Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Martin Metal Finishing Removal Action Workplan

Forecast
20064State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Martin Metal Finishing Removal Action Workplan, under solicitation number 20064, is a project managed by the Central Valley Flood Protection Board located in Stockton, California. The scope of work involves the excavation of approximately 750 cubic yards of soil contaminated with lead and hexavalent chromium from the Mormon Slough channel to a depth of two feet below ground level. Following the offsite disposal of the contaminated soil, the project requires the placement of 750 cubic yards of imported fill and the installation of a one-foot-thick erosion control cap along the southern edge of the work area. The project is located within the Mormon Slough, approximately 900 feet upstream of the South Wilson Way Bridge. It is officially exempt from the California Environmental Quality Act under three categorical exemptions: Class 4 for minor alterations to land that do not impact mature trees, Class 30 for actions to mitigate the release of hazardous substances, and Class 33 for small habitat restoration projects under five acres. Administrative oversight is provided by Executive Officer Chris Lief and Senior Environmental Scientist Jordan Robbins.

General Info

Excavate 750 cubic yards of contaminated soil and install erosion control in Stockton.

Agency

California → Central Valley Flood Protection Board

Place of Performance

Stockton, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist

Full Description

Show more
The project is exempt from CEQA under Class 4, Minor Alterations to Land, categorical exemption (California Code of Regulations, Title 14, Section 15304), because it involves minor alterations to land that do not involve the removal of healthy, mature, or scenic trees. The project is also exempt from CEQA under Class 30, Minor Actions to Prevent, Minimize, Stabilize, Mitigate, or Eliminate the Release or Threat of Release of Hazardous Waste or Hazardous Substances, categorical exemption (California Code of Regulations, Title 14, Section 15330), because the proposed activity consists of excavation and disposal of contaminated soils in regulated units offsite. Finally, the project is exempt from CEQA under Class 33, Small Habitat Restoration Projects, categorical exemption (California Code of Regulations, Title 14, Section 15333), because the proposed activity does not exceed five acres in size to assure the maintenance, restoration, enhancement, or protection of habitat for fish, plants, or wildlife. Further, none of the exceptions to the exemption in California Code of Regulations, Title 14, Section 15300.2 apply.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Federal
Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP)
Solicitation # W9127827RA002
The Fiscal Year 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP) is a small business set-aside solicitation for a single-award, 10-year firm-fixed-price contract. Managed by the U.S. Army Engineer District Mobile, the project has an estimated value between 25 million and 100 million dollars. The scope involves comprehensive, performance-based environmental remediation at 58 Installation Restoration Program sites and 5 Military Munitions Response Program sites across Eglin Air Force Base, Hurlburt Field, and Tyndall Air Force Base in Florida. Required services include investigation, design, construction of remedial systems, operation and maintenance, remedy optimization, and the achievement of site-specific performance objectives. The government will utilize a Best Value Tradeoff analysis for the award, where non-price factors—specifically technical approach, risk management, project management organization, the integrated master schedule, and past performance—are significantly more important than price. Key deliverables include a Project Management Plan, an Integrated Master Schedule in Primavera P6 format, and a Milestone Payment Schedule. Contractors must adhere to strict hazardous materials labeling, waste management, and sample preservation standards, as well as cybersecurity and geospatial data protection requirements. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment between December 1 and December 18, 2026.
W074 Endist Mobile

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS