Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on August 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Marina at American Wharf Fuel System Engineering

Closed
25-13State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 5 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
CITY OF ALAMO FY27 CDBG SEWERAGE
Solicitation # PE-66394-NONST-2027-000000011
The City of Alamo is soliciting statements of qualifications and proposals from engineering firms licensed in the State of Georgia to provide professional services for the improvement of the city's sewerage system. The scope of work involves providing preliminary design services for a potential FY27 Community Development Block Grant (CDBG) project, with the requirement that a draft Preliminary Engineering Report be submitted by January 15, 2027. If funding is secured, the selected firm will also be responsible for the subsequent design and construction management services. Proposals are due by November 30, 2026, and must include the firm's history, CDBG/EIP/RDF experience, key personnel qualifications, current workload, proposed scope of service, references, and associated fees or percentages. Evaluation of respondents is based on a point system assessing the firm's ability to provide necessary disciplines, experience with similar projects, quality of references, and price competitiveness. Additionally, firms must confirm they possess Errors and Omissions insurance and can meet the PER deadline. All contracts are subject to the provisions of the Georgia Department of Community Affairs and must comply with various federal and state laws regarding HUD Assisted Projects, including the Build America, Buy America Act, the Americans with Disabilities Act, and the Civil Rights Act of 1964. The primary point of contact for this solicitation is Bethany Newby.
City of Alamo

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Norwich is seeking a qualified engineering firm for the Marina at American Wharf Fuel System Engineering project, solicitation number 25-13. The objective is to assess, permit, and procure a replacement for a fuel system that has been inoperable for several years. The project involves installing a new aboveground storage tank to replace a previously removed underground tank and replacing two fuel dispensers, hose reels, nozzles, and the electronic monitoring system. The scope of work also includes evaluating existing infrastructure for potential reuse, specifically the underground double-wall fiberglass piping, the Franklin Fueling metal ducted overwater piping, and various electrical conduits between the pump, tank, and dispenser areas. Interested parties must submit their responses by the deadline of September 20, 2024.

General Info

City of Norwich seeks engineering firm to replace Marina fuel system by September 20.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → City of Norwich
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → City of Norwich
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The current fuel system at the marina has been out of service for several years and is no longer operable, we are looking for a qualified engineering firm to assist with assessment of the system and aid in the permitting and procurement process. The scope of work for this project may include but is not limited to the following: •A new aboveground storage tank will be installed to replace the underground storage tank that has been removed. The proposed tank will be in the vicinity of the previous tank. •The two existing fuel dispensers and associated hose reels, hoses, nozzles and the existing Veeder-Root 300C electronic monitoring system will be replaced. The proposed fuel dispensers will be installed in the same location as existing. •The existing underground double-wall wall fiberglass piping from the former underground tank to the top of the gangway will be tested and considered for reuse. •The existing Franklin Fueling metal ducted overwater piping will be tested and considered for reuse. •Existing electrical conduits between the pump and tank electrical area and the former tank area, and between the pump and tank electrical area and the dispensers will be evaluated and considered for reuse.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS