Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Marine Work Only Harbor Administration Building

Closed
HD 25-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves marine-only site preparation work for the construction of a new two-story administration building in California. Key activities include demolishing an existing aluminum gangway and concrete landing, excavating and trenching for pile foundations, and installing a lateral-spread steel sheet pile wall to provide structural support. The project also encompasses placing precast prestressed concrete piles and a cast-in-place foundation slab to support a new gangway landing. Additionally, the work involves installing geotextile filter fabric, bedding, and a quarter-ton armor stone revetment above high-tide levels to ensure shoreline stability, along with constructing cast-in-place concrete finishes. A design-build aluminum gangway with guardrails will be fabricated and installed, and utility connections between the landside and floating dock will be replaced to ensure proper functionality. The solicitation, titled "Marine Work Only Harbor Administration Building," was posted on August 8, 2025, with a response deadline of September 22, 2025. The project is managed under NAICS code 238910, indicating specialized work in site preparation, foundation, and marine construction. The contract size is estimated to be between five and ten million dollars, with the work to be performed within California. Interested parties can find additional details and submit responses through the provided online portal.

General Info

Agency

California → HAR

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → HAR
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → HAR
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project consists of marine‐only site preparation for a future two‐story administration building, including demolition of the existing aluminum gangway and concrete landing, excavation and trenching for pile foundations, installation of a lateral‐spread steel sheet pile wall, placement of precast prestressed concrete piles and cast‐in‐place foundation slab for a new gangway landing, installation of geotextile filter fabric with bedding and quarter‐ton armor stone revetment above high‐tide elevation, construction of cast‐in‐place concrete finishes, fabrication and installation of a design‐build aluminum gangway and guardrails, and replacement of utilities between landside and floating‐dock connections.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS