Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Market Survey – Industry Insights on Industrialized Construction (IC) Methodologies for Army Installation Resilience

Closed
W912GB27Z1CGTFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Europe District is conducting a market survey to identify industry capabilities regarding Industrialized Construction (IC) and alternative building methodologies. This initiative aims to shift away from traditional design-bid-build processes toward strategies that accelerate infrastructure delivery, reduce initial capital costs by 30 percent, and shorten delivery timelines by 50 percent. A key strategic shift involves optimizing facilities for a 25-year lifespan rather than the traditional 50-year baseline to increase operational flexibility and allow for easier repurposing or relocation of assets. The government is specifically seeking feedback on five methodologies: volumetric modular construction, kit of parts/panelized systems, pre-engineered metal buildings, tension fabric structures, and additive manufacturing. These methods will be applied to aircraft hangars, maintenance facilities, and repeatable buildings such as barracks and child development centers. Interested firms are invited to submit a capability statement of no more than ten pages by September 26, 2026, detailing their technical expertise, project history, and ability to meet these specific cost and schedule benchmarks.

General Info

USACE market survey for industrialized construction to reduce costs and accelerate infrastructure delivery.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Wiesbaden, DE-HE, DEU

Set-Aside

NONE

Documents

1

SAIE-ZA Memo - Facility Construction Policy for Industrialized Construction

PDF, Low priority3 pages · memorandum
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Endist Europe
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Andrew Cochran
Ryan Shoemaker

Full Description

Show more

1. INTRODUCTION & PURPOSE


This Special Notice is issued solely for market research, information, and planning purposes—it does not constitute a Request for Proposal (RFP), Request for Quote (RFQ), or Invitation for Bid (IFB). There is no commitment by the Government to issue a solicitation, make awards, or pay for any costs incurred by respondents in preparing responses to this notice.


The U.S. Army Corps of Engineers (USACE) Europe District (NAU) querying the commercial marketplace to gauge industry capabilities, technical maturity, commercial availability, and execution strategies regarding Industrialized Construction (IC) and alternative construction methodologies.


The objective of this market survey is to obtain strategic industry feedback to operationalize recent Department of the Army policy directives aimed at accelerating infrastructure delivery, reducing initial capital costs, and increasing real property portfolio flexibility.


2. BACKGROUND & STRATEGIC INTENT


In accordance with the Department of the Army Memorandum (Facility Construction Policy Implementing Installation Resilience through Industrialized Construction (IC) Methodologies), the Army is transforming how it plans, designs, and constructs facility assets.


Traditional design-bid-build processes and on-site construction methods are too slow and costly to keep pace with modem operational requirements. The intent is to accelerate the delivery of critical infrastructure, reduce initial capital costs, and increase the flexibility of the Army's real property portfolio to meet rapidly evolving warfighter requirements.


Historically, Army facilities have been engineered for 50-year lifespans, often becoming functionally obsolete before structurally deficient. Moving forward, facilities will be designed to optimize an approximately 25-year lifespan. This provides strategic agility to align with supported platforms and enables rapid recapitalization by allowing structures to be repurposed or relocated as missions change. As a result, the Army seeks to transition to modern Industrialized Construction methodologies targeting:


  • 50% faster delivery timeline compared to traditional construction.
  • 30% reduction in initial capital costs.
  • Optimization for an approximate 25-year facility lifespan (moving away from traditional 50-year engineering baselines) to enable strategic agility, rapid recapitalization, repurposing, or relocation as operational missions evolve.

3. TOPICS OF INTEREST: IC METHODOLOGIES & FACILITY APPLICATIONS


NAU is specifically seeking industry capabilities and technical feedback regarding five (5) primary alternative construction methodologies (Ref: ASA IE&E Memo, Para 3.a–e) as applied to three (3) key facility categories (Ref: ASA IE&E Memo, Para 5.a–c), though application to other repeatable facility types is also welcomed.


A. Directed Alternative Construction Methodologies (Memo Para 3.a–e)


  1. Volumetric Modular Construction: Off-site manufactured three-dimensional volumetric units transported and assembled on-site.
  2. Kit of Parts (Panelized) / Pre-Cast Systems: Prefabricated components, wall panels, and structural assemblies designed for specific building configurations.
  3. Pre-Engineered Metal Buildings (PEMB): Standardized, scalable steel structural systems.
  4. Tension Fabric Structures (TFS): Rapidly deployable aluminum or steel-framed engineered fabric structures.
  5. Additive Manufacturing (3D Printing): Automated, on-site or near-site concrete/composite 3D printing systems.

B. Primary Target Facility Applications (Memo Para 5.a–c)


  • Category 1: Aircraft Hangars (Para 5.a)
  • Primary Focus: Application of Tension Fabric Structures (TFS) providing clear-span workspaces and environmental protection, erected in a fraction of traditional construction timelines.
  • Category 2: Maintenance Facilities (Para 5.b)
  • Primary Focus: Application of Pre-Engineered Metal Buildings (PEMB) or Panelized Steel Structures capable of supporting heavy-duty overhead cranes while standardizing procurement and accelerating erection.
  • Category 3: Barracks, Child Development Centers (CDCs), Kennels, & Repeatable Buildings (Para 5.c)
  • Primary Focus: Application of Volumetric Modular Construction, Kit of Parts, or Additive Manufacturing (3D Printing) offering high off-site quality control, enhanced thermal performance, and rapid occupancy turnaround.

4. CORE CAPABILITY & EXPERIENCE INQUIRIES ("THE PULSE")


Interested sources are requested to provide clear, concise responses to the following core inquiries:


Section A: Firm Overview & Strategic Alignment


  1. General Capability: Briefly describe your firm’s primary business model, technical focus, manufacturing capacity (if applicable), and experience operating as a prime contractor or key technology partner in Industrialized Construction.
  2. Target Scope & Capacity: What is your firm’s ideal project scale (e.g., square footage, dollar value, or unit volume per year) for delivering IC solutions?

Section B: Technical Evaluation of Methodologies (Memo 3.a–e vs 5.a–c)


  1. Methodology Alignment: Detail your firm’s specific capabilities and execution track record in one or more of the following:
    -Volumetric Modular
    -Kit of Parts / Panelized Pre-Cast
    -Pre-Engineered Metal Buildings (PEMB)
    -Tension Fabric Structures (TFS)
    -Additive Manufacturing (3D Printing)
     
  2. Facility Application & Suitability: How well do your IC methodologies integrate with the designated facility types (Hangars, Maintenance Shops, Barracks/CDCs/Repeatable Structures)? What technical modifications or building code considerations are critical for DoD adoption? Are there other facility types that are not included in this announcement that your firm believes would be good candidates for IC methodologies?
     
  3. 25-Year Lifespan & Flexibility Optimization: With the Department of War’s stated objective of reducing the expected lifespan of these facilities to be constructed from 50 years to 25 years in order to achieve lower investment and maintenance costs,  do you believe that the IC construction methodologies contemplated by this memorandum are viable delivery methods to meet the 25 year life span expectation? How do the IC methodology capabilities that your company possesses a 25-year optimized lifecycle? Discuss disassembly, relocation, structural repurposing, and recapitalization advantages of your system compared to traditional 50-year brick-and-mortar builds.

Section C: Cost, Schedule, & Delivery Optimization


  1. Speed & Cost Metrics: How can your firm achieve or approach the Army's benchmark goals of 50% faster delivery and a 30% cost reduction?
  2. Supply Chain & Logistics: What are the key supply chain, manufacturing lead time, or transportation constraints associated with scaling your IC methodology across domestic (CONUS) and/or overseas (OCONUS) military installations?
  3. Contracting & Delivery Models: What project delivery models best support your manufacturing and installation workflows?

Section D: Sourced Experience & Project History


Provide up to three (3) representative project examples completed within the past five (5) years demonstrating successful implementation of IC methodologies. For each project, specify:


  • Facility type and delivery methodology utilized (from Para 3.a–e).
  • Timeline comparison (design/fabrication/erection time vs traditional estimated baseline).
  • Cost performance and life-cycle/re-use features.
  • Key lessons learned and recommendations for Government adoption.

5. SUBMISSION INSTRUCTIONS


Firms possessing the capability, experience, and interest in supporting the Army's Industrialized Construction policy are invited to submit their responses in accordance with the following parameters:


Response Parameters:


  • Page Limit: Not to exceed ten (10) pages total (including cover page and attachments).
  • Format: Microsoft Word (.docx) or Adobe PDF (.pdf) format, standard 12-pt font.
  • Submittal Address: Submissions must be sent electronically via email to:
  • Primary POC: andrew.a.cochran@usace.army.mil
  • Secondary POC: ryan.s.shoemaker@usace.army.mil
  • Response Due Date: September 26, 2026 at 15:00 EST.

Disclaimer:


All submissions will be treated as public domain information for market research purposes. Do not submit proprietary data, protected trade secrets, or sensitive IP. The Government will not pay for information received.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS