Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

MARYVALE POOL AND TWO SPLASH PADS AT MARIVUE AND HOLIDAY PARKS (GO BOND) CONSTRUCTION MANAGER AT RISK SERVICES

Open
State & Local
Response DeadlineDue in 22 days
Solicitation #
PA75200758

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Phoenix is seeking qualifications for Construction Manager at Risk (CMAR) services for the Maryvale Pool and two splash pads at Marivue and Holiday Parks (GO Bond). The scope of work is divided into pre-construction services, which include design and constructability reviews, cost estimation, and value engineering, and the construction phase, which involves implementing a subcontractor selection plan and managing construction progress. The selected firm must ensure all services conform to Title 34 of the Arizona Revised Statutes and provide a Guaranteed Maximum Price (GMP) proposal for approval. Selection will be based on a qualifications-based process using a Statement of Qualifications (SOQ) and reference evaluations, with no formal interviews. Applicants must submit a PDF SOQ of no more than 20 pages via the City's Procurement Portal by December 18, 2026. Required documentation includes an information sheet with the legal firm name, an organization chart of key personnel, Arizona contractor licenses, and a separate bonding capacity statement from a surety company rated A- or better. The contractor must also comply with the Small Business Enterprise (SBE) Program, providing monthly audit reports and a final certification of payment to subcontractors.

General Info

Phoenix seeks a CMAR for pool and splash pad construction and management.

Documents

7
PDF, High priority: read this first16 pages · rfq
High
PDF, High priority: read this first8 pages · contract-document
High
PDF, High priority: read this first3 pages · contract-document
High
DOCX, High priority: read this firstpast-performance
High
PDF, High priority: read this first5 pages · reference-check-instructions
High
PDF, Low priorityother
Low
PDF, Low priority3 pages · other
Low

Read all 7 documents

Due in 22 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 22 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 7 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA

Full Description

Show more
The City of Phoenix is requesting qualifications for Project Title . Qualifications are to be submitted via the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix before Response Submission Time on Response Submission Date .

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new plumbing fixtures and partitions, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with integrated electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and plumbing. The project is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total completion timeframe of 425 calendar days. Proposals are evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. Required deliverables include preconstruction submittals such as quality control and safety plans, shop drawings, and product data. The contract is subject to the Davis-Bacon Act and requires the provision of both payment and performance bonds. Proposals must be submitted electronically in PDF format, with the bid schedule provided in Excel via Exhibit A, by the deadline of December 02, 2026.
Bristol Alliance of Companies

POSTED

13 minutes ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year no dollar limit warranty, and exterior wall systems. Interior improvements involve reconfiguration, new finishes including epoxy mortar flooring, and the installation of overhead coiling doors. The project also requires comprehensive system upgrades, including updated HVAC systems with rooftop air-handling units and water chillers, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Site improvements encompass paving removal and replacement, drainage upgrades, and hazardous materials abatement. The project has an estimated cost between 10 million and 25 million dollars with a completion period of 730 days. Award is based on the lowest price, and bidders must provide pricing for two specific line items: building renovation and paving removal and replacement. The proposal deadline is December 2, 2026. Bonding requirements vary by proposal value, with those over 150 thousand dollars requiring bid, payment, and performance bonds. The contract is subject to the Davis-Bacon Act and Buy American requirements. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

13 minutes ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, managed by NAVFAC Northwest ROICC Kitsap, involves repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope of work includes addressing a Risk Assessment Code Level 4 (RAC-4) deficiency by extending sprinklers to the loading dock, ensuring elevator pit sprinkler control valves are locked open and monitored by the fire alarm system, and installing missing backflow preventers on the north and south 6-inch wet pipe sprinkler system risers. The contractor is responsible for all final design documentation per FC 1-300-09N, construction materials, labor, supervision, and performance testing. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm Fixed-Price structure and an estimated value between $1 million and $5 million. The period of performance is 440 days from the date of award. Proposals must be submitted via the PIEE portal by December 16, 2026. Award is based on price and MACC past performance, with a bid guarantee required at 20 percent of the bid price or $3 million, whichever is less. The contract mandates strict adherence to safety and environmental standards, including EM 385-1-1 and UFC 4-010-06 cybersecurity standards, and requires compliance with Davis-Bacon wage rates and the Buy American requirement.
Bristol Alliance of Companies

