Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

McCorkle Creek Detention Structure Phase 2

Closed
2926State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; construction and utility tasks including tunneling, boring, jacking, and cathodic protection; and surface improvements such as asphalt paving, lighting, and landscaping. Additionally, the project requires various materials and support services, including ready mix, precast concrete, traffic control, and storm water pollution prevention. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a bid submission deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
CSAH 102 (Douglas Drive) Safety Improvements
Solicitation # 2211300
The CSAH 102 (Douglas Drive) Safety Improvements project, administered by Hennepin County and the Minnesota Department of Transportation under state project number 027-702-003, involves comprehensive infrastructure work including grading, bituminous surfacing, ADA improvements, and signal system revisions. The scope of work requires the contractor to provide all necessary labor, materials, and equipment to complete the project in accordance with the Department of Transportation Standard Specifications for Construction, 2025 Edition. Key deliverables include as-built feature survey memorandums, drainage and signal system mark-up plans, and professional surveyor certifications. Technical requirements include specific grounding electrode system standards and strict labeling for epoxy-coated bars. Contract administration is governed by a combination of quality control performed by the contractor and quality assurance managed by the agency, with electrical and traffic signal systems requiring certification by the Project Engineer. Financial and legal protections include a required bid bond of 5% of the bid total, as well as payment and performance bonds equal to the contract amount. Bidders must comply with prevailing wage laws, EEO regulations, and provide a Disadvantaged Business Enterprise certification. Proposals must be submitted electronically via the ProcureWare website, with specific requirements for non-collusion declarations and responsible contractor certifications. The contract also includes provisions for cost and fuel escalation and mandates that construction surveyors meet all MnDOT 1508 requirements.
Hennepin County

POSTED

about 24 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (PW# 2025-074) is a federally funded infrastructure initiative managed by the Seattle Department of Transportation. The project focuses on improvements to Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. The scope of work includes planing asphalt overlay, removing and replacing concrete panels and base repair, realigning the intersection at NE 113th Street, and installing curb bulbs at NE 114th Street and NE 115th Street. Additional requirements involve the installation of ADA-compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000. The contract is awarded to the lowest responsive bidder, with proposed recycling percentages serving as a tie-breaker. Bidders must comply with FHWA regulations, including Buy America requirements and a 13% Federal Small Business Enterprise (FSBE) goal. Performance is governed by the 2026 City of Seattle and WSDOT Standard Specifications. Key administrative requirements include a bid guaranty of 5% of the total bid and the provision of payment and performance bonds. Contractors are responsible for quality control and must coordinate specific inspections, such as those required by KC Metro for shelter footings. Bids are submitted via the OpenGov portal or by hard copy to the City of Seattle.
Public Works

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract involves a comprehensive construction project at the McCorkle Creek Detention Structure in Washington, aimed at enhancing flood control infrastructure. The scope includes raising an existing earthen detention structure by approximately 15 feet, and constructing a reinforced concrete spillway measuring about 200 feet in length and 75 feet in width. Additionally, the project entails building a reinforced concrete slide gate structure, a low flow inlet, and flow control outlet structures, all made of reinforced concrete. The work also involves installing approximately 305 linear feet of 48-inch ductile iron pipe, 125 linear feet of 12-inch HDPE pipe, and about 1,500 linear feet of gravel access roads. Other key components include plugging and abandoning 160 linear feet of existing storm pipe, installing chimney drains, staff gauges, erosion and water pollution controls, and restoring the site upon completion. The entire construction effort must be completed within 400 working days, with a contract value estimated between five and ten million dollars. Bidders are invited to submit sealed bids by November 18, 2025, following a mandatory pre-bid meeting scheduled for October 28, 2025. The project is managed by Cowlitz County under the NAICS code 237310, which pertains to water and sewer line and related structures construction. The detailed contract documents include technical specifications, bid forms, legal declarations, and appendices with permits and reports, ensuring comprehensive guidance for the successful execution of the project. The project aims to improve flood mitigation capacity and water management infrastructure, aligning with local and regional safety and environmental standards.

General Info

Documents

14
PDF, High priority: read this first2 pages · rfb
High
DOCX, High priority: read this firstsow
High
DOCX, High priority: read this firstrfq
High
DOCX, High priority: read this firstrfq
High
DOCX, High priority: read this firstrfq
High
DOCX, High priority: read this first9 pages · contract-document
High
PDF, High priority: read this first1 page · checklist
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfq
High
DOCX, Low prioritypast-performance
Low
DOCX, Low priority1 page · other
Low
DOCX, Low priority3 pages · other
Low
PDF, Low priority533 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

9 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Sep 3, 2024 to Apr 24, 2024. The notice title changed. NAICS code changed from 811210 to 541519. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Apr 24, 2024 to May 9, 2024. The notice title changed. NAICS code changed from 541519 to 423860. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from May 9, 2024 to Jun 20, 2024. The notice title changed. NAICS code changed from 423860 to 333924. The notice description changed.

Notice updated

Response deadline changed from Jun 20, 2024 to Jul 9, 2024. The notice title changed. NAICS code changed from 333924 to 238110. The notice description changed.

Notice updated

Response deadline changed from Jul 9, 2024 to Nov 1, 2024. The notice title changed. NAICS code changed from 238110 to 541512. The notice description changed.

Notice updated

Response deadline changed from Nov 1, 2024 to May 22, 2025. The notice title changed. NAICS code changed from 541512 to 541310. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from May 22, 2025 to Aug 4, 2025. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 4, 2025 to Aug 21, 2025. The notice title changed. NAICS code added: 541690. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Aug 21, 2025 to Nov 18, 2025. The notice title changed. NAICS code changed from 541690 to 237310. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Cowlitz County
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → Cowlitz County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Providing all materials and labor to raise the existing earthen detention structure approximately 15-feet and construct an approximately 200 foot long by 75 foot wide reinforced concrete spillway, a 12-foot x 10-foot by 40-foot tall reinforced concrete slide gate structure, reinforced concrete low flow inlet structure, reinforced concrete flow control outlet structures, 305 linear feet of 48-inch diameter ductile iron pipe, approximately 1,500 linear feet of gravel access road, 125 linear feet of 12-inch diameter HDPE pipe, plug and abandon 160 linear feet of existing 36-inch storm pipe, chimney drains, staff gauge, erosion and water pollution control, site restoration, and all other work as specified herein and as shown on the drawings. All construction work is to be completed within 400 working days.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS