This Solicitation opportunity from Georgia was posted on January 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
McIntosh Co. Industrial Development Authority- WSI: Deep Well
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive installation work including erosion and sediment control facilities, approximately 350 linear feet of 18-inch C900 DR 18 PVC water main, one fire hydrant assembly, pavement removal and replacement, and connection to existing water mains along with necessary appurtenances. Additionally, the project requires the installation of a 1250 GPM deep well pump, associated chlorine equipment, a pump house, electrical components, meter, piping, a telemetry system, and other related appurtenances. Bids for this contract will only be accepted from licensed well drillers in the State of Georgia. Compliance with the Build America, Buy America (BABA) Act and all relevant rules and waivers is mandatory where applicable, particularly concerning any funds obligated by HUD after specified dates unless a waiver is granted. The solicitation is issued by the McIntosh County Industrial Development Authority in Georgia, with a response deadline of March 4, 2026. For additional details or communications, the primary contact is JamieLynn Harris, reachable via the provided email.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
- Lift Station No. 85 ReplacementOpen now, due in 23 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Installation of erosion and sediment control facilities, ±350 LF 18¿ C900 DR 18 PVC water main, ± 1 fire hydrant assemblies, pavement removal and replacement, connection to existing water mains, and appurtenances. Installation of one (1) 1250 GPM Deep Well pump, chlorine equipment, pump house, electrical items, meter, piping, telemetry system, and associated appurtenances. Bids will only be accepted from well drillers licensed by the State of Georgia. All requirements of the Build America, Buy America (BABA) Act, 41 USC 8301 note, and all applicable rules and notices, as may be amended, shall be complied with if applicable to the infrastructure project. Pursuant to HUD¿s Notice, ¿Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance¿ (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
