Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Matsushima JASDF Base Storage Shelter

Closed
FA502526RB006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Solicitation FA502526RB006 is a design-build construction project for the 356th Expeditionary Theater Support Group to deliver four 450 square meter membrane-sheltered pre-engineered buildings for warehouse storage at Matsushima JASDF Base, Japan. The project includes the design and construction of the buildings, underground utilities, paving, storm drainage, and fencing, with an estimated value between 1,000,000 and 5,000,000 USD. The contract is a firm-fixed-price arrangement with a performance period requiring a start within 40 calendar days and completion within 294 calendar days after award. A critical mandatory requirement is that the prime contractor or lead entity of a joint venture must hold a valid Japanese Construction License at the time of proposal submission; failure to provide proof of this license results in an automatic fail. The proposal deadline was extended via Amendment 0002 to September 16, 2026, at 0000 GMT. The government will use a Best Value Trade-off source selection methodology where technical factors are significantly more important than price. Proposals must be submitted in two volumes: a technical proposal limited to 20 pages and a price proposal limited to five pages. Notably, Amendment 0002 removed the requirement for a bid bond or guarantee and updated the Statement of Work to Revision 8.

General Info

Design-build membrane shelter in Japan, $1-5M value, requires Japanese Construction License by 9/11/26.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Higashimatsushima, JP-04, 981-0503, JPN

Set-Aside

NONE

Documents

12

Amendment 0001 to Solicitation FA502526RB006

PDF, High priority: read this firstamendment
High

Construction Drawings for RPCP Storage Pavement Area, Matsushima Air Base

PDF, High priority: read this first9 pages · drawings
High

FA502526RB006 Amendment 0002

PDF, High priority: read this firstamendment
High

PMWH26-3531 Construct RBCP Storage Site SOW

PDF, High priority: read this first19 pages · sow
High

PMWH26-3531 Construct RBCP Storage Site Statement of Work Rev 5

PDF, High priority: read this first19 pages · sow
High

RFI Responses for Solicitation PMWH26-3531 Matsushima Project

XLSX, High priority: read this first25 pages · rfi
High

RFIs-FA502526RB006 August Updates

XLSX, High priority: read this first25 pages · q-and-a
High

Solicitation FA502526RB006 - Matsushima Membrane Shelter Design-Build

PDF, High priority: read this firstrfp
High

Japanese Surface Transition Drawing

PDF, Low priority1 page · other
Low

Matsushima Site Plans (21AUG26)

PDF, Low priorityother
Low

Matsushima Site Plans Annotations (21AUG26)

PDF, Low priority1 page · other
Low

Updated Site Plans and Drawings 12 Aug 26

PDF, Low prioritydrawings
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 11, 2026 to Sep 16, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5025 356 Eceg Pk
Contacts2 people available
OfficeAPO, AP, 96543, USA
Office AddressAPO, AP, 96543, USA
Contacts
SSgt Cameron Smith
Daniel Callahan

Full Description

Show more

Amendment 0002 Correction- RFI reponses were not included with Amendment 0002. Added to attachments, [RFIs-FA502526RB006 (27 Aug Updates)]
Amendment 0002- The purpose of this Amendment is to:
-Extend the proposal due date from 11 September 2026 to 16 September 2026 at 0000GMT / 0900JST
-Update Requirement Description text
-Remove requirement for Bond/Guarantee
-Update RFI responses with further clarifications (2 clarified responses. Highlighted Yellow)
-Add or Replace Updated Section J Attachments:
     -Replace previous SOW (Rev5) with updated revision 8
     -Add updated Drawings (Drawing labeled "########" on SF30 is labeled "Transfer Surface Drawing" on SAM. Original Document name is "米軍工事転移表面")


All other terms and conditions remain the same.



Amendment 0001- The purpose of this amendment is to provide the responses to all RFIs submitted by the August 21st deadline. Additional questions will only be accepted if they relate directly to one of the government responses. Follow-up questions must be submitted by August 28th, at 1200 JST. As of now, there will not be an extension in the proposal submission deadline.


If an updated SOW and drawings are not provided before the deadline, the answers in the RFIs will take precedence over any conflicting information within the documents.


All other terms and conditions remain the same.



Amendment 0: Due to internal system issues, this amendment will be considered "Amendment 0" for acknowledgement of amendments on block 19 of the SF 1442. We apologize for the inconvenience.
Amendment details - Correction in response to RFI. "Block 13.b of the SF 1442" requires a bid bond/guarantee. Disregard this, as a bid bond/guarantee is not required for this requirement.



The 356th Expeditionary Theater Support Group (356 ETSG/CONS) Contracting Office is posting this solicitation for a design-build construction project to deliver a membrane shelter at Matsushima Japan Air Self-Defense Force (JASDF) Base, Japan.


Complete project requirements, technical specifications, and performance parameters are detailed in the attached draft Statement of Work (SOW) and corresponding project drawings.


  • Project Magnitude / ROM (Rough Order of Magnitude): Between $1,000,000 and $5,000,000 USD.



⚠️ SPECIAL NOTICE: MANDATORY JAPANESE LICENSING REQUIREMENT


In accordance with Japanese Construction Industry Law (Law No. 100 of 1949), the Prime Contractor (or the lead entity of a joint venture) MUST hold a valid Japanese Construction License at the time of proposal submission.


  • No Subcontracting of License: To ensure direct performance accountability and robust contract administration, the offering Prime Contractor itself (or the lead entity of a Joint Venture) must hold this license. Relying on a subcontractor's Japanese Construction License to satisfy this requirement is prohibited.

  • Compliance: Offerors must submit proof of the Prime Contractor's license with their technical proposal. Sub-contracting a company with the license will not be permitted.

  • Evaluation: This is a strict pass/fail threshold requirement. Proposals from prime vendors who do not hold this license or cannot demonstrate legal compliance with Japanese construction licensing laws will be determined non-compliant and excluded from evaluation.



1. Critical Acquisition Milestones & Deadlines


Please review the timeline below carefully. Late submissions or questions will not be entertained unless explicitly authorized by the Contracting Officer. All times are in Japan Standard Time (JST).


  • Site Visit (Completed): An organized pre-solicitation site visit was held on 05 August 2026. No secondary or additional site visits will be hosted.

  • Additional RFI Deadline: 21 August 2026 @ 09:00 AM JST. Additional RFIs must be sent via email to both designated POCs (see below) by this deadline to be answered.

  • RFI Responses Posted: The government's RFI responses will be posted as an amendment to this notice no later than 24 August 2026.

  • Proposal Submission Due Date: 11 September 2026 @ 09:00 AM JST.



2. Important Submission & Evaluation Instructions


  • Request for Information (RFI) Ground Rules: Resulting from the August 5th site visit, RFIs were submitted and are currently in the process of being answered. Once the formal RFI responses are posted on August 24th, additional questions will only be accepted if they relate directly to one of the published government responses. This process may result in an extended proposal submission window, but does not guarantee additional response time.

  • Proposal Due Date Clarification: Please ignore any system-generated defaults on SAM.gov or within the SF 1447 block that state "00:00 local time" as the submission deadline. The official, legally binding deadline for proposal receipt is September 11th, 2026, at 09:00 AM JST.

  • Evaluation Guidelines: The full SF 1447 solicitation document contains all guidelines for proposal submission (Section L) and the evaluation factors for award (Section M). These instructions and evaluation factors will only be amended to correct clerical errors or clear up misunderstandings.



3. Contact Instructions


Please direct all questions, RFIs, and final proposal submissions* via email to both of the following Points of Contact:


  • SSgt Cameron Smith: cameron.smith.16@us.af.mil

  • SSgt Daniel Callahan: daniel.callahan.7@us.af.mil


* For submissions over 10mb, they will not be accepted by our internal e-mail security measures. Offerors must submit a request for a DoDSAFE link to submit their proposals no later than 48hrs before submission deadline.

More opportunities from Department Of Defense → FA5025 356 Eceg Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS