McNary Intake Gates and Isophase Bus Systems

Closed
W912EF21R0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 17 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 17 hours ago

DEADLINE

in about 13 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 17 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 22 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Umatilla, OR, 97882, USA

Set-Aside

NONE

Documents

22

W912EF21R0015 - McNary Lock & Dam Plans

PDF, High priority: read this firstspecifications
High

A.02.05+MNA+Intake+Gates++Isophase++JA+for+Oil+Analysis+%281%29.pdf

PDF

A.03.10+JA+for+sole-brand+disconnect+switches+%281%29+%281%29.pdf

PDF

A.03.10+MNA+McDouble+Vinyl+Paint+J%26A.pdf

PDF

Amend+0004++W912EF21R0015.pdf

PDF

Amend+0006+W912EF21R0015.pdf

PDF

Amend+0007+W912EF21R0015+McNary+Intake+Gates+and+Isophase+Bus+Systems.pdf

PDF

Amend+0008+W912EF21R0015.pdf

PDF

Amendment+0001+W912EF21R0015.pdf

PDF

Amendment+0005+W912EF21R0015.pdf

PDF

Amendment+0009+W912EF21R0015.pdf

PDF

B.08.03+Plans_21R0015_McDouble_amd0009.pdf

PDF

Offeror+Experience+Form.docx

DOCX

Offeror+Experience+Form.pdf

PDF

Site+Visit+Attendee+List+McNary+Intake+Gates+and+Isophase+Bus+Systems+W912EF21R0015.pdf

PDF

Vol1_21R0015_Resource_Plans.pdf

PDF

Vol2_21R0015_Plans.pdf

PDF

Vol2_21R0015_Resource_Plans_Part1.pdf

PDF

Vol2_21R0015_Resource_Plans_Part2.pdf

PDF

W912EF21R0015+Amend+0002.pdf

PDF

W912EF21R0015+Amendment+0003.pdf

PDF

W912EF21R0015+McNary+Intake+Gates+and+Isophase+Bus+Systems+Solicitation.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

14 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from Aug 27, 2021 to Aug 5, 2021. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Aug 5, 2021 to Aug 19, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Aug 19, 2021 to Aug 26, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Aug 26, 2021 to Sep 9, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more
Please note, the solicitation is posted to this notice. A separate soliciation notice will not be posted. Construction Contract: McNary Intake Gates and Isophase Bus Systems The work is located at the McNary Dam located in Umatilla County near Umatilla, Oregon. The work consists of the following major elements: SPECIFIC REQUIREMENTS FOR INTAKE GATES SYSTEM: Background Information: The 14 main generating units (MU) and 2 station service units (SSU) at McNary utilize hydraulically operated intake gates. Each main unit has three intake gates and each station service unit has one gate. There is also one spare gate that normally resides in the gate repair pit. All gates are interchangeable between operating positions between main units/station service units. All gates utilize the same overall operating and control systems. Each intake gate is supported in its operating position by a support beam which rests on retractable dogs that are installed on the intake gate slot. The intake gates are connected to the support beams through two hydraulic cylinders. Flexible hoses connect the hydraulic cylinders to the hydraulic system which is located in a gallery within the dam. Each unit is controlled by a manually operated control console that integrates the distribution manifold and valving for controlling the gates. The 16 manual control consoles are connected to supply and return headers that run the length of the powerhouse. Pressurized oil is supplied by a single HPU that is connected to the supply header and there are 4 hydraulic oil storage tanks connected to the return header. Summary of Work: The work covered by this contract for the intake gate portion includes the following: Rehabilitate 45 intake gates including work to replace the seals, seal bars, seal hardware, replace anodes, and perform touch up painting. Inspect sealing bar surfaces for 44 intake gate slots. Provide 90 new hydraulic cylinders for 45 intake gates. Provide two additional cylinder assemblies that will be placed into long term storage as spares. Provide 45 new support beams for 45 intake gates. 5. Provide a new hydraulic power unit, including new motor starters, breakers, and other electrical and control components. 6.. Provide new high and low pressure hydraulic fluid header piping system 7. Provide new flexible hose assemblies for 44 intake gate slots. 8. Provide 14 new main unit control consoles and 2 station service unit control consoles, inclusive of all new electrical and control components. 9. Replace the accumulator tanks located at the control console for each unit. Add one additional accumulator tank per unit to provide back-up mechanical energy storage. 10.Provide approximately 26,000 gallons of new hydraulic fluid 11.Rehabilitate the existing oil storage tanks and transfer piping. 12. Rehabilitate the existing gate position indicating system. 13. Inspect and rehabilitate gate dog system, including replacing components, for 44 intake gate slots. 14. Add emergency gate closure switches to the control room main unit switchboards. 15. Provide cable and conduit for system power, controls and annunciation. 16. Remove and dispose of existing: Intake gate seals, seal bars, anodes, and hardware 90 hydraulic cylinders 45 support beams Hydraulic power unit High and low pressure headers Flexible hose assemblies for 44 intake gate slots 14 main unit control consoles and 2 station service unit control consoles Approximately 26,000 gallons of hydraulic fluid. Electrical and control equipment associated with the above items 17. Provide as-built drawings, operations manual, training, and operations and maintenance manual, and spare parts as specified. SPECIFIC REQUIREMENTS FOR ISO PHASE SYSTEM: Background Information: Each of the 14 generating units at McNary powerhouse are currently rated 74MVA. The generators send power at 13.8kV (medium-voltage) to the generator step-up (GSU) transformer banks through the isolated-phase bus, or isophase bus, via the main unit circuit breakers inside the powerhouse. The existing indoor three-phase runs of isophase bus from the generators to EL. 346.0 is rated 4,000A. In the EL. 333.0 gallery, the three-phase configuration changes to single-phase configurations in what is called the delta bus. The existing single-phase runs of 2,500A isophase bus runs up through the transformer deck using transition bushings, and becomes outdoor 2,500A isophase bus to each single-phase transformer in the GSU transformer bank. The GSU transformers send 115kV and 230kV power (high voltage) through 2 tubular aluminum bus to steel latticework takeoff towers. From the towers, power is delivered through aerial conductors (Lines 1 through 6) to the BPA switchyard. The work covered by this contract for the isophase bus systems portion includes the following: Replace existing 15kV 4,000 amp copper isophase bus including in-line current transformers and 2,500 amp copper delta isophase bus with new 15kV aluminum isophase bus rated 5,000 amp including in-line current transformers and new aluminum delta isophase rated 3,000 amp from the main unit generator barrels to the GSU transformer banks. All bus must be able to pass through existing floor openings. The GSU transformer banks must be partially moved out of their vaults, requiring temporary removal of the radiators, then reinstalled, moved back in place and tested under supervision of an approved field engineer to facilitate isophase bus replacement. Replace seven existing 15kV 3-phase synchronizing potential transformer cubicles with potential transformers with fourteen new 15kV 3-phase synchronizing potential transformer cubicles with potential transformers, complete with wiring. Replace the existing 230kV tubular aluminum bus segments that are cracked at Lines 1 through 4 with new reconfiguration, including slip fittings. Replace seven existing manual group-operated disconnect switches and six manually-operated ground switches with seven new motorized group-operated disconnect switches (MOD's) equipped with surge resistors and seven manual ground switches, including Kirk key interlocks, electrical interlocks, and GDACS status indications. The first six sets of switches are 230kV, the seventh set of switches is 115kV. The first five 230kV disconnect/ground switches have larger than standard phase spacing requiring each phase to be mounted separately. Provide 480 volt - 240/120 volt step-down transformers and 120 volt load centers (mini-power centers) at existing 480 volt motor control centers (MCC's) to provide power and control for the new MOD's. Provide new 2-pole 480 volt breakers in the MCC's to power the step-down transformers. Presume a new bucket will be required, field verify and match existing. Provide new wire and cable connections to existing pistol grip control switches with red and green position indication lights for the seven new MOD switches, both locally at each S board and in the Control Room on the SC board. The pistol grip control switches will be supplied and installed by others but not wired. Replace the 115kV and 230kV surge arresters on the deck behind the GSU transformers. Perform field acceptance testing and commissioning of the seven transformer banks and all new installed equipment. Provide as-built drawings, operations manual, training, and operations and maintenance manual, and spare parts as specified. Optional draining of an entire transformer tank in the event of a radiator isolating valve failing while draining the radiators for transformer movement. The work covered by this contract will be subject to the following work area and schedule restrictions: The period of performance is estimated from December 2021 to May 2030 Overall schedule adherence will be critical as this work will require main generating unit outages which must be minimized to avoid lost generation. Work windows (unit outage windows) will be approximately 6 months out of each year. Two generating units (3 intake gates each) will be taken out of service at a time during each outage window. Work on the isophase systems and the intake gates for the two units will occur simultaneously. Work requiring a unit outage will not be allowed outside the specified unit outage windows. The first unit outage window is currently scheduled to occur in 2023 with the last outage window in 2029. Work that doesn't require a main unit outage (e.g. overall hydraulic system, overall control system, intake gates for station service units, spare intake gate) may be performed outside of the 6-month unit outage windows. Portions of the work for both the isophase systems and the intake gates will occur in the same general areas on the intake deck, Scheduling and coordination for access in this area will be essential. Rehabilitation of the intake gates will occur on-site in the gate repair pit (which can accommodate a single gate at a time). The Government will perform all required physical moves of intake gates/bulkheads/fish screens facilitate the intake gate rehabilitations. All work is expected to be completed in early 2030. Performance and payment bonds will be required for the entire effort but may be permitted to be on per unit, - rolling basis. . The magnitude of the project is estimated to be between $25,000,000 and $100,000,000. Sustainability requirements will be contained in the solicitation and resulting contract. The source selection process will be conducted as a best value trade-off, as defined in FAR Part 15.101-1. The resulting contract will be Fixed Price. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. Solicitation documents for the Request for Proposal No. W912EF21R0015 will be posted to the Beta.sam.gov website on or about June 2021 under this notice titled presolicitaion notice. The proposal due date will be contained in the solicitation and any solicitation amendments that may be used. The solicitation is to be competed as unrestricted. The small business size standard for NAICS Code 237990, Other Heavy and Civil Engineering Construction, and the associated small business size standard is $39.5 MIL in average annual receipts. A site visit will be offered approximately 2 weeks after the solicitation is posted. Refer to the solicitation for details regarding the site visit. Only one site visit is expected to be offered. Important Note: The Beta.sam.gov response date listed elsewhere in this synopsis is for the Beta.sam.gov archive purposes only. It has no relationship to the actual proposal submission date. The proposal submission date will be contained in the solicitation and any solicitation amendments that are issued. When issued, the solicitation documents for this project will be available via Beta.sam.gov. NO CD's OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking the referenced page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to Beta.sam.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the - Add Me To Interested Vendors button in the listing for this solicitation on Beta.sam.gov. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires a minimum of 4 weeks; therefore, clearance should be requested immediately. To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that they were legally admitted into the United States and have authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to hillary.a.morgan@usace.army.mil and karlyn.k.holland@usace.army.mil. Foreign nationals must have received clearance prior to being granted access to the project site.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA002
The US Army Corps of Engineers, Walla Walla District, is soliciting a firm fixed price contract for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project requires the contractor to provide all personnel, materials, equipment, and supervision necessary for the pickup, dry-blast cleaning to white metal, weld repair, and new coating application of the bulkheads. The work must be performed in accordance with strict industry standards, including AWS D1.1 for welding and SSPC SP 5 / NACE No. 1 for surface preparation. Deliverables are scheduled across multiple units, with specific return dates such as January 23, 2027, for Unit 4 and April 19, 2027, for Unit 5. The contractor must be a certified SSPC QP 3 painting contractor or hold an AISC Complex Coatings endorsement and provide a third-party certified coatings inspector at the SSPC-PCI Level 2 or NACE CIP Level 2. Quality assurance is paramount, requiring detailed inspection reports for each bulkhead and the use of magnetic flux thickness gages per ASTM D7091. The government reserves the right to conduct quality assurance inspections at the contractor's facility. Proposals are due by October 30, 2026, and will be evaluated based on price and other factors to determine the most advantageous offer. All shipping is required to be FOB destination to the Dworshak Project Office in Ahsahka, Idaho.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

5 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS