Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Mead Valley Booster Pump Station Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mead Valley Booster Pump Station Project, managed by the Eastern Municipal Water District in Riverside County, California, involves the construction of a new booster pump station on APN 317-050-025 to replace an existing facility on APN 317-060-043. The project aims to increase system capacity and reliability through the installation of a masonry block building housing a generator room, electrical room, and pump station room. The facility will feature three pumps with the capacity for a fourth, an 18-inch diameter cement mortar lined suction header, and associated on-site piping and paving for access. Additionally, the scope includes the installation of approximately 2,200 linear feet of 18-inch diameter potable water transmission pipeline along Decker Road and Cajalco Road, and 640 linear feet of suction piping to connect the station to the existing Cajalco Water Tank. Upon completion, the old pump station will be removed, and existing pipelines will be either abandoned or kept in service. The project is scheduled for performance from January 2, 2025, through July 7, 2026, encompassing phases for clearing, grading, utility installation, and paving. Technical requirements include adherence to the 2019 California Building Code, ASCE 7-16, and ACI 318, with specific mandates for hard rock excavation capabilities and Cal-OSHA compliant shoring. Environmental compliance is a primary focus, with a Mitigated Negative Declaration issued under CEQA to address impacts on biological, cultural, and tribal resources. The contractor must comply with SCAQMD air quality rules and maintain restricted work hours between 6:00 a.m. and 6:00 p.m. to meet noise regulations. Oversight is provided by the Eastern Municipal Water District, with geotechnical and environmental support from Atlas Technical Consultants and RECON Environmental, Inc.

General Info

Construct new booster pump station in Riverside County with new pipelines, paving, and infrastructure, replacing existing facility by July 2026.

Agency

California → Eastern Municipal Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Southeast of the intersection of Decker Road and Marquez Road, within the rights-of-way of, CA, 92570

Set-Aside

NONE

Documents

(4)

Draft Initial Study/Mitigated Negative Declaration for Mead Valley Booster Pump Station Project

PDFinitial-study-mnd

Mead Valley Booster Pump Station Project Summary

PDFenvironmental-summary

Mead Valley Booster Pump Station Project Notice of Completion

PDFnotice-of-completion

NOI Mead Valley Booster Pump Station Project

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Eastern Municipal Water District
Office AddressN/A
Contacts
Joseph BroadheadPrincipal Water Resources Specialist
Morgan WeintraubAssociate Project Manager

Interested Companies (1)

Show more
RECON Environmental
San Diego, CA

Full Description

Show more
The proposed project would construct the proposed BPS on the northwest portion of APN 317-050-025 (proposed BPS site) to replace the existing BPS located on APN 317-060-043 (existing BPS site). The proposed BPS would increase pumping capacity to provide system capacity/reliability. Proposed BPS components include a generator room, electrical room, and pump station room. The proposed BPS would include three pumps, with provisions for adding a fourth pump to meet buildout demand. Excavation for the pumps would be approximately 10 to 15 feet deep. The proposed project would also include on-site piping and paving for access roadways and sidewalks. The proposed BPS would be located within an enclosed masonry block building and include rooms for the pumping units, electrical equipment, and an emergency generator. The proposed BPS would include an on-site 18-inch diameter cement mortar lined and coated suction header. The proposed project would also construct approximately 2,200 linear feet of 18-inch diameter potable water transmission pipeline within the rights-of-way of Decker Road and Cajalco Road, as well as approximately 640 linear feet of 18-inch diameter suction piping, to convey water from the proposed BPS to the existing Cajalco Water Tank. Once construction of the proposed BPS is complete, the existing BPS on APN 317-060-043 would be removed. Existing pipelines would either stay in service or be abandoned.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS