Mariposa Creek Parkway Phase 1 and Phase 2 Restoration Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Mariposa Creek Parkway Phase 1 and Phase 2 Restoration Project entails the removal of invasive plant species, specifically Himalayan blackberry and tree of heaven, from 4.05 acres of riparian corridor using a combination of mechanical, manual, chemical, and prescribed burn methods. Prior to burning, non-target vegetation will be thinned and fire breaks will be established by hand to ensure controlled conditions. Following removal, the site will be restored through the planting of locally native trees, shrubs, and herbaceous species, with each planting secured in excavated holes capable of accommodating up to 25-gallon containers. To enhance survival rates, root protection baskets, weed suppression mats, and browse guards will be installed for every plant. A temporary drip irrigation system, constructed from acrylonitrile butadiene styrene and poly plastic piping, will be deployed on the ground surface to deliver supplemental water from a municipal source, and will be removed after the completion of restoration monitoring. Watering will be conducted seasonally from November through April over a three-year establishment period to support the successful reestablishment of native vegetation.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
