Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Masson Estates

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Masson Estates project in Saratoga, California, entails the subdivision and development of a 72.45-acre parcel, with construction limited to the northern 18.38 acres, while the southern 54.06 acres remain undeveloped except for an emergency access road. The project will deliver 25 single-family homes, comprising 20 market-rate units and 5 affordable units, each ranging from 2,375 to 7,091 square feet with lot sizes spanning 2,086 to 86,351 square feet. Lots 1 through 8 will feature 2,375-square-foot, four-bedroom, two-bathroom homes with two-car garages; of these, lots 1 through 4 are designated affordable, while lots 5 through 8 are market-rate. Lots 9 through 25 will include larger, market-rate homes up to 7,091 square feet with four bedrooms, four bathrooms, and three to four car garages. The development will include pavement improvements to the existing emergency access road and the removal of 367 trees, primarily replaced with Coast live oak. Environmental compliance is central to the project, with requirements tied to the 2022 California Building Code, California Fire Code, ASTM E1527-21 for environmental site assessments, and Santa Clara County stormwater and hazardous materials regulations. Key deliverables include biological and aquatic resource assessments, geotechnical investigations, wildfire protection plans, evacuation analyses, and fire flow verification documents. The City of Saratoga is the lead agency, with oversight and acceptance responsibilities resting with local and state entities such as the Santa Clara County Department of Environmental Health and the San Francisco Bay Regional Water Quality Control Board. Performance timelines are partially defined, with paving scheduled for September to October 2026 and architectural coating work from October to November 2026, though the overall project duration is not formally stated. Contractual details such as value, payment procedures, inspection protocols, and evaluation criteria are not fully articulated in the available information, and no formal contract type, solicitation number, or federal procurement clauses were identified. Representations from offerors, including size status or socioeconomic certifications, were not provided, and no federal acquisition regulation clauses or military standards were referenced. The project relies on environmental and technical documentation to meet regulatory standards rather than traditional contract execution elements.

General Info

25 homes on 72.45 acres, 5 affordable, 18.38 acres developed, 367 trees removed, environmental compliance required.

Agency

California → City of Saratoga

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Pierce Road and Saratoga Heights Drive, Saratoga, CA, 95070

Set-Aside

NONE

Documents

(16)

Appendix H - Noise Impact Analysis for Masson Estates Project

PDFnoise-impact-analysis

Appendix J - Wildfire Protection Plan and Supporting Information

PDFsupporting-document

Appendix B - Air Quality, GHG, Energy Analysis Report for Masson Estates Project

PDFsupporting-document

Appendix C - Biological Resources Assessment for Masson Estates Residential Project

PDFsupporting-document

Appendix E - Geology and Soils Supporting Information for Masson Estates Residential Development

PDFsow

Appendix G - Hydrology and Water Quality Supporting Information COMBINED

PDF

Masson Estates Notice of Completion and Environmental Document Transmittal SCH# 2024050461

PDFnotice-of-completion

Masson Estates Environmental Impact Summary Form

PDFenvironmental-summary

City of Saratoga Masson Estates EIR Notice of Preparation

PDFpresolicitation

Appendix F - Phase I Environmental Site Assessment for Masson Estates Saratoga CA

PDFphase-i-environmental-site-assessment

Appendix D - Cultural Resources Supporting Information

PDFother

CDFW Comment on Masson Estates Project Draft EIR SCH No. 2024050461

PDFcomment-letter

Appendix I - CEQA Transportation Study for Pierce Road Homes Saratoga

PDFstudy

Caltrans Comment Letter on Masson Estates DEIR SCH 2024050461

PDFcomment-letter

19660002 Saratoga Masson Estates Project Draft Environmental Impact Report

PDFenvironmental-impact-report

Masson Estates Draft Environmental Impact Report Notice of Availability

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Saratoga
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Saratoga
Office AddressN/A
Contacts
Christopher RiordanCity of Saratoga
Janna WaligorskiAssociate Director
William HirschmanApplicant

Interested Companies (1)

Show more
FirstCarbon Solutions
Walnut Creek, CA

Full Description

Show more
Subdivide the 72.45-acre parcel and develop 25 homes and related infrastructure in the northern 18.38-acre portion of the parcel; the southern 54.06-acre portion is not proposed for development, with the exception of an emergency access road. The proposed project would construct 20 market rate, and 5 affordable, single-family homes. The proposed homes would range from 2,375 to 7,091 square feet on lots ranging from 2,086 to 86,351 square feet. Lots 1-8 would be 2,375 square feet single-family homes with 4 bedrooms, 2 baths, and 2 car garages; of these, Lots 1-8 would be affordable units, and Lots 5-7 would be market-rate. Lots 9-25 would be market rate 4-bedroom 4-bath single-family houses of up to 7,091 square feet with 3 to 4 car garages. The proposed project would also include pavement improvements to the existing emergency access road. A total of 367 trees are proposed for removal, and would be replaced primarily by Coast live oak (Quercus agrifolia).

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details