Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on August 10, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Masticate drainage Corridors

Awarded
RFQ-11-4389-11Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
FAC 120 - Firebreak Maintenance and Hazard Tree Removal in Nickserson State Park FY27
Solicitation # BD-27-1020-DCRFC-DC366-134921
The Massachusetts Department of Conservation and Recreation is soliciting bids for firebreak maintenance and hazard tree removal at Nickerson State Park for fiscal year 2027. The scope of work is divided into two primary tasks: the maintenance of the firebreak along Ober Road through tree removal, mulching, and mowing, and the mitigation of hazard trees throughout the park's campgrounds, internal roads, and bike paths. All work must comply with OSD Statewide Contract FAC 120, and the contractor is required to ensure that tree stumps protrude no more than two inches from the ground. Qualified bidders must provide a completed Bidder Response Form, three relevant references, and certified insurance policies for all subcontractors. Evaluation is based on the best value to the Commonwealth, considering price, equipment, safety programs, and the qualifications of onsite staff. Key requirements include a superintendent with a valid Massachusetts Certified Arborist or International Society of Arboriculture certification and machine operators holding a current Massachusetts Timber Harvester License. All equipment must meet ANSI specifications and current safety inspections. The project is subject to Department of Labor Standards Prevailing Wage Rates. Work must be performed Monday through Friday between 7:00 am and 6:00 pm, commencing within ten business days of the Notice to Proceed. Responses are due by 4:00 PM on November 17, 2026. Bidders may apply for a single task or both, though the agency reserves the right to award tasks separately. The primary point of contact for the solicitation is Casey Duggan, with Paul Gregory serving as the task manager for firebreak maintenance.
Department of Conservation and Recreation

POSTED

about 11 hours ago

DEADLINE

in 19 days
NAICS: 561730
New
SLED
Lawrence Co DHR FY27 Lawn Service
Solicitation # SRC0000037248
The Alabama Department of Human Resources Lawrence County Office is soliciting quotes for FY27 lawn services at their facility in Moulton, Alabama. The scope of work includes grass cutting services, limited to 20 cuts per fiscal year, and shrub and hedge trimming, limited to two services per year in the spring and fall. All shrub cuttings must be removed from the property, and the service excludes pine straw replacement or bed spraying. A mandatory site visit was required on October 23, 2026, and quotes from vendors who did not attend and sign in will be rejected. The period of performance runs from October 2026 through September 30, 2027, with the possibility of annual renewals for up to five years or until a total contract value of 25,000 dollars is reached. This is a Quick Quote solicitation requiring electronic submission via Alabama Buys by October 27, 2026. Award evaluation is based on price reasonableness and cost realism, and the state may request professional licenses and certificates of insurance after bid opening. Payment terms are net 30 days, paid in arrears upon completion of service. Bidders must comply with several state mandates, including E-Verify enrollment for Alabama employees, certification of Alabama state and local tax remittance per Act no. 2006-557, and confirmation that they are not engaged in boycotts of jurisdictions with which Alabama enjoys open trade. All legal disputes are subject to the jurisdiction of the City of Montgomery and the Board of Adjustment of the State of Alabama.
DHR Lawrence County Office

POSTED

about 11 hours ago

DEADLINE

in 8 days
NAICS: 561730
New
SLED
SNOW PLOWING AND/OR HEAVY DUTY SNOW REMOVAL WITH WHEEL LOADERS 2026-2027
Solicitation # 8968
The City of Waterbury is soliciting qualifications from multiple operators to provide citywide snow removal services for the 2026-2027 fiscal year. The scope of work is divided into two primary categories: snow plowing and sanding of city roads, and heavy duty trucking and snow removal utilizing wheel loaders. Services must be available from November 1, 2026, through April 30, 2027, under the direction of the Public Works Department and the Bureau of Streets. All equipment must undergo city inspection by November 20, 2026, to ensure it meets minimum standards. Plowing equipment is categorized by gross vehicle weight ranging from light duty (11,500 to 19,500 lbs) to heavy duty (33,001 lbs or greater), with established hourly rates between 90 and 250 dollars depending on the equipment type and service provided. The selection process involves a two-stage approach consisting of short-listing based on technical and managerial capabilities, equipment quality, and prior performance, followed by interviews and negotiations. Awarding is at the sole discretion of the City. Successful vendors must comply with the Federal Davis-Bacon Act, the American Recovery and Reinvestment Act of 2009, and HUD Section 3 clauses. Additionally, vendors must obtain approval from the City Risk Manager for all insurance before commencing operations and are required to use city-issued magnetic plates on all vehicles. Responses were due by November 13, 2026, and required the submission of a vendor qualification statement, vehicle information sheets, and a non-collusive affidavit.
DAS Procurement

POSTED

about 12 hours ago

DEADLINE

in 14 days

General Info

Contract Value

$25,500

NAICS

561730 - Landscaping Services

Place of Performance

21 Dunbar Road, BYRON, GA, 31008, USA

Set-Aside

SBA

Awardee

VATO LLC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Ars Sea Aao Acq/per Prop
Contacts1 person available
OfficeSTONEVILLE, MS, 38776, USA
Office AddressSTONEVILLE, MS, 38776, USA
Contacts
Thomas D. MazePurchasing Agent

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. The solicitation number RFQ-11-4389-11 is issued as a request for quotations and incorporates provisions and clauses that are in effect through FAC 97-09. FAR 52.219-6 Notice of Total Small Business Set-A-Side is applicable to this acquisition. The NAICS code is 561730. The small business size standard is 500 employees. Mechanical Mastication of Trees and Vegetation With-in Drainage Corridors 2011 USDA-ARS Byron, Ga. 1.0 Introduction Trees and shrubs growing within ditches created drainage problems within the ditch drainage systems at the Southeastern Fruit and Tree Nut Research Station in Byron, Ga. Additionally, dead trees, limbs and other debris have built up at points along the ditches enough to cause damming and restricted flow. These ditches were created between 1955 and 1965 and have received little maintenance over the past 20 years. The intent of this solicitation is to mechanically remove trees, vegetation and debris impeding proper drainage via mastication, and to do so in a manner that causes minimal land disturbance and maintains original ditch configurations. 2.0 Statement of Work The Contractor shall provide all labor, equipment, transportation, supervision and any other items necessary to mechanically masticate trees, felled limbs and woody vegetation within and along the bed and banks of the designated drainage ditch systems at the USDA Southeastern Fruit and Tree Nut Research Station in Byron, Ga. The work shall be completed in accordance with the provisions of this contract outlined in the following sections. 3.0 Contractor Responsibilities 1.1 The Contractor shall have a designated site representative who is readily available on site each day that work is being performed. 1.2 The Contractor shall furnish and maintain sufficient personnel, equipment and accessories to perform the work in a timely manner. 1.3 The Contractor shall be actively registered in Central Contractor Registration (ccr.gov) and Online Representations and Certifications Application (orca.gov). 1.4 The Contractor shall be insured in the State of Georgia and possess a Certified Arborist Certification from the International Society of Arboriculture (ISA). 1.5 The Contractor shall comply with all Federal, State and local laws, ordinances and codes related to the execution of this work. 1.6 The Contractor shall comply with all standards contained in ANSI A300 and ANSI Z133 relating to safety and work practices in the execution of this work. 1.7 The Contractor shall maintain a clean work area. All trash originating from the Contractors operations shall be picked up and properly disposed of daily. 1.7 Work hours for this project shall be from 7:00 am to 5:00 pm est., Monday through Friday, except on Federal Holidays. No overtime work will be allowed 4.0 Principal Features of Work The work to be performed includes, but is not limited to, the following principle features: 4.1 Mechanical Mastication of Trees, Felled Limbs and Woody Vegetation A. All trees, felled limbs and woody vegetation within the drainage ditch corridor shall be mechanically masticated to the ground. Stumps and vegetation roots shall be left flush to the ground keeping the side slopes and ditch bottoms intact. B. All limbs from trees adjacent to the drainage ditch corridors that protrude into the corridors at a height of 10 feet or less shall be pruned off and masticated to allow passage of maintenance equipment. 4.2 Erosion Control A. All chippings created by mastication of trees and vegetation within the drainage corridors shall be spread evenly over bare ground surfaces within and along the side slopes of the drainage ditches. B. Each day, the Contractor shall re-seed with Bahia grass and cover with straw mulch any bare ground surfaces remaining within the drainage corridors disturbed by that days work activities. 4.3 Access A. Access to the drainage systems will be determined by the C.O.R. This will be limited to established roads and areas within or adjacent to the drainage corridors on either side. Driving vehicles and equipment through research plots and across orchards will not be allowed. 5.0 Equipment 5.1 Self propelled mechanical masticators of the rubber tired, skid steer or excavator style shall be used for masticating within the ditch corridors. 5.2 All mechanical masticators used shall be first quality, in good operational condition, and designed for the particular operation for which they are to be used. 5.3 All mechanical masticators used shall be heavy duty, commercial quality and equipped with factory installed shields. 6.0 General Information 6.1 All major, minor ditches and swales that interconnect in their respective drainage system shall be included as part of the necessary work for that drainage system. 6.2 Mechanical mastication of vegetation within the ditch corridors shall be done when ditches are dry. The Contracting Officer reserves the right to suspend mastication operations during periods of inclement weather or when saturated ground conditions cause unnecessary rutting of the ditch bottoms or side slopes. 6.3 The work contained within this solicitation covers two separate drainage systems at the Byron Location. These drainage systems are designated as Drainage System 1 and Drainage System 2 on the attached drawing. A. Drainage System 1 - This system is comprised of 3 ditches that interconnect to form a single system. The total ditch width, depth and grade of side slopes vary along the system corridors. Work covered by this solicitation requires mastication of approximately 6200 linear feet of this drainagesystem. B. Drainage System 2 - This system is comprised of a single ditch that also varies in width, depth and side slope. Work covered under this solicitation requires mastication of approximately 1100 linear feet of this drainage system. 7.0 References ANSI - American National Standards Institute CCR - Central Contractor Registration- (ccr.gov) ISA - International Society of Arboriculture ORCA- Online Representations and Certifications Application- (orca.gov) 8.0 Definitions C.O. - Contracting Officer - Federal Government employee with the sole authority to enter into, administer, and/or terminate contracts and make related determinations and findings. C.O.R. - Contracting Officers Representative - A Government official appointed by the Contracting Officer to provide daily administration and surveillance of a Federal Government Contract. Drainage corridor - The full length, width and depth of individual drainage ditches and swales. Drainage System - The combination of all individual drainage corridors into a single system providing drainage to a specific geographic region. Mastication - On-site pulverizing or chopping of standing trees, logs and vegetation into small particles. Swale - A low tract of marshy land. Job MUST be completed in 60 Days. Service Contract Act will Apply. Estimated Cost $25000-$35,000 JOB SHOWING will be September 1, 2011 at 2:00 PM Call for SF18 and Drawing Delivery shall be FOB Destination. Evaluation of quotations will be made based on price and specifications. The government anticipates award of a contract resulting from this solicitation to the responsible offeror whose offer conforming to the specifications will be most advantageous to the government. PAYMENT: Any award made under this solicitation is subject to 31 CFR Part 208 which requires all payments made by the government to be made by electronic transfer. This solicitation incorporated the following FAR clauses, provisions and addendums: 52-204-7 Central Contractor Registration - To win an award, vendor MUST be registered. 52-212-1 Instructions to Offerors-Commercial item. 52-212-3 Offeror Representations and Certification-Commercial items: Completed the annual representations and certifications electronically at http://orce.bpn.gov. 52-212-4 Contract Terms and conditions-commercial items: 52-212-5 Contract Terms and Conditions required to implement statues or executive orders-commercial items. In paragraph (b) of 52.212-5, the following apply: 52.222-35 Equal Opportunity, 52.236-7 Permits, 52.236-12 Clean-up, 52.246-12 Inspection, 52-249-1 Termination, 52.222-50 Trafficking, 52.233-3 Protest, 52.233-4 Breach of Contract, 52.219-6 Small Business, 52-219-28 SB Rerepresentation, 52.222-3 Convict Labor, 52.222-19 Child Labor, 52.222-21 Prohibition, 52.222-22 Previous contracts, 52.222-26 Equal Opportunity, 52.222-36 Affirmative Action, 52.233-15 Energy Efficiency 52.223-16 IEEE 1680, 52.225-3 Buy American, 52.232.33 Electronic Payment, 52.225-13 Restrictions, 52.225-33 . The contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided such warranty is available at no additional cost to the Government. Acceptance of the standard commercial warranty does not waive the Government's rights under the Inspection clause nor does it limit the Governments's rights with regard to the other terms and conditions of this contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty. The contractor shall provide a copy of its standard commercial warranty (if applicable) with its response. Responses are 30 days from the date this notice is published in the FedBizOps by 4:00 PM local time, September 12, 2011at USDA Agricultural Research Service, 2316 Rainwater Rd, Tifton, GA 31794 (or POB 748, Tifton, GA 31793). POC Tom Maze, Contract Specialist, +1 (555) 000-0000 or FAX +1 (555) 000-0000. The Government shall award a contract resulting from this solicitation to the responsive/responsible offeror whose offer conforming to the solicitation will be most advantageous to the government per FAR 13.106-2. .

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS