Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Master Plan Modification 00952566-PMPC for two metal canopies and 10 new covered electric vehicle (EV) parking spaces

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Irvine is moving forward with a minor modification to install two metal canopies and 10 covered electric vehicle parking spaces at 9300 Toledo Way to serve electrical terminal trucks, with all associated charging infrastructure including charging cabinets and an electrical transformer enclosed within a chain-link fence. The project qualifies for a categorical exemption under CEQA Section 15301 as a minor alteration to an existing facility without expansion of use, streamlining approval without requiring a full environmental review. The modification, designated as Master Plan Modification 00952566-PMPC, was approved on September 22, 2025, with a posted date of September 24, 2025, and is being managed by Hansen-Rice, Inc. as the applicant and contractor. The place of performance is clearly identified as Irvine, California, with the City’s Community Development Department overseeing the project through Senior Planner Tiffany Lin, though no formal contracting officer, COR, or COTR roles are designated. There is no stated contract value, payment office details, invoicing method, or accounting codes provided, reflecting the simplified nature of the approval under state environmental law rather than a formal federal procurement process. No federal FAR clauses, evaluation factors, special requirements, or representations from the contractor are included, and the project is handled as a ministerial action with no competitive bidding, solicitation, or binding contract type outlined, relying instead on CEQA’s procedural exemptions for minor infrastructure upgrades.

General Info

Irvine installs two metal canopies and ten EV charging spaces for trucks under CEQA exemption, no formal contract.

Agency

California → City of Irvine

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Irvine, CA, 92618

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Master Plan Modification 00952566-PMPC

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Irvine
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Irvine
Office AddressN/A
Contacts

Full Description

Show more
Add two metal canopies to accommodate 10 new covered EV parking spaces for electrical terminal trucks with associated equipment for the parking spaces, including charging cabinets and an electrical transformer enclosed within a chain-link fence enclosure.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Utility Relocation ServicesThe contract titled Utility Relocation Services is a subcontract issued by the CITY OF SAN ANTONIO under NAICS code 238910 for the identification, temporary relocation, and protection of underground utilities including water, sewer, gas, and telecommunications lines during construction activities. The solicitation was posted on July 31, 2026, with a response deadline of September 4, 2026, and requires qualified contractors to ensure the safe handling and preservation of critical infrastructure throughout the construction phase. Work is to be performed in San Antonio, Texas, though specific site details are not provided, and the contractor must be prepared to coordinate with existing utility networks to prevent service disruptions and ensure public safety. The contract does not specify set-aside status or organizational type criteria, leaving it open to eligible subcontractors capable of meeting technical and operational requirements. All work must adhere to industry standards for utility protection and temporary relocation, with emphasis on precision, timely execution, and minimal impact on civic services. Interested parties must submit proposals through the Texas SmartBuy portal by the stated deadline, and successful bidders will be expected to demonstrate relevant experience, safety protocols, and capacity to manage complex underground utility environments under active construction conditions.
CITY OF SAN ANTONIO

POSTED

1 day ago

DEADLINE

in about 1 month
View Details