POSTED

13 minutes ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 involves a design-build project for the renovation and modernization of Facility 6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between 10 million and 25 million dollars. The scope of work includes a two-phase renovation to expand mission capabilities, featuring the construction of a 400 square foot addition for forklift battery charging, the installation of a prefabricated paint booth with a dry chemical system, and the replacement of a 40-ton bridge crane. A critical requirement is that the facility must remain operational and mission-capable between Phase 1 and Phase 2, which necessitates strict scheduling, multiple mobilization and demobilization cycles, and the completion of all design documents for both phases during the first phase. The project must comply with various standards, including Unified Facilities Criteria (UFC), NFPA 13 and 33, and Puget Sound Clean Air Agency regulations. Award is based on price and MACC past performance, with proposals submitted via the PIEE portal. The contractor is required to provide a bid bond and subsequent performance and payment bonds. Quality control is managed through a three-phase control process, and the contractor must adhere to strict cybersecurity and Controlled Unclassified Information (CUI) standards. There is no set-aside status specified for this solicitation.
Bristol Alliance of Companies

POSTED

13 minutes ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of Building #1963 LBJ Dorm at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks and requires the contractor to perform a visual inspection to determine the necessary replacement. This is a Small Business set-aside opportunity, open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. A mandatory site visit is scheduled for December 3, 2026, at 11 AM, and proposals must be submitted by December 14, 2026. The contract will be awarded based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum bid including a detailed cost breakdown, a timeline for substantial completion, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must provide a one-year workmanship guarantee and a two-year manufacturer's product warranty. All work must adhere to EPA, OSHA, and local Indiana building codes. Required insurance includes automobile liability and workers compensation, with Adams & Associates named as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

19 minutes ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Federal
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the P084 Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofs, and a combination of masonry veneer and metal panel siding. The project also encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, and an underground stormwater retention system, along with the demolition of Building 1272T. The contract is a solicitation issued by J&J Contractors, Inc. and is set aside for Small Business (SB), SAM.gov designated Small Disadvantaged Business (SDB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), SBA certified Veteran Owned Small Business (VOSB), and SBA certified Service-Disabled Veteran-Owned Small Business. Pricing is requested for various trades, including demolition, electrical, mechanical, and structural steel. The project is exempt from sales tax and adheres to Davis Bacon Wage Rates.
J&J CONTRACTORS, INC.

POSTED

19 minutes ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is a subcontracting opportunity for the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project involves the removal and replacement of damaged fire-rated doors and frames at the center's cafeteria, requiring the installation of new fire-rated doors while reusing existing push bars and closure systems. The contract is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). All work must comply with EPA and OSHA regulations, as well as Davis Bacon Act wage rate decisions, and the contractor must hold a valid State of Indiana contractor's license. The award will be based on Best Value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on December 1, 2026, and submit a typed proposal on official company letterhead by December 11, 2026. Proposals must include a single lump sum bid with a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. The contract includes a one-year guarantee of workmanship and manufacturer warranties, with payment terms set at Net 30. Required insurance includes automobile liability and workers compensation, with Adams and Associates, Inc. named as an additional insured.
Atterbury Job Corps – Adams & Associates

POSTED

19 minutes ago

DEADLINE

in 14 days
View Details

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project (PW26740069). The project involves replacing or remedying all existing drain, waste, vent, and storm drainage systems at 600 E. Washington Street to address aging infrastructure. With an estimated construction cost of $8.2 million, the CMAR will be responsible for preconstruction services, including cost estimating and budget validation, as well as the development of a Guaranteed Maximum Price (GMP) in MAG or CSI format. The scope also includes full construction management, safety oversight, and the provision of an add alternate for ADA upgrades, specifically adult changing stations. Qualified firms must submit a Statement of Qualifications (SOQ) in PDF format via the City's Procurement Portal by December 11, 2026. The SOQ is limited to 12 pages and must include the firm's legal name, vendor number, and current Experience Modification Rate (EMR). Evaluation is based on a scoring rubric for references, with a total of 21 points available across seven performance categories. The contract requires strict adherence to the Small Business Enterprise (SBE) program, requiring subcontractors to be certified by the City of Phoenix and located within Maricopa County. Additionally, the CMAR must maintain an emergency response plan providing 24/7 coverage with a two-hour on-site response time.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS