 236115
New
SLED
House Setup and House Development Services Phase II
Solicitation # 26-27-06
The City of Greenville is seeking licensed general contractors for solicitation 26-27-06 to provide house setup and site development services as part of the 50-in-10 Affordable Housing Initiative. This project involves the construction of three affordable homes located at 609 West 5th Street, 805 West 5th Street, and 907 Cherry Street. Each home will feature 3 bedrooms and 2 bathrooms, ranging from 1,300 to 1,500 square feet. The scope of work includes excavation, construction of CMU block foundations, installation of R-19 and R-38 insulation, and coordination of electrical, plumbing, and HVAC systems. Contractors must also handle landscaping with a requirement that 50 percent of vegetation consists of native species. Eligible bidders must possess a valid North Carolina contractor license, at least three years of experience in land clearing and grading, and comprehensive insurance coverage, including general liability, workers compensation, and auto liability of at least 1 million dollars per occurrence. A mandatory pre-bid meeting is scheduled for September 21, 2026, at 609 West 5th Street. Proposals, which must include a project approach, timeline, and itemized cost proposal on the provided bid submittal sheet, are due by 9:00 AM on October 5, 2026. The contract term is twelve months from the date of award, with each home expected to be completed within 45 to 60 days of the notice to proceed. Payment terms are set at net 30 days from the date of approved invoice receipt.
City of Greenville

POSTED

5 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS